Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Clinton, NJ
Hunterdon County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Mayor and Council of the Township of Clinton 3-13-2002 by Ord. No. 767-02. Amendments noted where applicable.]
GENERAL REFERENCES
Fire prevention — See Ch. 133.
Land use regulations — See Ch. 165.
See Chapter 4, §§ 4-47 and 4-48 of this Code.
Pursuant to N.J.S.A. 40:49-5.1 et seq. the Township of Clinton hereby adopts N.J.A.C. 5:23-1.1 et seq. entitled "Uniform Construction Code Regulations" and N.J.A.C. 5:23A-1.1 et seq. entitled "Construction Board of Appeals" by reference for the Township of Clinton, the same being authorized by N.J.S.A. 52:27D-123.
[Amended 8-11-2004 by Ord. No. 858-04; 10-13-2004 by Ord. No. 862-04; 12-12-2007 by Ord. No. 948-07; 5-27-2009 by Ord. No. 981-09; 3-25-2015 by Ord. No. 1061-15]
The Uniform Construction Code Fee Schedule shall be as follows:
A. 
Administrative and certificate fees.
(1) 
Certificate of occupancy:[1]
(a) 
Schedule 1: 10% of permit fee. Minimum fee: $75.
[Amended 5-23-2018 by Ord. No. 1112-18]
(b) 
Schedule 2: 10% of permit fee. Minimum fee: $75.
[Amended 5-23-2018 by Ord. No. 1112-18]
(c) 
Asbestos hazard abatement: $14.
(d) 
Lead hazard abatement: $28.
[1]
Editor's Note: See Building Subcode Fee Schedule at the end of this chapter for an explanation of the schedule designations referred to in Subsection A(1)(a) and (b).
(2) 
Certificate of continued occupancy: $300.
[Amended 5-23-2018 by Ord. No. 1112-18]
(3) 
Certificate of occupancy pursuant to a change of use: $300.
[Amended 5-23-2018 by Ord. No. 1112-18]
(4) 
Temporary certificate of occupancy: $30. The fee shall be waived for the first issuance of a temporary certificate of occupancy, provided a fee for a certificate of occupancy is paid at that time.
[Amended 5-23-2018 by Ord. No. 1112-18]
(5) 
Certificate of approval: no charge.
(6) 
Certificate of compliance (includes electrical certificate of compliance for commercial pools, spas, or hot tubs): no charge.
(7) 
Variations.
(a) 
Residential (R-3, R-5), single item: $100.
(b) 
Residential (R-3, R-5), multiple within one unit or prototype to development: $250.
(c) 
All other use groups: $400.
(8) 
Plan review fee shall be 5% of the amount charged for the permit of all prototype releases. The fee shall be 20% for all other reviews. The fee shall be paid before the plans are reviewed. Plan review fees are not refundable.
(9) 
Minimum fee per subcode applied for: $75.
[Amended 5-23-2018 by Ord. No. 1112-18]
(10) 
State of New Jersey training fees: per N.J.A.C. 5:23-4.19(b).
(11) 
Annual permit: state fee schedule [consistent with requirements as set forth in N.J.A.C. 5:23-4.20(c)5].
(12) 
Change of contractor fee: $50 per subcode.
[Added 5-23-2018 by Ord. No. 1112-18[2]]
[2]
Editor's Note: This ordinance also repealed former Subsection A(12), which listed the fee for off-hour inspections.
(13) 
Plan review fee of an amended plan once a permit has been issued: $70 per hour, with a minimum charge of $35.
B. 
Building subcode fees.[3]
[3]
Editor's Note: The building subcode fees are included in a table at the end of this chapter.
C. 
Electrical subcode fees. (See Subsection H of this section for fees concerning carnivals and other temporary special events.)
[Amended 7-28-2010 by Ord. No. 1005-10; 5-23-2018 by Ord. No. 1112-18]
Item
Based on
Cost
Devices
Includes total of lighting fixtures, receptacles, switches, detectors, light poles, motors - fractional HP, emergency and exit lights, communication points and alarm devices/fire alarm control panel(s)
First 10 items
$70
Each additional 25 or portion of 25 items
$25
Pools
Pool permit/with underwater light(s)
Flat fee
$125 each
Storable pool, spa, hot tub
Flat fee
$100 each
Annual inspection. of commercial pools, spas, or hot tubs [per N.J.A.C. 5:23-4.18(1)]
Flat fee
$125 each
Motors and apparatus rated in/by horsepower
Includes, but is not limited to garbage disposal, space heater/air handler, motors, all other, 1 HP and over
Equal to or greater than:
1 HP up to 5 HP
5 HP up to 50 HP
50 HP up to 100 HP
100 HP
$50 each
$100 each
$200 each
$600 each
Transformers and app. rated in/by kilowatt
Includes, but is not limited to electric range/receptacle, oven/surface unit, electric water heater, electric dryer/receptacle, dishwasher, central A/C unit, space heater/air handler, baseboard heat, transformers/generators, electric sign/outline lighting
Equal to or greater than:
1 KW up to 5 KW
5 KW up to 50 KW
50 KW up to 100 KW
100 KW
$50 each
$50 each
$200 each
$600 each
Service panels, panels and MCCs rated in amperes
Includes, but is not limited to, service, subpanels, motor control center
Equal to or less than 200 amperes
$100 each
Greater than 200, equal to or less than 600 amperes
$250 each
Greater than 600 amperes
$800 each
D. 
Elevator subcode fees. Permit fees for elevator inspections shall be charged at the rate established by N.J.A.C. 5:23-12.6.
[Amended 5-23-2018 by Ord. No. 1112-18]
E. 
Fire protection subcode fees.
[Amended 5-23-2018 by Ord. No. 1112-18]
Item
Based on
Cost
Tanks (installation)
Residential, R-3, R-4, R-5
Each
$50
All others, up to 999 gallons
Each
$125
All others, 1,000 gallons and over
Each
$200
Tank removals
Each
$75
Alarm, signal and supervis. devices
First 12 items
$50
Includes, but is not limited to, total of smoke/heat detectors, pull stations, water flow switches, horns, strobes, bells tamper switches, low/high air switches
Each additional 10 or portion of 10 items
$25
Suppression system devices
Dry pipe/alarm valve
Each
$100
Preaction valve
Each
$100
FDC connection
Each
$100
Fire pump
Each
$250
Post indicator valve
Each
$100
Fire hydrant
Each
$150
Underground fire main
Each
2% of cost of work, $75 minimum
Other suppression system devices not listed above
Each
$75
Sprinkler heads (wet and dry)
1 to 9
$85
10 to 49
$175
50 to 99
$300
100 to 199
$600
200 to 299
$900
300 and over
$1,200
Standpipes
Each
$325
Pre-engineered systems
Wet chemical
Each
$220
Dry chemical
Each
$220
CO2 suppression
Each
$220
Foam suppression
Each
$220
Halon suppression
Each
$220
Smoke control systems
Each
$300
Kitchen hood exhaust systems
Each
$220
Commercial gas or oil-fired systems
Each
$75
Commercial spray booth
Each
$300
Appliances, other:
Woodburning firplace or stove
Each
$75
Chimney liner
Each
$60
Metal chimney
Each
$75
Incinerator
Each
$1,000
Crematorium
Each
$1,000
Commercial gas or oil appliance
Each
$100
Residential appliances
Each
$40
F. 
Mechanical subcode fees (in R-3, R-4 and R-5 Use Groups only).
[Amended 5-23-2018 by Ord. No. 1112-18]
Fixture/Equipmenta
Based on
Cost
Water heatera,b,d
Flat fee for each item
$75
Fuel oil pipingc
Each additional item
$25
Gas pipingc
Steam boilera,b, d
Hot water boilera,b,d
Hot air furnacea,d
Oil tanks
$100
LP tanks
$30
New gas piping and fuel oil piping
Per plumbing subcode fee schedule
New ductwork
$150
Chimney liner
Flat fee
$75
NOTES:
a If new electrical work is required in the installation of fixture/equipment a properly filed Electrical Subcode Technical Section Form F-120B must be filed with the application for permit and certified as required by the Electrical Contractors Licensing Act, N.J.S.A. 45:5A-1 et seq. N.J.S.A. 45:1-14 et seq. and N.J.A.C. 13:31.
b If replacement of fixture/equipment will encompass backflow or cross connection work a separate Plumbing Subcode Technical Section Form F-130B must be filed with the application for permit and certified as required by the Master Plumbers Licensing Act, N.J.S.A. 45:14C-7 et seq., N.J.S.A. 45:1-3.2. et seq. and N.J.A.C. 13:32-1.
c If replacement of fixture/equipment will include fuel, or gas or hydronic piping as part of the proposed work, fee(s) are based on the fixture/equipment only.
d A chimney verification for replacement of fuel-fired equipment may be accepted per N.J.A.C. 5:23-2.20(c).
G. 
Plumbing subcode fees.
[Amended 5-23-2018 by Ord. No. 1112-18]
Fixture/Equipment
Based on
Cost
Water closet
Each
$20
Urinal/bidet
Each
$20
Bathtub
Each
$20
Lavatory
Each
$20
Shower
Each
$20
Floor drain
Each
$20
Sink
Each
$20
Dishwasher
Each
$20
Drinking fountain
Each
$50
Washing machine
Each
$20
Hose bib
Each
$20
Water heater
Each
$75
Fuel oil piping
Flat fee
$75 for the first 4 appliances; $20 for each additional appliance
Gas piping
Flat fee
$75 for the first 4 appliances; $20 for each additional appliance
Steam boiler
Each
$200
Hot water boiler
Each
$200
Sewer pump
Each
$50
Interceptor/separator
Each
$200
Backflow preventer (lawn sprinkler)
Each
$75
Grease trap
Each
$200
Sewer connection
Each
$75
Water service connection
Each
$75
Stacks
Each
$20
For residential appliances in Use Groups R-3, R-4, and R-5, see the Mechanical Subcode Fees.
Other:
Active solar systems
Each
$300
Commercial heating and equipment
Each
$75
Roof drains
Each
$25
Water cooled AC or refer. units
Each
$300
Cross-connections and backflow preventers subject to testing and requiring reinspection or annual testing
Flat fee
$100
LP tanks
Flat fee
$30
Hydronic piping
Flat fee
$30
H. 
Electrical subcode fees for carnivals and other temporary special events. Fees for electrical inspections in connection with carnivals, as defined by N.J.A.C. 5:14A-1.1, et seq., or other temporary special events that entail four or more electrical items for which inspection is required, shall be consistent with the fees established in Subsection C of this section for the three lowest cost items being inspected. For each additional item, the fees shall be 1/2 of the amount established in Subsection C. For the purpose of this Subsection H, a temporary special event is an event, including, but not limited to, a tradeshow, concert, or other community assembly, with a duration of seven days or less.