The fee for a construction permit shall be the sum of the applicable subcode fees hereinafter set forth and shall be paid before the permit is issued. All fees shall be paid through the Borough construction official.
A.
Building subcode fee. The building subcode fee shall be as provided in § 111-3B.
B.
Plumbing subcode fee. The plumbing subcode fees shall be set forth in § 111-3B.
C.
Electrical subcode fee. The electrical subcode fee, as provided in § 111-3B, shall be payable to the Borough together with any and all fees which shall be duly established from time to time by the on-site inspection agency.
D.
Fire protection subcode fee. The fire protection subcode fees shall be as set forth in § 111-3B.