Nothing contained in this chapter or amendment
thereof shall require any change in the plans, construction or designated
use of the building for which a permit has been issued, provided construction
or use thereof has been started prior to the adoption hereof, or to
an amendment hereto or where valid contracts for such construction
or use have been entered into prior to the adoption of this chapter
or amendment made thereto.
[Added 3-16-2006 by L.L. No. 9-2006; amended 4-17-2008 by L.L. No. 5-2008]
A building permit application shall be made, along with the required documentation specified in §
625-6, along with a nonrefundable filing fee as set from time to time by the Board of Trustees. The cost for an approved building permit will be as set from time to time by the Board of Trustees.
[Added 7-20-2017 by L.L.
No. 12-2017]
Fees for the following shall be set from time to time by the
Board of Trustees:
A. Scanning
of filed application documents for internal Building Department database,
payable at the time that a final determination is rendered on the
application.
B. Duplicates
and photostats of any document on file with the Building Department.
C. Duplicates
and photostats of full-size building plans.