Details of temporary and permanent stabilization
measures, including placement of the following statement on the plan:
"Following initial soil disturbance or redisturbance, permanent or
temporary stabilization shall be completed within: seven calendar
days as to the surface of all perimeter dikes, swales, ditches, perimeter
slopes, and all slopes greater than three horizontal to one vertical
(3:1); and fourteen days as to all other disturbed or graded areas
on the project site."