Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Rocky Hill, CT
Hartford County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Town Council of the Town of Rocky Hill as indicated in article histories. Amendments noted where applicable.]
GENERAL REFERENCES
Planning and Zoning Commission — See Charter, § C6-8.
Town Planner — See Ch. 38, Article VII.
Numbering of buildings — See Ch. 182.
[Adopted 7-15-1974 by Ord. No. 46-74]
The Planning and Zoning Commission is hereby authorized and empowered to name and/or rename any and all existing, proposed or new Town roads, streets and highways.
No renaming noted in § 50-1 shall be enacted by the Commission until a public hearing is held thereon after reasonable notice thereof.
[Adopted 5-3-2004 by Ord. No. 222-04]
A. 
In accordance with the provisions of C.G.S. § 22a-354a et seq., the Planning and Zoning Commission is hereby designated as the Aquifer Protection Agency (hereinafter the "Agency") of the Town of Rocky Hill, CT. (The staff of the Planning Department shall serve as the staff of the Agency, with other Town staff serving on an as-needed basis.)
B. 
Members of the Planning and Zoning Commission shall serve coexisting terms of the Agency. The membership requirements of the Agency shall be the same as those of the Planning and Zoning Commission, including, but not limited to, the number of members, terms, method of selection and removal of members, and filling of vacancies.
C. 
At least one member of the Agency or staff of the Agency shall complete the course in technical training formulated by the Commission of Environmental Protection of the State of Connecticut, pursuant to C.G.S. § 22a-354f.
The Agency shall adopt regulations in accordance with C.G.S. § 22a-354p and R.C.S.A. § 22a-354i-3. Said regulations shall provide for:
A. 
The manner in which boundaries of aquifer protection areas shall be established and amended or changed.
B. 
Procedures for the regulation of activity within the area.
C. 
The form of an application to conduct regulated activities within the area.
D. 
Notice and publication requirements.
E. 
Criteria and procedures for the review of applications.
F. 
Administration and enforcement.
A. 
In order to carry out the purposes of the Aquifer Protection Program, the Agency will conduct an inventory of land use within the area to assess potential contamination sources.
B. 
Not later than three months after approval by the Commission of the Connecticut Department of Environmental Protection of Level B Mapping aquifers, the Agency will inventory land uses overlaying the mapped zoned of contribution and recharge areas of such aquifers in accordance with guidelines established by the Commissioner pursuant to C.G.S. § 22a-354f. Such inventory shall be completed not more than one year after authorization of the Agency. (C.G.S. § 22a-354e).