Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Pinedale, WY
Sublette County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Easements with right-of-way widths of 10 feet shall be provided on each side of all rear lot lines and along certain side lot lines where necessary for utilities.
Where a subdivision is transversed by a watercourse, drainageway, channel or stream, there shall be provided a stormwater easement or drainage right-of-way conforming substantially with the lines of such watercourse, and such further width or construction, or both, as will be adequate for the purpose. All property within the subdivision must have adequate drainage, and the drainage of the entire subdivision must be approved by the Town Engineer. The Town Council may in its discretion cause the subdivider to make appropriate changes for the provision of adequate drainage prior to approval of the plat.