Prior to the release of the security posted with the Town Board to enable the acceptance of a proposed street or highway by such Board as provided by Article
III and Article
V of this Part
1, there shall have been set by a licensed land surveyor, at the expense of the owner, an adequate number of monuments to properly and accurately locate the right-of-way of the proposed street or highway.
The monuments shall be of a design satisfactory to the Town Superintendent
of Highways, and when set the elevation of the top of each installed monument
shall be established in respect to United States Government datum as determined
by the United States Geological Survey and the United States Coast and Geodetic
Survey.
Prior to the release of the aforementioned security by the Town Board,
the owner shall furnish the Board the affidavit of the licensed land surveyor
verifying the accuracy of the location and elevation of each monument set
to locate the right-of-way of the street or highway, together with a map showing
necessary ties between the monuments and the right-of-way lines of the proposed
street or highway.