Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Horsham, PA
Montgomery County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
The applicant shall agree in writing to construct streets and other improvements from the lot or lots to be sold or built upon to an existing improved street, subject to the provisions of § 198-3, Application of regulations, herein. The work shall be performed in strict accordance with approved plans and the Township standards and specifications, or the applicable provisions of Pennsylvania Department of Transportation Publication 408, latest revision, or any subsequent number or section thereof. No plat shall be finally approved until the developer has completed all of the necessary and appropriate improvements as required as a condition for final approval of a plat; or until such time as the applicant has provided for the deposit with the Township of a security acceptable to the governing body in an amount sufficient to cover the costs of any improvement which may be required.
All water, gas, electric and other pipes and conduits, and all service connections or laterals shall be laid to the full width of the ultimate right-of-way, where the need therefor can be reasonably anticipated, before streets are paved. The arrangements for said service connections or laterals shall be the responsibility of the subdivider, developer or builder.
The Township Engineer shall be notified a minimum of 48 hours in advance of the commencement of any construction operation, in order that provision may be made for inspection by the Township.