A.
Qualifications. No person not recognized by the Department of Public Works as a duly qualified sidewalk contractor shall be authorized to construct any sidewalk, curb or curb cut on or adjacent to any street, highway, public place or other Village properties; and such persons before engaging upon such work must first obtain from the Village Clerk a permit authorizing such construction.
B.
Fees. At the time of making application to the Village for a permit to construct a sidewalk, curb or gutter, the owner or agent shall pay the Village the engineering costs for establishing line and grade for the proposed construction, such costs or charges to be at the levels fixed from time to time by resolution of the Board of Trustees of the Village of Rockville Centre.
[Amended 12-4-1972]