Sidewalks, curbs and combined curbs and gutters shall be constructed in two courses.
A.
The base course shall consist of a 1:2:4 mix by volume of air-entraining portland cement, sand and gravel, mixed with water.
B.
The top course shall consist of a 1:3 mix by volume of air-entraining portland cement and sand, mixed with water, and shall be applied within 25 minutes after placing the base course. The top course shall be one inch thick and cover all exposed surfaces, including the face of curbs.