Once construction is complete, as-built certification, if deemed
necessary, shall be submitted by either a professional engineer or
professional land surveyor licensed in Maryland to ensure that the
ESD planning techniques, treatment practices, structural practices,
and conveyance systems comply with the specifications contained in
the approved plans. At a minimum, as-built certification shall include
a set of drawings comparing the approved stormwater management system
that was constructed.