Exciting enhancements are coming soon to eCode360! Learn more 🡪
City of Papillion, NE
Sarpy County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
This district is intended to reserve sites appropriate for the location of industrial uses with relatively limited environmental effects. The district is designed to provide appropriate space and regulations to encourage good quality industrial development, while assuring that facilities are served with adequate parking and loading facilities. The LI Limited Industrial District is appropriately used in areas designated by the Papillion Comprehensive Plan as Mixed Use-2, business park, and industrial.
[Amended 5-3-2016 by Ord. No. 1717; 5-3-2016 by Ord. No. 1731; 2-19-2019 by Ord. No. 1817]
Regulator
All Permitted Uses
Minimum lot area (square feet)
10,000
Minimum lot width (feet)
50
Minimum yards (feet)
Front yard
(Note 1)
Interior side yard
10
Street side yard
(Note 1)
Rear yard
10
Maximum height (feet)
75
Maximum building coverage
60%
Maximum impervious coverage
80%
Maximum amount of total parking located in street yard
80%
Project size requiring large project special use permit (Note 2)
>=30 acres or building area of 400,000 square feet
Minimum depth of landscaping adjacent to street right-of-way line (feet)
10
NOTES:
* Corner lots bordered by two arterial streets shall maintain full front yard setbacks on both arterials.
Note 1: Street setbacks. On streets designated as arterials on the Papillion Comprehensive Plan, required minimum front and street side yard setbacks are the larger of 25 feet from the property line or 100 feet from the center line of the street. On all other streets, required minimum front and street side yard setbacks shall be 15 feet for streets with curb and gutter and 30 feet for streets without curb and gutter.
Note 2: Large project special use permit. The large project special use permit requirement applies to projects of sufficient size or scale to require public comment and individual review by the Planning Commission and City Council. All projects that meet or exceed the large project special use permit size threshold shall require approval of a special use permit, following the procedures set forth in § 205-302 of this chapter, unless they are located within and included within the development plans of an MU or PUD District.