[Amended 9-22-2009 by Ord. No. 09-24]
A.
Following approval of the preliminary plan by the Commission and the submission of plans for improvements within the proposed subdivision to the appropriate state or County agencies, the applicant shall submit a record plat for approval by the Commission 30 days prior to the business meeting at which the plan is to be considered.
B.
Such record plat may be for all the property included in the preliminary plan or it may be limited to any portion thereof, which is intended to be developed as a unit. Additional record plats, covering additional units of the property, may be submitted later, provided that the preliminary plan is still valid. Every record plat shall be substantially in accordance with the approved preliminary plan, including any changes or additions required by the Commission as a condition for its approval, and it shall conform in every respect to the requirements for the preparation of such plat as set forth in Appendix A[1] of this chapter and Articles X, Required Improvements, and XI, Design Requirements and Standards.
[1]
Appendix A is included at the end of this chapter.
E.
The Commission shall make a determination of the plat's compliance with the conditions of preliminary approval. The Commission shall approve, approve with conditions, disapprove, or table a plat within 45 days after acceptance by the Commission of the plat and all necessary supporting documentation, otherwise such plat shall be deemed to have been approved and a certificate to that effect shall be issued by the Commission upon demand. Criteria for disapproving a final plan shall include, but not be limited to, material difference from the approved preliminary plan or inconsistency with the adopted Kent County Comprehensive Plan. The forty-five-day approval period may be extended by mutual agreement between the Commission and the applicant. Should the Commission determine the plan is not consistent with the codes and regulations of the County, the reasons for such determination shall be provided to the applicant within 10 working days following the Commission meeting.
F.
Following approval by the Commission, the applicant shall then provide Commission's staff with at least one paper copy of the plan, an electronic copy of the record plan, one Mylar (or equivalent), and the fee for recordation of the approved subdivision plat. The plat must be recorded within the time limits established by § 187-21D above. If the plat is not recorded within that time limit, even after Commission approval, the plat will be deemed to be expired. Should the approval lapse, another application, including the fee, and review will be required.
G.
The record plan (both the paper copies and the Mylar) must be signed by the owner and signed and sealed by the engineer or surveyor. Upon receipt of the record plan by the Commission's staff, signatures of the Planning Director or designee and the County Administrator or designee will be obtained on the plan prior to recordation. The Commission's staff will then record the plan in the office of the Recorder of Deeds for Kent County.