These construction standards shall govern all
construction indicated in final submission of subdivisions within
the town, both on private land and on public land. Construction not
covered by these standards shall be in accordance with recognized
good practice, such as that contained in the State of New York's Department
of Transportation Specifications or recommendations of manufacturers'
associations. All such methods not covered by these standards require
approval of the town before construction begins.
A.
Maintenance and protection of traffic. The owner shall maintain traffic and protect the public from damage to person and property while construction is being performed in any public right-of-way or any private street. Travel shall be maintained over a reasonably smooth traveled way which shall be marked as necessary for the type of street so that a person who has no knowledge of conditions can safely, and with a minimum of discomfort and inconvenience, drive or walk over all or any portion of the street. The town shall determine whether one-way or two-way traffic shall be maintained. See § 112-27C for related information concerning excavation.
B.
Clean up and repair. The owner shall clean up all
debris or materials left as a result of his work and completely repair
damage caused by him to any public or private property, including
any existing street he may have used. Resetting of surveying points
and reseeding roadside areas are included in repairs required.
C.
Restoration of paved street surfaces.
(1)
All utilities within street rights-of-way shall be installed before streets are paved. However, repairs or reconstruction after paving may require pavement restoration which shall be accomplished as follows: backfilling shall be as required for backfill within a street right-of-way (see § 112-27H). The edge of the pavement shall be cut evenly with a chisel or saw at least 18 inches beyond the edge of the excavation. Base material and paving equal in thickness and quality to that of the original paving shall be constructed in accordance with the standards for pavement construction. The joint between original pavement and the patch shall be sealed with a crack sealer approved by the town.
(2)
Additionally, construction within existing town road
rights-of-way will require permission or a permit for construction
from the Town Highway Department. It will be the responsibility of
the owner to comply with all conditions and restrictions set forth
in said permit.
D.
Land for public use.
(1)
Land which the owner has offered for cession to the
town for recreation purposes shall be cleared of all debris, construction
shanties or materials belonging to the owner. Earth disturbed by the
owner's operations shall be graded and restored to a neat and acceptable
condition.
(2)
The owner shall also clear all dead trees and situations
which constitute a public hazard or nuisance as determined by the
town. The amount of clearing, grubbing and grading should be included
in the bond or letter of credit as authorized by the town or the Town
Engineer.
E.
Construction modifications in field. The town may
require construction of a type not contemplated at the time of final
review, provided that such requirements are for a higher type of construction.
This is to allow for proper construction to meet conditions not known
at the time of final review. Such construction changes shall be shown
on as-built drawings.
A.
General. Roadway construction materials which meet
the New York State Department of Transportation Specifications shall
generally be approved for construction. Other materials may be approved
by the town to be used instead of items from the Department of Transportation
Specifications. All roadway construction shall be controlled by stakes
for grade and alignment.
B.
Subgrade preparation.
(1)
All trees, brush, topsoil, stumps, roots more than
one-half (1/2) inch in diameter and rubbish shall be removed from
the area of the roadway. Boulders shall be removed to a depth of one
foot below the subgrade surface.
(2)
Muck, spongy material or other unsuitable material
shall be completely removed and the excavation filled with suitable
material.
(3)
The subgrade shall be compacted to 95% standard proctor
(ASTM D-698). The final compacted surface shall not be more than one-half
(1/2) inch higher than design subgrade in any location and shall be
the same cross-sectional shape as the final design grade. It shall
also be proof-rolled, with witnessing by the Town Engineer, to determine
if stabilization fabric may be required.
C.
Embankment.
(1)
No organic material, frozen material or other unsuitable
material shall be used in embankments. The compacted embankment shall
have a minimum dry density of 95% standard proctor (ASTM D-698).
(2)
The slopes of all embankments shall be stabilized
by spreading and rolling topsoil and seeding to obtain a satisfactory
stand of grass.
D.
Subbase construction. Materials and construction methods
for the pavement base course shall conform to Section 304 of the New
York State Department of Transportation Specifications and Town Highway
Standards, as determined by the Town Highway Superintendent.
[Amended 12-5-1996 by L.L. No. 2-1996]
E.
Surface construction. Materials and construction methods
for the binder course and wearing course shall conform to Section
403 of the New York State Department of Transportation and Town Highway
Standards, as determined by the Town Highway Superintendent.
[Amended 12-5-1996 by L.L. No. 2-1996]
F.
Curbs. Curbs shall be hot-mix, machine-laid bituminous
concrete of a cross section approved by the town. The curb shall be
constructed on previously laid pavement. A light tack coat shall be
applied unless the curb is placed on a freshly laid pavement. The
mix shall conform to the Town Highway Standards, as determined by
the Town Highway Superintendent.
[Amended 12-5-1996 by L.L. No. 2-1996]
H.
Underdrains. Materials and construction methods for
underdrain filters shall conform to the requirements of Section 605,
Underdrain, New York State Department of Transportation Specifications.
Pipe used shall be perforated polyethylene tubing.
A.
The construction of storm drainage facilities shall
be controlled by these standards and all other applicable town standards.
B.
All drainage pipe shall be installed in accordance
with applicable manufacturer's instructions and recommendations. Installation
shall conform to Section 603-3, New York State Department of Transportation
Specifications.
C.
All CAP shall have rerolled ends and all joints shall
be wrapped with filter fabric.
D.
All catch basins, manholes and drop inlets shall be
installed in accordance with Section 604-3, New York State Department
of Transportation Specifications.
E.
Appropriate erosion control methods shall be utilized
to avoid siltation of the storm system prior to establishment of lawns.
A.
General. Construction of sanitary sewerage facilities
shall be controlled by these standards and the requirements of the
Saratoga County Sewer District, where applicable.
B.
Maintaining existing services. The owner shall maintain
full service in the existing sewer system continuously. No discharge
of sewage to a point outside the system shall be permitted at any
time.
C.
House service. A Y-branch and house service extending
to the edge of the right-of-way or beyond, at a minimum grade of 1%,
shall be installed for each lot. A hardwood stake extending from the
sewer to the ground surface shall be installed at the end of each
house service before backfilling. The end of the house service shall
be sealed with an approved plug capable of producing a seal required
to withstand testing of the sewer main. The house service shall eventually
be connected to the building it serves before the town approves the
building construction. The house service shall be a minimum 10 feet
from any water service (horizontal). No house service shall be connected
to any building until all testing is completed.
D.
Tests. It is the intention of these construction standards
to secure a system with a minimum amount of infiltration. These tests
must be completed before house services are connected to the system.
(1)
Corroborative infiltration/exfiltration test (three
sections with greatest air loss).
(a)
Infiltration tests. Infiltration testing is
an acceptable leakage test only when the groundwater level is suitably
higher than the pipe. The owner shall furnish and maintain a V-notch
sharp crested weir in a wood frame tightly secured in the sewer system
at the locations directed by the town. The maximum allowable infiltration
shall be 50 gallons per mile, per inch of diameter of sewer main,
per twenty-four-hour day at any time. The period of testing shall
be a minimum of one hour.
(b)
Exfiltration tests.
[1]
Exfiltration testing is an acceptable leakage
test only in dry areas or when the groundwater level is suitably low.
The owner shall shall furnish and maintain the necessary plugs, stoppers,
water supply and measuring devices at locations required by the town.
All openings in the section of the system to be tested shall be securely
stopped and the section filled with water to provide a minimum of
two feet of head over all sewers in the section, or two feet higher
than the groundwater level, whichever is higher.
[2]
After filling, the system shall be allowed to
stand a minimum 12 hours before conducting the tests. The maximum
allowable exfiltration shall be 50 gallons per mile per inch diameter
of the sewer per twenty-four-hour day at any time. The maximum internal
pressure at the lowest point may not exceed 25 feet of water.
(2)
Low-pressure air tests.
(a)
The owner shall furnish and maintain the necessary
plugs, fittings, gauges and pumping system at locations directed by
the town. The duration of the testing shall be determined by the Town
Engineer from Table 4.4.1, taken from UNI-BELL Recommended Practice
for Low-Pressure Air Testing of Installed Sewer Pipe. The prescribed
pressure drop shall not exceed zero and five-tenths (0.5) psi from
3.5 psi to 3.0 psi in excess of the groundwater pressure above the
top of the pipe.
Table 4.4.1
| ||||
---|---|---|---|---|
Pipe Diameter
(inches)
|
Minimum Time
(minutes:
seconds)
|
Length For Minimum Time
(feet)
|
Time For Longer Length
(seconds)
| |
4
|
3:46
|
597
|
0.380 L
| |
6
|
5:40
|
398
|
0.854 L
| |
8
|
7:34
|
298
|
1.520 L
| |
10
|
9:26
|
239
|
2.374 L
| |
12
|
11:20
|
194
|
3.418 L
| |
15
|
14:10
|
159
|
5.342 L
| |
18
|
17:00
|
133
|
7.692 L
| |
21
|
19:50
|
114
|
10.470 L
| |
24
|
22:40
|
99
|
13.674 L
| |
27
|
25:30
|
88
|
17.306 L
| |
30
|
28:20
|
80
|
21.366 L
| |
33
|
31:10
|
72
|
25.852 L
| |
36
|
34:00
|
66
|
30.768 L
|
NOTES:
"L" is the excess test length beyond the length
for minimum time.
|
(b)
Any section of the sewer system that shows leakage
in excess of the allowable limits shall be repaired by means satisfactory
to the town. When the system has been demonstrated to be within allowable
limits, the owner shall remove all plugs, stoppers and weirs.
(3)
Deflection tests.
(a)
Sewers must be straight between manholes and
shall be tested for straightness by flashing a light from manhole
to manhole, lamping or by other suitable means. Sections found to
be unacceptable shall be subject to further deflection testing by
means of pulling an appropriately sized mandrel through the pipe.
The Town Engineer may also require this type of deflection testing
where construction encountered unstable trench walls or bottoms, heavy
rainfall, frozen soil, high groundwater levels, deep lines or improper
compaction.
(b)
The owner shall furnish and maintain the appropriate
size mandrels for the pipe size being tested, as determined from Table
4.4.2 based on seven and one-half percent (7 1/2%) allowable
deflection. All necessary rope, fittings and labor shall also be the
owner's responsibility. Any sections found to be unacceptable will
be repaired or replaced to meet town standards.
Table 4.4.2
| ||
---|---|---|
Specified Mandrel Size for
Pipe Diameter Indicated
| ||
Pipe Diameter
|
Mandrel Outside Diameter
(inches)
| |
6
|
5.31
| |
8
|
7.09
| |
10
|
8.85
| |
12
|
10.51
| |
15
|
12.86
| |
18
|
15.70
| |
21
|
18.50
| |
24
|
20.80
| |
27
|
23.43
|
A.
General. All water system components shall meet the
recommended standards for waterworks (New York State Department of
Health Bulletin No. 42). In addition, components shall be of approved,
unused materials, and manufacturers' recommended procedures shall
be employed.
B.
Water mains.
(1)
All soils to receive waterlines shall be tested for
pH by DIPRA or an approved laboratory to determine the need for polyethylene
wrap.
(2)
The full length of each section of pipe shall rest
solidly upon the pipe bed, with adequate recesses excavated for the
bells and joints. The interior of all pipe shall be thoroughly cleaned
of all foreign matter before being placed in the trench and shall
be kept clean during the laying operations by means of plugs or other
approved methods.
(3)
The pipe shall not be laid in water or when trench
conditions are unsuitable for the work, except by permission of the
Engineer. Water shall be kept out of the trench until the joints have
been completed. When work is not in progress, open ends of the pipes
shall be securely closed so that no trench water, earth or other substances
will enter the pipes or fittings.
(4)
Any section of pipe found to be defective before or
after laying shall be replaced with new pipe.
(5)
Lines shall be installed with a minimum of five feet
of cover.
(a)
Handling. Pipe and accessories shall be handled
in such a manner so as to ensure delivery on the work site in sound,
undamaged condition. Particular care shall be taken not to injure
pipe coatings. Rope or canvas slings shall be used in unloading, loading
and installation of pipe which cannot be placed by hand. The use of
chains or tongs shall not be permitted. All surface areas of coated
pipe that are damaged shall be recoated with hot bituminous material
equal to that used to factory coat the pipe.
(b)
Cutting. Cutting of pipe shall be done in a
neat and workmanlike manner without damage to the pipe or pipe lining.
Unless otherwise authorized by the town, all pipe cutting shall be
done by means of an approved type of mechanical cutter. Wheel-type
cutters shall be used when practical.
(c)
Placing and laying.
[1]
Before being lowered into the trench, all sections
of pipe shall be inspected for defects and tapped with a light hammer
to detect cracks. Defective, damaged or unsound pipe shall be rejected.
[2]
Deflections from a straight line or grade, as
required by vertical curves, horizontal curves or offsets, shall not
exceed that recommended by the appropriate specifications or, if not
specified, then 80% of the manufacturer's recommendations. If the
alignment requires deflections in excess of these limitations, the
owner shall provide special bends or a sufficient number of shorter
lengths to provide angular deflections within the limit set forth.
Bends shall be provided with thrust restraint.
[3]
Before jointing, all lumps, blisters, excess
coating material, oil and grease that will interfere with proper jointing
shall be removed from the ends of all pipes.
(d)
Mechanical joints. Mechanical joints shall be
made in accordance with the manufacturer's recommendations. Rubber
gaskets shall be used. Torque wrenches, calibrated in accordance with
the manufacturer's instructions, shall be used on the joint assembly.
(e)
Push-on joints. Push-on joints shall be made
in accordance with the manufacturer's recommendations.
(f)
Anchoring. All T-connections, bends and lead
ends shall be securely anchored in place by means of joint restraint
or concrete thrust blocks resting against undisturbed soil. Joint
restraint shall be used only if the method is shown on the approved
construction drawings or designed by a licensed professional engineer.
(g)
Testing. After the installation of the water
distribution system or sections thereof, the waterlines shall be filled
and all air blown off. The system or parts thereof shall then be subjected
to hydrostatic test. All testing shall be performed in the presence
of the town and shall be under the town's supervision. Hydrostatic
test and leakage allowances shall conform to AWWA C-600. If any section
of the distribution system shows a leakage greater than specified,
the leaks shall be located and repaired until the leakage is within
the specified limits.
(h)
Disinfection. Mains shall be disinfected in
accordance with AWWA C-601, after house services have been connected,
but prior to the issuance of a certificate of occupancy. Water containing
not more than 50 parts per million of free available chlorine shall
be allowed to stand in all lines and systems for at least 24 hours,
after which time there shall be at least 25 parts per million residual
chlorine remaining in the water. All new valves and hydrants shall
be operated while the lines are filled with heavily chlorinated water.
Following chlorination to the satisfaction of the town, all disinfecting
water shall be flushed from the lines until the chlorine residual
does not exceed one part per million. When all lines have been flushed
clean to the Town Engineer's satisfaction, the owner or his representative
shall collect samples of the water at locations directed by the Town
Engineer and under his supervision. The samples shall be sent to an
approved testing laboratory for bacterial analysis, and two copies
of the test results shall be sent to the town. The owner shall bear
all costs for such sampling and testing. Certificates of occupancy
may not be issued until chlorination results are satisfactory.
C.
Valves.
(1)
Valves shall be set with the stems vertical. After
valves have been installed and adjusted, they shall be tested for
operation under maximum operating pressure, shall be watertight and
shall operate easily.
(2)
Valve boxes shall be installed so that covers are
flush with the finish ground surface. Boxes shall be set vertical
and centered over the valve.
(3)
All valves shall be shown on the as-built drawings.
(4)
A valve record card shall be completed for each valve
installed. The card shall be furnished by the town and shall be returned
to the town when completely filled out.
D.
Hydrants.
(1)
Each hydrant shall be set vertical and shall be anchored
as indicated on the standard detail. Hydrants shall be set so that
the distance between the finish grade line and the hose connections
is between the limits indicated on the standard detail.
(2)
That portion of each hydrant below finish grade shall
be given a coat of hot bituminous material prior to installation.
This coating shall be equal to that used for coating of cast-iron
fittings and waterlines.
(3)
A hydrant record card shall be completed for each
hydrant installed. The card shall be furnished by the town and shall
be returned to the town when completely filled out.
(4)
The owner shall perform under the supervision of the
town fire flow tests in accordance with the Guide for Determination
of Required Fire Flow, published by Municipal Survey Service, Insurance
Services Office.
E.
Services.
(1)
All service taps shall be made with a service clamp,
unless factory installed. The corporation stop shall be inserted as
recommended by the manufacturer for the type pipe installed.
(2)
The service shall be installed in accordance with
backfilling requirements of these standards and in accordance with
standard details.
A.
General. All labor, materials, equipment, tools and
services required for the furnishing and installation of any type
of pipe shall conform to the following specifications:
B.
Pipe.
(1)
All pipe shall be installed in the sizes and to the
lines and grades shown or the approved subdivision drawings. The type
and specifications of pipe to be furnished and installed in each location
shall be as designated on the subdivision drawings. Pipe shall be
new pipe and shall be rejected if found not to meet the minimum requirements
set by the town.
(2)
All pipelines and appurtenances of whatever type or
description shall be constructed in an approved manner to the complete
satisfaction of the town.
(3)
Where lift holes are provided in concrete pipe, they
shall be filled with a stiff mortar mix after the pipe is installed
in the trench.
(4)
The owner, at his own expense, at all times during
the progress of the work, shall keep the trenches and excavations
free from water. Water from trenches and excavations shall be disposed
of in such a manner as will neither cause injury to the public health,
nor to the surface of streets, nor cause any interference with the
use of public rights-of-way. Water shall not be allowed to flow away
through newly laid sanitary sewers.
(5)
All pipe shall be installed to the limits of the approved
subdivision section and shall terminate in a manhole, catch basin,
hydrant or blowoff, as appropriate. Stubs shall be installed in manholes
and catch basins to provide for future extension of pipelines.
C.
Excavation generally.
(1)
Necessary arrangements shall be made by the owner
with all persons, firms or corporations owning or using any poles,
pipes, tracks, or conduits, etc. affected by his construction to maintain
and protect such facilities during construction. In the event that
any existing gas pipes, water pipes, conduits, sewers, tile drains
or poles are blocked or interfered with by the excavation required
on his project, the owner shall maintain them in continuous operation
and restore them to the same condition as they were prior to the start
of construction.
(2)
Sidewalks and pavements must be in no case blocked
or obstructed by excavated material, except with the approval of the
town and then only when adequate provisions have been made for a satisfactory
temporary passage of pedestrians and vehicles. Adequate bridging and
planked crossings must be provided and maintained across all open
trenches for pedestrians and vehicles then so ordered by the town.
Barriers, lights, flares and watchmen shall be provided and maintained
by the owner at all trenches, excavations and embankments as required
by the town.
(3)
The excavating of the trench shall not advance more
than 200 feet ahead of the completed masonry or pipe work, except
where it is necessary to drain wet ground. The width of trenches in
which pipe is to be installed shall be such as to provide adequate
space for workers to place and joint the pipe properly and shall be
generally the outside pipe diameter, plus three feet.
(4)
The owner shall furnish, put in place and maintain
such sheeting and bracing as may be required to support properly the
sides and ends of excavations and to prevent injury to the structure
built or to persons or property.
(5)
If at any time the town so orders, the owner shall
install such additional sheeting and bracing as may be required by
the State of New York, Department of Labor, by adverse soil conditions
or by the town; but compliance with such orders or failure on the
part of the town to exercise its right to give such order shall in
no way release the owner from liability for damage caused by weak
or insufficient sheeting nor from his responsibility to protect the
work and adjacent property. Voids appearing outside the sheeting shall
be immediately and compactly filled with suitable material and to
the satisfaction of the town.
(6)
All sheeting and bracing shall be in accordance with
the Industrial Code Rule No. 23 of the State of New York, Department
of Labor, Board of Standards and Appeals.
(7)
Trench bottoms shall be excavated to conform to the
type of bedding specified for the project.
(8)
Where excavations are opened and, in the opinion of
the town, the materials in place are not adequate for structural stability
of the completed work, the town may order the owner to carry the excavation
to an additional depth, furnish and place concrete cradles, sand or
gravel refill and/or timber and piling foundations.
(9)
The owner is responsible to call Underground Facilities
Protective Organization (1-800-962-7962) 48 hours prior to digging,
drilling or blasting to ascertain all available information on subsurface
structures and utilities.
D.
Rock excavation.
(1)
Excavation and trenches in rock shall be carried below
the pipe bottom with of one-fourth (1/4) the diameter of the pipe,
but in no case less than six inches below the pipe bottom, and shall
be made by any acceptable method, including use of explosives.
(2)
Where blasting is necessary, it shall be done by men
experienced in such work. All blasts shall be well covered and provisions
made to protect pipes, conduits, sewers, structures, persons and property
adjacent to the site of the work. Prior to the blast, all persons
in the vicinity shall be given ample warning. Blasting will not be
permitted between the hours of 6:30 p.m. and 6:30 a.m., except with
special permission, nor within 25 feet of the completed work.
(3)
All handling and use of explosives shall be in accordance
with Industrial Code Rules No. 23 and 30 of the New York Department
of Labor, Board of Standards and Appeals and Article 16 of the New
York State Labor Law.
(4)
The owner shall secure all permits required by law
for blasting operations and any additional hazard insurance required.
E.
Lines and grades. Gravity sanitary sewer pipe shall
be laid with a laser to assure compliance with approved lines and
grades, except house laterals which may be laid to grade with a surveyors
transit, level or other appropriate surveying instrument.
F.
Bedding. The class of bedding to be used shall be
as specified in the final submission drawings. There shall be excavation
for bells and flanges in all classes of bedding. Beddings for pipe
shall conform to one or more of the following:
(1)
First-class bedding.
(a)
First-class bedding is that method of laying
pipe in which the pipe is carefully bedded in compacted granular materials
placed on a flat trench bottom. The granular material shall be crushed
stone, pea gravel or sand, and maximum particle size shall be three-fourths
(3/4) inches. The depth of the granular bedding below the bottom of
the pipe shall be six inches.
(b)
Where crushed stone bedding is used in wet material
or when the pipeline is below the groundwater table, the bedding shall
be drained to a catch basin or drainage course as directed by the
Town Engineer.
(2)
Concrete cradle bedding.
(a)
Concrete cradle bedding is that method of bedding
pipe in which the lower part of the pipe exterior is bedded in plain
or reinforced concrete of 2,500 psi or greater, having a minimum thickness
under the pipe of one-fourth (1/4) the nominal inside diameter and
extending up the sides of the pipe for a height equal to one-fourth
(1/4) of the outside diameter.
(b)
The cradle shall have a width at least equal
to the outside diameter of the barrel of the pipe, plus eight inches
and it shall be constructed monolithically without horizontal construction
joints.
(3)
Concrete encasement. Concrete encasement is that method
of bedding pipe in which the entire pipe is jacketed by plain or reinforced
concrete having a compressive strength of 2,500 psi or greater. The
encasement width and height shall be at least equal to the outside
diameter of the barrel of the pipe plus eight inches or as shown on
the approved subdivision drawings. Normally stronger pipe should be
used with concrete cradle or encasement being permitted only in unusual
cases.
G.
Pipelaying.
(1)
Pipe shall be protected during handling against impact
shocks and free-fall. Pipe shall be kept clean at all times.
(2)
The laying of pipe in prepared trenches shall be commenced
at the lowest point with the spigot ends pointing in the direction
of flow.
(3)
All pipe shall be laid with ends abutting and true
to line and grade. They shall be carefully centered so that when laid
they will form a uniform invert.
(4)
Preparatory to making pipe joints, all surfaces of
the portions of the pipe to be jointed or of factory-made jointing
material shall be clean and dry. Lubricants, primers, adhesives, etc.,
shall be used as recommended by the pipe or joint manufacturer. The
jointing materials or factory fabricated joints shall then be placed,
fitted, joined and adjusted in such a workmanlike manner as to obtain
the degree of watertightness required.
(5)
Trenches shall be kept water-free and as dry as possible
during bedding, laying and jointing and for as long a period as required.
As soon as possible after the joint is made, sufficient backfill material
shall be placed along each side of the pipe to offset conditions that
might tend to move the pipe off line and grade.
(6)
All ends of pipe runs shall be capped with standard
stoppers or with a fitting provided with an approved joint.
H.
Backfilling.
(1)
All backfilling to the center line of the newly laid pipe shall be as specified under Subsection F, Bedding, to a point 12 inches over the top of the pipe. New York State Department of Transportation Type 4 select granular material shall be placed. Compaction shall occur evenly on both sides of the pipe, and mechanical compaction shall not be used until the backfill is eight inches above the pipe.
(2)
No frozen material shall be used for backfill.
(3)
When backfilling in open-cut across or within the
right-of-way limits of any street, road, highway or railroad, the
remainder of the backfill shall be select granular material. Backfill
shall be placed along the sides of the pipe in six-inch lifts and
compacted by hand or in 12 inches over the top of the pipe; the entire
trench shall be compacted by mechanical means. Placing of backfill
shall continue in twelve-inch lifts, each lift being compacted by
mechanical means until subgrade elevation is reached.
(4)
When backfilling in unpaved areas outside the right-of-way,
the excavated material may be used to complete the backfilling, provided
that all deleterious contents, if any, are removed as directed by
the town. The backfill shall be rounded off over the trench not higher
than eight inches. Materials shall be compacted in layers not more
than two feet thick by approved mechanical means.
(5)
No pipe shall be covered before permission is given
by the town. The town may require any pipe covered without adequate
notification be uncovered for inspection at the owner's expense.
(6)
Under no circumstances shall water be permitted to
rise in trenches before they are backfilled.
(7)
Backfilling shall be completed to a point two feet
above the top of all pipe laid each day. Operations shall be scheduled
so that the trench is completely backfilled to within 200 feet of
the end of the completed, installed pipeline at the end of each day.
(8)
Whenever timber sheeting is driven to a depth below
the elevation of the top of the pipe, that portion of the sheeting
below the elevation of the top of the pipe shall not be disturbed
or removed. Whenever timber sheeting is driven for the protection
of trench walls in water-bearing soil, no portion of such sheeting
below a level four feet over the top of the pipe shall be removed.
I.
Tunnels. Methods of excavation support and backfill
in tunnels made beneath existing structures, railroads, pavements
and sidewalks for the installation of pipe or conduits shall be subjected
to approval of the town and the governing regulatory agency before
work is begun.
J.
Jacking and boring. Methods of jacking or boring to
install pipe shall be approved by the town and the governing regulatory
agency before such work is started.
K.
Manholes and catch basins.
(1)
All manholes and catch basins shall be precast concrete
construction. Sanitary manholes shall utilize press wedge fittings.
All connections shall be made per the manufacturer's specifications.
(2)
All manhole joints between sections shall utilize
butyl rope joint sealer or and approved equal.
(3)
Precast concrete rings shall be laid with full mortar
joints.
(4)
Mortar shall consist of one part portland cement and
two parts clean masonry sand with 10% hydrated lime added.
(5)
Pipe placed through manholes or catch basin sidewalls
and stubs installed for future extensions shall extend through the
walls a sufficient distance to allow connection on the outside. Such
pipes shall be struck smooth on the inside in line with the inside
wall of the manhole. The manhole or catch basin masonry shall be carefully
constructed around all pipes, so as to prevent leakage along the outer
surfaces.
(6)
Frame castings shall be set in full mortar beds on
top of the masonry. Frames shall be set to the same grade as the roadway.
(7)
The top eight to 20 inches of the manhole or catch
basins directly under the casting shall be constructed of precast
concrete grade rings to provide for adjustment to grade and future
construction. Field cutting of precast manholes or catch basin sections
shall not be allowed for grade adjustment.
L.
Connections.
(1)
Connections of new lines to existing lines, when encountered
in construction and not shown on the subdivision drawings, shall be
made where ordered by the town. Such connections shall be made within
a manhole or catch basin in the case of sewers or storm drains, except
for house sewer and drain connections. In all such cases, the existing
line shall be located prior to laying any new pipe to ensure proper
alignment and straight continuation of existing lines.
A.
General. Concrete used in any type of construction
shall meet the strength and durability requirements of these standards
as determined by testing procedures specified herein. Materials used
shall meet the requirements of these standards and shall be approved
by the Board for the intended use.
B.
Materials.
(1)
Cement. Cement shall be one of the types approved
by the Board and the type selected shall be the proper one for its
intended use.
(2)
Aggregate.
(a)
Aggregates shall be approved by the Board. Aggregates
failing to meet these requirements but producing concrete of the required
quality as shown by special tests or actual service may be used with
the permission of the Board.
(b)
The maximum size of the aggregate shall be one-fifth
(1/5) of the narrowest dimension between sides of the forms within
which the concrete is to be cast and three-fourths (3/4) of the minimum
clear spacing between reinforcing bars or between forms and reinforcing
bars. For unreinforced slabs, the maximum size of aggregate shall
be one-third (1/3) the slab thickness.
(3)
Mixing water. Water used in mixing concrete shall
be clean and free from injurious amounts of oils, acid, alkalis, organic
materials, salts or other substances that may be deleterious to concrete
or steel.
C.
Quality of concrete.
(1)
Class of concrete. Concrete installed in various structures
or units shall be one of the three classes defined in the following
subsections. The class to be installed shall be as specified in the
subdivision final approval.
Class of Concrete
| |||||
---|---|---|---|---|---|
Class I
|
4000
|
psi
|
@
|
28 days
| |
Class II
|
3000
|
psi
|
@
|
28 days
| |
Class III
|
2500
|
psi
|
@
|
28 days
|
(2)
Water/cement ratio.
(a)
All concrete shall be proportioned on the basis
of water/cement ratio which is defined as the ratio of the total quantity
of water in the mixture, including the surface water carried by the
aggregate, to the quantity of cement. The ratio is expressed in United
States gallons, eight and one-third (8 1/3) pounds to the gallon
per each ninety-four-pound sack of cement.
(b)
Concrete that is subject to freezing temperatures
while wet shall have a water/cement ratio not exceeding six gallons
per bag and shall contain entrained air.
(3)
Concrete proportions and consistency.
(a)
The proportions of the concrete shall produce
a mixture that will work readily, with the placement method used,
into the corners and angles of the forms and around reinforcement.
Neither segregation of materials in the mixture nor the collection
of excess free water on the surface shall be permitted.
(b)
The slump of concrete shall be the minimum that
is practicable. When vibrators are used to consolidate the concrete,
the slump shall not exceed four inches, otherwise the slump shall
not exceed six inches.
(c)
The methods of measuring the concrete materials
shall be such that the proportions can be accurately controlled and
easily checked. Measurement of materials for ready-mixed concrete
shall conform to Specifications for Ready-Mixed Concrete (ASTM C-94).
D.
Tests on concrete.
(1)
Sampling. As the work progresses, concrete shall be
sampled in accordance with the American Society for Testing and Materials'
method of sampling fresh concrete (ASTM C-172).
(2)
Slump test. Slump tests shall be made according to
the American Society for Testing and Materials' method of test for
slump of portland cement concrete (ASTM C-143).
(3)
Compression test.
(a)
Compression test specimens shall be made and
cured according to the American Society for Testing and Materials'
Method of Making and Curing Concrete Compression and Flexture Test
Specimens in the Field (ASTM C-31). Not less than three specimens
shall be made for each test at each age, nor less than one test for
each 150 cubic yard of concrete of each class. At least one test per
day shall be made of each class of concrete used that day.
(b)
Specimens shall be taken by the owner or his
representative under the direction of the town and the tests made
by a laboratory approved by the town. The cost of transportation to
the laboratory and of testing the concrete cylinders shall be borne
by the owner. The owner shall furnish two copies of all test results
to the town.
(c)
Additional specimens cured under job conditions
may be required when, in the opinion of the town, there is a possibility
of the surrounding air temperature falling below 40º F. or rising
above 90º F.
(d)
The standard age of test specimens shall be
28 days, but seven-day specimens may be used, provided that the relationship
between the seven- and twenty-eight-day strengths of the concrete
is established by test for the materials and proportions used.
(e)
If after testing, the average strength of test
cylinders is found to be more than 10% below the required strength,
the town may elect either to permit such concrete to remain in place
and require the owner to forfeit from his performance bond an amount
agreeable to both the owner and the town or require the owner at his
own expense, to remove the concrete area deficient in the specified
strength and replace it with concrete of satisfactory quality.
E.
Mixing and placing concrete.
(1)
Preparation of equipment and place of deposit.
(a)
Before placement, all equipment for mixing and
transporting the concrete shall be cleaned, and all debris and ice
shall be removed from the places to be occupied by the concrete. Forms
and subbase shall be thoroughly wetted (except in freezing weather)
or oiled. The reinforcement shall be thoroughly cleaned of ice, dirt,
rust, scale or other coatings.
(b)
Standing water shall be removed from its place
of deposit before concrete is placed unless otherwise permitted by
the town. All laitance and other unsound materials shall be removed
from hardened concrete before additional concrete is added.
(2)
Mixing of concrete.
(a)
For job-mixed concrete, the mixer shall be rotated
at a speed recommended by the manufacturer. Each batch of one cubic
yard or less shall be mixed for at least one minute after all materials
are in the mixer. The mixing time shall be increased 15 seconds for
each additional cubic yard or part thereof. The entire batch shall
be discharged before the mixer is recharged.
(b)
Ready-mixed concrete shall be mixed and delivered
in accordance with Specifications for Ready-Mixed Concrete (ASTM C-94).
(3)
Conveying of concrete.
(a)
Concrete shall be conveyed from the mixer to
the place of final deposit by methods that will prevent separation
or loss of materials.
(b)
Equipment for chuting, pumping and pneumatically
conveying concrete shall be of such size and design as to achieve
a practically continuous flow of concrete at the delivery and without
separation of materials.
(4)
Placing of concrete.
(a)
Concrete shall be deposited as nearly as practicable
in its final position to avoid segregation due to rehandling or flowing.
The placing of concrete shall be carried on at such rate that concrete
is at all times plastic and flows readily into the spaces between
the bars. No concrete that has partially hardened or been contaminated
by foreign material shall be deposited on the work, nor shall retempered
concrete be used.
(b)
When concreting is once started, it shall be
carried on as a continuous operation until concreting of the panel
or section is completed. When construction joints are necessary, they
shall be made in accordance with accepted practice or as approved
by the Board.
(c)
All concrete shall be thoroughly consolidated
by suitable means during placement. It shall be thoroughly worked
around reinforcement and embedded fixtures and into the corners of
the forms. Tools used shall be such that they will not cause segregation
of aggregates.
(5)
Curing of concrete. Provision shall be made for maintaining
concrete in a moist condition for a period of at least five days after
placement. For high-early-strength concretes, however, moist curing
shall be provided for at least the first two days when concrete and
air temperatures are above 50º F.; longer periods of curing shall
be required when temperatures are below 50º F.
(6)
Cold weather concreting.
(a)
Adequate equipment shall be provided for heating
concrete materials and protecting concrete during freezing or near-freezing
weather. No frozen materials or materials containing snow or ice shall
be used in the concrete.
(b)
All reinforcement, forms, fillers and ground
with which the concrete is to come in contact shall be free from snow
and ice. Whenever the temperature of the surrounding air is below
40º F., all concrete placed in the forms shall have a temperature
of 45º F., or higher after placement.
(c)
Adequate means shall be provided for maintaining
this temperature for four days. When high-early-strength concrete
is used, a temperature of 45º F., shall be maintained for three
days. In either case, any additional time necessary to ensure proper
curing of the concrete shall be provided as directed by the town.
(d)
The housing, covering or other protections used
in connection with curing shall remain in place and intact at least
24 hours after the artificial heating is discontinued. No dependence
shall be placed on salt or other chemicals for the prevention of freezing.
(7)
Hot weather concreting.
(a)
In hot weather, suitable precautions shall be
taken to avoid drying of the concrete prior to finishing operations.
Use of windbreaks, sunshades, fog sprays or other devices shall be
provided as directed by the town.
(b)
Concrete deposited in hot weather shall not
have a placing temperature that will cause difficulty from loss of
slump, flash set or cold joints. Concrete temperatures shall be less
than 90º F.
(8)
Forms.
(a)
Forms shall conform to shapes, lines and dimensions
of the members as called for in the subdivision final submission and
shall be sufficiently tight to prevent leakage of mortar. They shall
be properly braced or tied together so as to maintain position and
shape.
(b)
Forms shall be removed in such a manner as to
ensure the complete safety of the structure. Where the structure is
supported on shores, the removable floor forms, beams and girder sides
and column and similar vertical forms may be removed after 24 hours,
provided that the concrete is sufficiently hard. In no case shall
the supporting forms or shoring be removed until members have acquired
sufficient strength to support their weight and imposed loads safely.
(9)
Placing and splicing of reinforcements. The reinforcement
shall be protected by the thickness of the concrete indicated in the
subdivision final approval. Where not otherwise shown, the thickness
of concrete over the reinforcement shall be as follows:
(a)
Where concrete is deposited against the ground
without the use of forms: not less than three inches.
(b)
Where concrete is exposed to the weather or
to the ground but placed in forms: not less than two inches for bars
larger than No. 5 and one and one-half (1 1/2) inches for No.
5 bars or smaller.
(c)
In slabs and walls not exposed to the ground
or to the weather: not less than three-fourths (3/4) inches.
(d)
In beams, girders and columns not exposed to
the ground or to the weather: not less than one and one-half (1 1/2)
inches.
(e)
In all cases: at least equal to the diameter
of bars or one and one-half (1 1/2) times the side dimension
of a square bar.
A.
General. Underground cable for telephone and/or electric
service shall be installed in conformance with requirements listed
herein and other sound installation practices.
B.
Sequence of construction. Installation of cable and
conduit shall be subsequent to right-of-way grading, but prior to
any paving operations. Grading shall be within six inches of proposed
final grade.
C.
Conduit. Rigid conduit shall be placed under all roadways
prior to the installation of the cable. Conduit of appropriate size
shall conform to the National Electric Code. Conduit installation
is to conform to excavation and backfilling items under Section 206,
New York State Department of Transportation Specifications, with the
sand backfill to be at least six inches below and six inches above
the conduit.
D.
Identification. To protect from inadvertent cuts into
any buried cable, there shall be placed approximately one foot above
such cable a continuous ribbon of brightly colored, nonreactive plastic.
E.
Documentation. The developer shall indicate all cable
and conduit locations on the as-built drawings when submitted to the
town.