Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Girard, PA
Erie County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
This chapter shall be known and may be cited as the "Girard Township Subdivision and Land Development Ordinance."
This chapter is adopted for the following purposes:
A. 
To assist the orderly and efficient development of Girard Township;
B. 
To promote the health, safety, and general welfare of the residents of Girard Township;
C. 
To secure equitable handling of all subdivision plans by providing uniform procedures and standards;
D. 
To implement the Girard Township Comprehensive Plan and updates thereof.
No subdivision or land development of any lot, tract, or parcel of land shall be effected, no street, sanitary sewer, storm sewer, water main, or other facilities in connection therewith shall be laid out, constructed, opened or dedicated for public use and travel, or the common use of occupants of building abutting thereon, except in accordance with the provisions of this chapter. No lot in a subdivision or land development may be sold, no permit to erect, alter or repair any building in a subdivision or land development may be issued, unless and until a plan of such a subdivision or land development shall have been approved and properly recorded, and until the improvements required by the Board of Supervisors in connection therewith shall have either been constructed or guaranteed as herein provided.
Pursuant to Section 303(d) of the Pennsylvania Municipalities Planning Code (MPC),[1] this chapter is intended to implement the Girard Township Comprehensive Plan and the community development goals and objectives stated below. Interpretation of the extent of these areas shall be based upon maps within the Comprehensive Plan and Chapter 200, Zoning, of the Code of the Township of Girard.
A. 
Growth and development statement. Girard Township should remain predominantly rural by concentrating intensive growth and development where infrastructure (especially public water and sewer) can support it in a high-quality setting. These areas are listed below by location:
(1) 
Concentrate revitalization efforts in the downtown areas of Girard and Lake City Boroughs. This could occur as either infill or redevelopment and would serve community needs for retail, service commercial, and high-density residential uses.
(2) 
Where there are no environmental limitations, encourage development of vacant lands within the jurisdiction of Girard Borough and Lake City Borough but previously undeveloped. Opportunity exists here for provision of housing with full utilities. The presence of such utilities means that higher densities can be supported without presenting a threat to public health and safety.
(3) 
Intensive, dense growth and development within the jurisdiction of Girard Township should occur within the area to the east of the two Boroughs between Ridge Road (Route 20) and Middle Road. This development can, and should be, carefully planned to avoid conflicts with agriculture.
(4) 
The area in the immediate vicinity of the Meadville Road interchange with I-90 has potential for some targeted growth and development if combined with on-site utilities (if needed) and buffering to protect preexisting lower-intensity uses.
(5) 
Parts of the area north of West Lake Road and west of Elk Creek have potential for a variety of specialized, very high-intensity uses. However, environmental protection shall be a high priority of any development, due to the proximity to key recognized natural resources.
B. 
Character of future growth. Future growth should be of a character that either enhances the rural nature of the Township or does not detract from it. Such uses would include low-density housing, agriculture, and small businesses which do not require infrastructure. Such development should be compatible and planned with respect to local values, especially:
(1) 
The valuable resource of the Elk Creek, its high-water quality, and its floodplains, which serves the community as green infrastructure.
(2) 
The limited resource of groundwater in sufficient quantity to support community needs.
(3) 
The heritage of high-value agriculture concentrated in fruit and vegetable production unique in Pennsylvania.
(4) 
The integrity of existing single-family development, with some of the highest quality, yet affordable, housing stock in Erie County.
(5) 
The relationship between the Township and neighboring small towns, which provide many important regional services.
(6) 
The limited resource of Lake Erie frontage, which cannot be replicated.
(7) 
The scenic resources, such as the Gudgeonville Valley, which contribute to the quality of the community.
[1]
Editor's Note: See 53 P.S. § 10303(d).
This chapter as set forth herein may be amended, altered or revised by the Board of Supervisors from time to time after a public hearing is held pursuant to public notice. In case of an amendment other than that prepared by the Planning Commission, the Board of Supervisors shall submit each such amendment to the Planning Commission and the Erie County Department of Planning for recommendation at least 30 days prior to date of the public hearing.
Whenever there is a difference between the minimum standards or dimensions specified herein and those contained in other regulations, resolutions or ordinances of Girard Township, the highest standards shall govern.