A development permit shall be obtained before construction or development begins, including placement of manufactured homes, within any area of special flood hazard established in § 99-7. Application for a development permit shall be made on forms furnished by the Construction Official and may include, but not be limited to; plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed structures, fill, storage of materials, drainage facilities; and the location of the foregoing. Specifically, the following information is required:
A. 
Elevation in relation to mean sea level, of the lowest floor (including basement) of all structures;
B. 
Elevation in relation to mean sea level to which any structure has been floodproofed.
C. 
Certification by a registered professional engineer or architect that the floodproofing methods for any nonresidential structure meet the floodproofing criteria in § 99-24; and,
D. 
Description of the extent to which any watercourse will be altered or relocated as a result of proposed development.
The Construction Official is hereby appointed to administer and implement this chapter by granting or denying development permit applications in accordance with its provisions.
Duties of the Construction Official shall include, but not be limited to:
A. 
Permit review.
(1) 
Review all development permits to determine that the permit requirements of this chapter have been satisfied.
(2) 
Review all development permits to determine that all necessary permits have been obtained from those federal, state or local governmental agencies from which prior approval is required.
(3) 
Review all development permits to determine if the proposed development is located in the floodway. If located in the floodway, assure that the encroachment provisions of 99-32.A[1] are met.
[1]
Editor's Note: So in original.
B. 
Use of other base flood and floodway date. When base flood elevation and floodway data has not been provided in accordance with § 99-7, Basis for establishing the areas of special flood hazard, the Construction Official shall obtain, review and reasonable utilize any base flood elevation and floodway data available from a federal, state or other source, in order to administer §§ 99-23A, Specific standards, Residential construction and 99-23B, Specific standards, Nonresidential construction.
C. 
Information to be obtained and maintained.
(1) 
Obtain and record the actual elevation (in relation to mean sea level) of the lowest floor (including basement) of all new or substantially improved structures, and whether or not the structure contains a basement.
(2) 
For all new or substantially improved floodproofed structures:
(a) 
Verify and record the actual elevation (in relation to mean sea level); and
(b) 
Maintain the floodproofing certifications required in § 99-12C.
(3) 
Maintain for public inspection all records pertaining to the provisions of this chapter.
D. 
Alteration of watercourses.
(1) 
Notify adjacent communities and the New Jersey Department of Environmental Protection, Bureau of Flood Control and the Land Use Regulation Program prior to any alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Insurance Administration.
(2) 
Require that maintenance is provided within the altered or relocated portion of said watercourse so the flood-carrying capacity is not diminished.
E. 
Substantial damage review
(1) 
After an event resulting in building damages, assess the damage to structures due to flood and non-flood causes.
(2) 
Record and maintain the flood and nonflood damage of substantial damage structures and provide a letter of Substantial Damage Determination to the owner and the New Jersey Department of Environmental Protection, Bureau of Flood Control.
(3) 
Ensure substantial improvements meet the requirements of §§ 99-23A, Specific standards, Residential construction, 99-23B, Specific standards, Nonresidential construction, and 99-23C, Specific standards, Manufactured homes.
F. 
Interpretation of firm boundaries. Make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazards (for example, where there appears to be a conflict between a mapped boundary and actual field conditions). The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in Article IV, Variance Procedure/Appeals.