Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Town of Binghamton, NY
Broome County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: C
# A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Charges
ยงย 1-4— Enactments saved from repeal; matters not affected. ยงย 35-5— Designation and duty of Clerk to provide notice. 88-4{4}— OWNER ยงย 88-4.1— Licensing of dogs. ยงย 88-10— Fees. 90-4{4}— BATTERY(IES) ยงย 97-3— Permit requirements. ยงย 102-6— Records and reports. ยงย 102-8— Fees. ยงย 106-4— Emergency cases. 108-4{2}— CCA ADMINISTRATOR 108-4{3}— COMMUNITY CHOICE AGGREGATION (CCA)/CCA PROGRAM ยงย 119-28— Fees and expenses. ยงย 119-31— Type I actions. ยงย 122-6— Barbed wire and electrically charged fencing. ยงย 125-14— Fire inspection fees. ยงย 128-1— Permit fee. ยงย 165-9— Accumulations restricted. ยงย 165-11— Failure to remove; procedure for trial; penalties for offenses. ยงย 166-1— Purpose and intent; definitions; registration requirements; fees; maintenance; exemptions; inspections; annual reports; penalties for offenses. ยงย 173-8— Trenching and excavating. ยงย 173-16— Connection of properties outside existing districts. ยงย 173-19— Industrial waste discharges. 174-30{14}— FLOW-THROUGH COSTS ยงย 184-8— Vehicle plates; fee. ยงย 188-13— Enforcement; penalties for offenses. ยงย 190-5— Restoration of highway. ยงย 190-7— Surety bond, liability insurance and deposit. ยงย 202-6— Special use permit application and other requirements. ยงย 202-26— Indemnification. ยงย 220-5— Penalties for offenses. ยงย 224-6— Permits for restoration. ยงย 224-7— License for open storage. ยงย 231-3— Application for service. ยงย 231-5— Meters. ยงย 231-7— Rates and bills. ยงย 240-51— Fees for permits.
Code Enforcement Officer
88-4{2}— DOG CONTROL OFFICER ยงย 90-5— Battery energy storage system permit and use requirements. ยงย 90-7— Notice of noncompliance. ยงย 90-8— Authority to issue stop-work orders. ยงย 125-12— Inspections. ยงย 148-5— Issuance of license. ยงย 148-6— Supplemental license. ยงย 148-7— License renewal. ยงย 148-8— License fees. ยงย 148-9— Application procedure. ยงย 157-9— Compliance with orders. ยงย 166-1— Purpose and intent; definitions; registration requirements; fees; maintenance; exemptions; inspections; annual reports; penalties for offenses. 166-1B{1}— CODE ENFORCEMENT OFFICER 166-1B{4}— UNOCCUPIED 166-1B{6}— VACANT BUILDING ยงย 188-17— Alternative remedies. ยงย 208-3— License required. ยงย 208-7— Security deposit; return of deposit. ยงย 208-9— Investigation of applications and merchandise. ยงย 208-10— Place of business. ยงย 208-11— Time limit for commencement of business. ยงย 208-12— Right of entry; access to books. ยงย 208-13— Filing of statement of sales and stock; payment of tax. ยงย 220-6— Enforcement. ยงย 220-7— Impoundment and towing of vehicles; costs. ยงย 224-5— Notice and determination. ยงย 224-6— Permits for restoration. ยงย 224-7— License for open storage. ยงย 224-9— Storage by towers; commercial garages and towing commercial garages. ยงย 224-12— Code Enforcement Officer to make rulings. ยงย 240-57.1— Wind energy systems. 240-57.1B{5}— COMPLETION/FULLY COMPLETED ยงย 240-57.2— Solar energy systems and geothermal. 240-57.2C{25}— PROJECT COMPLETION
Construction
ยงย 1-11— Changes in previously adopted legislation; new provisions. Ch 5— Appearance Tickets ยงย 90-3— Applicability. 90-4{9}— ENERGY CODE 90-4{12}— NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL) 90-4{19}— PARTICIPATING PROPERTY ยงย 90-5— Battery energy storage system permit and use requirements. Ch 97— Blasting Ch 102— Building Construction ยงย 102-4— Restrictions on employees. ยงย 102-5— Duties and powers of Building Official. ยงย 102-7— Application for building permit. ยงย 102-8— Fees. ยงย 102-10— Performance of work under building permit. ยงย 102-12— Stop orders. ยงย 102-14— Certificate of occupancy. ยงย 102-15— Inspection prior to issuance of certificate. ยงย 102-18— Tests of material, construction, equipment or assembly. ยงย 102-19— Swimming pool permit requirements for in-ground and aboveground pools of any type. ยงย 102-21— Penalties for offenses. ยงย 102-22— Abatement of violations. Ch 106— Buildings, Dangerous or Unsafe Ch 119— Environmental Quality Review 119-4{1}— ACTION 119-4{9}— MINISTERIAL ACTION ยงย 119-5— Actions not requiring environmental review. ยงย 119-31— Type I actions. ยงย 119-32— Type II actions. ยงย 122-4— Height. ยงย 122-5— Fences near intersections. ยงย 122-9— Swimming pool fences. Ch 125— Fire Prevention Ch 132— Flood Damage Prevention ยงย 132-2— Purpose. 132-4B{6}— BREAKAWAY WALL 132-4B{19}— FLOOR 132-4B{21}— HIGHEST ADJACENT GRADE 132-4B{27}— NEW CONSTRUCTION 132-4B{32}— START OF CONSTRUCTION 132-4B{35}— VARIANCE ยงย 132-8— Penalties for offenses. ยงย 132-11— Establishment of development permit. ยงย 132-12— Duties and responsibilities of local administrator. ยงย 132-13— General standards. ยงย 132-14— Specific standards. ยงย 132-15— Floodways. ยงย 132-17— Conditions for variances. Ch 148— Mobile Homes 148-3{1}— MOBILE HOME ยงย 148-31— Exceptions. ยงย 165-10— Deposits or obstructions on highways. ยงย 171-1— Legislative findings and purpose. 171-3{1}— BASELINE TRAFFIC 171-3{2}— CONCENTRATED TRAFFIC 171-3{3}— CONSTRUCTION ACTIVITY ยงย 171-4— Applicability. ยงย 171-5— Determination of whether proposed use constitutes concentrated traffic. ยงย 171-6— Requirements for concentrated traffic. ยงย 173-3— Compulsory connection to sewer collecting systems. ยงย 173-6— Lateral size and material specifications. ยงย 173-7— Location and laying of laterals. ยงย 173-8— Trenching and excavating. ยงย 173-11— Connection at sewer. ยงย 173-13— Laterals between property line and trunk line. 174-4{17}— NEW OR MODIFIED SEWER CONNECTION ยงย 174-5— Program requirements. 174-10{9}— DEVELOPER 174-10{22}— NEW OR MODIFIED SEWER CONNECTION 174-30{3}— AS-BUILT/RECORD DRAWING 174-30{6}— CAPACITY, MANAGEMENT, OPERATION, AND MAINTENANCE (CMOM) PROGRAM ยงย 174-31— Program requirements. ยงย 179-4— Location. 188-2{3}— CONSTRUCTION ACTIVITY 188-2{10}— INDUSTRIAL ACTIVITY ยงย 188-6— Discharge prohibitions. ยงย 188-10— Industrial or construction activity discharges. ยงย 190-8— Exceptions to requirements. Ch 195— Subdivision of Land ยงย 195-3— Intent; conflicting provisions; purpose. ยงย 195-6— Final plat. ยงย 195-7— Required improvements and performance bond. ยงย 195-21— Final plat. ยงย 202-1— Purpose and legislative intent. 202-4{20}— SPECIAL USE PERMIT ยงย 202-5— Policy and goals for special use permits. ยงย 202-6— Special use permit application and other requirements. ยงย 202-7— Location of wireless telecommunications facilities. ยงย 202-8— Shared use of wireless telecommunications facilities and other structures. ยงย 202-9— Height of telecommunications tower(s). ยงย 202-11— Security of wireless telecommunications facilities. ยงย 202-16— Exceptions from special use permit. ยงย 202-19— Recertification of special use permit. ยงย 202-23— Reservation of authority to inspect wireless telecommunications facilities. ยงย 202-25— Liability insurance. ยงย 202-26— Indemnification. ยงย 202-29— Removal of wireless telecommunications facilities. 224-3A{2}— OPEN STORAGE ยงย 231-1— Powers and duties of Town Board. ยงย 231-2— Purpose; compliance by consumers. Ch 240— Zoning 240-6{12}— BUILDING PERMIT 240-6{40}— MODULAR HOUSE 240-6{53}— STRUCTURE ยงย 240-10— Reconstruction of buildings containing nonconforming uses. ยงย 240-13— Purpose. ยงย 240-15— Preliminary development plan. ยงย 240-16— Development plan. 240-36{2}— SIGN ยงย 240-37— Signs permitted in R1, R2 or RR District. ยงย 240-38— Sign regulations in R1, R2 or RR District. ยงย 240-39— Signs permitted in C or I District. ยงย 240-40— Sign regulations in C or I District. ยงย 240-46— Wind pressure requirements. ยงย 240-47— Signs in violation. ยงย 240-49— Sign permit required; contents of application. ยงย 240-57.1— Wind energy systems. 240-57.1B{5}— COMPLETION/FULLY COMPLETED 240-57.1B{13}— SPECIAL USE PERMIT ยงย 240-57.2— Solar energy systems and geothermal. 240-57.2C{5}— CERTIFICATE OF COMPLIANCE 240-57.2C{19}— MINIMUM LOT SIZE 240-57.2C{25}— PROJECT COMPLETION 240-57.2C{27}— QUALIFIED SOLAR INSTALLER ยงย 240-60— Submission of site plan. ยงย 240-64— Zoning Board of Appeals. ยงย 240-65— Abatement of violations. ยงย DL-1— Disposition of legislation.
Costs and expenses
ยงย 12-7— Compensation and reimbursement for expenses. ยงย 17-2— Provisions for defense by Town. ยงย 52-2— Initial review. ยงย 61-6— Compensation; reimbursement for expenses. ยงย 76-6— Compensation; reimbursement for expenses. ยงย 88-10— Fees. ยงย 90-5— Battery energy storage system permit and use requirements. ยงย 102-10— Performance of work under building permit. ยงย 106-3— Notice to repair; filing of copy; hearing. ยงย 106-4— Emergency cases. ยงย 106-6— Assessment of costs and expenses. ยงย 106-7— Recovery of costs and expenses. ยงย 108-2— Findings. ยงย 108-5— Establishing community choice aggregation. ยงย 119-28— Fees and expenses. ยงย 119-32— Type II actions. ยงย 122-7— Placement. ยงย 122-10— Maintenance; enforcement. ยงย 122-11— Penalties for offenses. ยงย 132-3— Objectives. 132-4B{34}— SUBSTANTIAL IMPROVEMENT ยงย 132-16— Board of Appeals. ยงย 132-17— Conditions for variances. ยงย 148-26— Existing mobile homes. ยงย 161-11— License fees. ยงย 165-11— Failure to remove; procedure for trial; penalties for offenses. ยงย 166-1— Purpose and intent; definitions; registration requirements; fees; maintenance; exemptions; inspections; annual reports; penalties for offenses. ยงย 171-1— Legislative findings and purpose. ยงย 171-6— Requirements for concentrated traffic. ยงย 173-8— Trenching and excavating. ยงย 173-13— Laterals between property line and trunk line. ยงย 173-14— Future extensions. ยงย 173-16— Connection of properties outside existing districts. ยงย 173-19— Industrial waste discharges. ยงย 174-12— Exemptions from I/I remediation projects. ยงย 174-20— Withdrawing flow credits for new or modified sewer connection. 174-30{14}— FLOW-THROUGH COSTS ยงย 174-31— Program requirements. ยงย 184-5— Application for permit. ยงย 184-11— Schedule of costs. ยงย 188-8— Requirement to prevent, control, and reduce stormwater pollutants by use of best management practices. ยงย 188-11— Access and monitoring of discharges. ยงย 188-13— Enforcement; penalties for offenses. ยงย 188-15— Corrective measures after appeal. ยงย 188-18— Violations deemed public nuisance. ยงย 190-5— Restoration of highway. ยงย 190-7— Surety bond, liability insurance and deposit. ยงย 195-7— Required improvements and performance bond. ยงย 195-10— Public streets, parks and playground areas not implicitly accepted. ยงย 202-6— Special use permit application and other requirements. ยงย 202-15— Retention of expert assistance and reimbursement by applicant. ยงย 202-16— Exceptions from special use permit. ยงย 202-19— Recertification of special use permit. ยงย 202-22— Performance security. ยงย 202-23— Reservation of authority to inspect wireless telecommunications facilities. ยงย 202-26— Indemnification. ยงย 202-29— Removal of wireless telecommunications facilities. ยงย 202-30— Relief. ยงย 220-7— Impoundment and towing of vehicles; costs. ยงย 224-6— Permits for restoration. ยงย 224-10— Amnesty period. ยงย 224-11— Failure to remove; procedure for trial; penalties for offenses. ยงย 231-1— Powers and duties of Town Board. ยงย 231-4— Service connections. ยงย 231-5— Meters. ยงย 240-8— Continuation of nonconforming uses. ยงย 240-57.1— Wind energy systems. ยงย 240-57.2— Solar energy systems and geothermal.