[Adopted ATM 4-2-1979, Art. 43]
Split-island facilities may be allowed if Sec. (b) and (c) of Rule 43
(2) FPR No. 4 are deleted and the following requirements added:
A. The controlling mechanism console providing power to
the pump motor shall be in constant attendance by the owner, operator or duly
authorized employee at all times while motor oil is being dispensed and shall
be properly protected against physical damage from motor vehicles. Constant
attendance shall mean that the console operator must be at the console during
its operations.
B. There shall be constant contact between the controlling
mechanism console operator and the pump island by means of intercommunication
system which shall be maintained in proper operating condition at all times
while motor fuel is being dispensed.
C. A means shall be provided for the controlling mechanism
console operator to observe the filling operations of each vehicle, and the
dispensing of motor fuel shall be continuously observed by the console operator
during the time that any of the pumps have been activated to dispense motor
fuel.