home
Home
code
Code
Code
Index
law
Laws (11)
New Laws (11)
help_center
Help
Help
About Us
ecode
ecode
search
warning
Login
Township of Grosse Ile, MI
chevron_right
2021-08-09
info
chevron_right
Index: I
Filter By Letter
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
I
add
Illicit connections
ยงย 133-1 — Purpose; objectives.
133-2{6} — ILLICIT CONNECTIONS
ยงย 133-7 — Discharge prohibitions.
ยงย 133-12 — Violations, enforcement and penalties.
add
Impoundment
ยงย 16-40 — Seizure and destruction of gambling devices.
ยงย 20-8 — Authority to impound.
ยงย 20-9 — Redemption of impounded animals; fee.
ยงย 20-10 — Disposition of unclaimed animals.
ยงย 20-17 — Interference with Dog Warden.
ยงย 153-32 — Impoundment of vessel; storage.
ยงย 153-51 — Personal watercraft and associated equipment.
ยงย 157-21 — Stopping vehicles for weighing.
233-8{15} — SURFACE WATER
ยงย 278-4 — Towing of vehicles.
add
Improvements
ยงย 1-28 — Ordinances saved from repeal.
ยงย 67-2 — Commission purchases.
ยงย 67-6 — Authority.
ยงย 67-7 — Duties.
ยงย 67-42 — Duties and authority.
ยงย 67-52 — General duties.
ยงย 67-56 — Authority to collaborate with other governmental bodies.
ยงย 67-63 — Duties.
ยงย 67-66 — Duties.
ยงย 70-1 — Intent.
70-2{4} — CAPITAL IMPROVEMENT PLAN (CIP)
70-2{18} — TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
70-2{20} — UNDEVELOPED AREA
ยงย 70-3 — Applicability.
ยงย 70-4 — Transportation impact analysis.
ยงย 70-5 — Community impact statement.
ยงย 70-6 — Fiscal impact analysis.
ยงย 70-8 — Review and approval procedures.
ยงย 71-4 — Requirements for condominium approval.
ยงย 84-3 — Powers of Board.
ยงย 84-5 — Development plans.
98-2{2} — DEVELOPMENT
98-2{3} — ENVIRONMENT
ยงย 98-9 — Mitigation of environmental and natural features impacts.
ยงย 98-12 — Required approvals, compliance, enforcement and appeals.
116-2{11} — SUBSTANTIAL IMPROVEMENT
ยงย 116-8 — General standards.
ยงย 116-9 — Construction standards.
ยงย 124-2 — Permit requirements; exception.
ยงย 124-4 — Grade plan.
133-2{13} — PREMISES
ยงย 150-1 — Intent.
153-1{2} — ASSOCIATED EQUIPMENT
153-51A{1} — ASSOCIATED EQUIPMENT
ยงย 157-16 — Security of load; spilling on highway prohibited.
ยงย 197-3 — Duties of Board of Public Works.
205-3{13} — ROAD
ยงย 205-4 — Dividing, partitioning or assembling land and road frontage.
ยงย 205-5 — Building permits and road frontage.
ยงย 205-7 — Maintenance.
ยงย 205-17 — Road standards
ยงย 205-23 — Maintenance.
ยงย 209-9 — Change of rates; water rates.
ยงย 210-9 — User charges.
ยงย 230-2 — Application for limited income determination.
ยงย 230-6 — Necessity of petitions.
ยงย 230-7 — Preparation of maps, plans and estimates.
ยงย 230-8 — Objections to petition, improvement and district.
ยงย 230-9 — Approval of project.
ยงย 230-13 — Payment schedule and issuance of bonds.
ยงย 233-15 — Responsibility for design; considerations.
238-1B{22} — STREET
ยงย 238-4 — Pre-preliminary plats.
ยงย 238-6 — Final plats.
ยงย 238-7 — Design standards.
ยงย 238-8 — Required improvements.
ยงย 238-10 — Additional improvements.
ยงย 238-11 — Performance guarantee.
244-2{4} — HOUSING DEVELOPMENT
258-7{6} — STREET
275-5{8} — DEVELOPMENT
ยงย 275-12 — Activities not requiring Township approval.
ยงย 275-18 — Application review.
ยงย 282-2 — Purposes.
ยงย 282-5 — Review of plats.
285-1.3{25} — BUILDABLE
ยงย 285-3.5 — Area and bulk regulations.
ยงย 285-5.3 — Required conditions.
ยงย 285-9.3 — Nonaeronautical uses.
ยงย 285-13.1 — Intent.
285-13.2B{8} — PARKING LOT LANDSCAPING
ยงย 285-13.3 — Landscaping requirements.
ยงย 285-16.1 — Intent.
ยงย 285-16.3 — Inspection and maintenance of signs.
ยงย 285-17.4 — Waterfront requirements.
ยงย 285-18.6 — Nonconforming buildings and structures.
ยงย 285-18.7 — Nonconforming sites.
ยงย 285-19.21 — Lot splits and consolidations.
ยงย 285-20.5 — Performance guarantee.
ยงย 285-21.2 — Applicability; project types.
ยงย 285-21.5 — Submittal requirements.
ยงย 285-21.6 — Standards for site plan approval.
ยงย 285-21.7 — Conditions to site plan approval.
ยงย 285-23.4 — Appeal procedures.
ยงย 285-23.5 — Standards for variances and appeals.
ยงย 285-24.5 — Community Development Director, Zoning Administrator and other administrative officials.
ยงย 285-25.2 — Application for amendment.
ยงย 285-25.5 — Zoning agreements.
ยงย A293-7 — System construction, maintenance and procedures.
add
Indemnification
ยงย A293-6 — Liability and indemnification.
add
Industrial districts
ยงย 285-2.1 — Creation of districts; Zoning Map; interpretation of district boundaries.
Ch 285 Art 9 — A-1 Airport and Light Industrial District
ยงย 285-9.1 — Intent.
ยงย 285-9.2 — Aeronautical uses.
ยงย 285-9.3 — Nonaeronautical uses.
ยงย 285-9.4 — Required conditions.
ยงย 285-9.5 — Area and bulk regulations.
ยงย 285-12.2 — Loading space requirements.
ยงย 285-13.3 — Landscaping requirements.
ยงย 285-16.8 — Commercial, industrial and airport district signs.
ยงย 285-19.13 — Commercial communication towers.
ยงย 285-19.23 — Alternative energy systems.
ยงย DL-1 — Disposition of legislation.
add
Industrial wastes
146-2{11} — REFUSE
209-1A{15} — SEWAGE
209-1A{16} — SEWAGE DISPOSAL SYSTEM
ยงย 209-5 — Rates for various users of commercial and industrial buildings.
210-1A{17} — INDUSTRIAL WASTES
210-1A{29} — SANITARY SEWAGE
210-1A{32} — SEWAGE DISPOSAL SYSTEM
210-1A{37} — STORM SEWER or STORM DRAIN
ยงย 210-2 — Use of public sewers required.
ยงย 210-4 — Discharge to public sanitary sewer.
add
Insects
ยงย 226-13 — Preparation and storage.
add
Inspections
ยงย 1-1 — Definitions and rules of construction.
ยงย 1-21 — Publication; filing.
ยงย 1-34 — When effective; copies available.
ยงย 12-10 — Inspection of article.
ยงย 16-12 — Inspections.
ยงย 16-17 — Approval by Township officials.
ยงย 16-30 — License required.
ยงย 16-32 — Owner/operator license fee.
ยงย 16-34 — Identification of device.
ยงย 16-35 — Inspection.
ยงย 16-36 — Conditions for issuance of owner's/operator's license.
ยงย 16-37 — Additional licensing requirements.
ยงย 16-41 — Periodic police inspection.
ยงย 40-1 — Adoption of Property Maintenance Code.
ยงย 40-2 — Adoption of One- and Two-Family Dwelling Code.
ยงย 40-8 — References in codes.
ยงย 40-14 — References in codes.
59-1{1} — CERTIFICATE OF OCCUPANCY
ยงย 59-3 — Issuance of certificate of occupancy.
ยงย 59-4 — Disclaimer of liability by Township.
ยงย 59-5 — Application and fee.
ยงย 67-1 — General provisions.
ยงย 70-8 — Review and approval procedures.
ยงย 98-4 — Evaluation procedure.
ยงย 110-5 — Publication available for use and inspection.
ยงย 110-9 — Publication available for use and inspection.
ยงย 110-13 — Publication available for use and inspection.
ยงย 124-7 — Grade approval.
ยงย 133-1 — Purpose; objectives.
ยงย 133-9 — Compliance monitoring.
153-1{16} — MARINE SAFETY PROGRAM
153-1{33} — UNIFORM INSPECTION DECAL
ยงย 153-5 — Certificate of number; temporary permit; vessels for lease or rent.
ยงย 153-9 — Casualties involving vessels.
ยงย 153-11 — Wearing of personal flotation device by child required; exception for charter boats.
ยงย 153-27 — Authority of peace officers; inspections.
ยงย 153-36 — Maximum capacity tags.
ยงย 153-37 — Weight capacity.
ยงย 153-43 — Equipment.
ยงย 157-7 — Violations; authority to stop and inspect vehicles; driver audit; exception.
ยงย 157-11 — General size, weight and load requirements.
ยงย 157-19 — Transportation of flammable liquids.
ยงย 157-22 — Special permits for nonconforming vehicles and loads.
ยงย 185-8 — Public disclosure.
ยงย 205-19 — Application and approval procedures.
ยงย 205-23 — Maintenance.
ยงย 209-10 — Books and records.
ยงย 210-3 — Installation and connection of sewers; permits required.
ยงย 210-4 — Discharge to public sanitary sewer.
ยงย 210-6 — Power and authority of inspectors.
ยงย 220-3 — Inspection.
ยงย 233-2 — Purpose.
ยงย 233-16 — Adoption of fee system.
ยงย 233-19 — Authority.
ยงย 233-20 — Duties.
ยงย 238-9 — Preparation of plans and inspection of work.
ยงย 238-15 — Schedule of fees.
ยงย 241-8 — Inspection.
ยงย 241-10 — Right of entry.
ยงย 258-3 — Inspection.
ยงย 258-4 — Fees.
ยงย 258-16 — Application procedure.
ยงย 258-19 — Inspection of work; suspension or revocation of permit; filing of plans.
ยงย 261-3 — Notice to be published.
ยงย 261-4 — Code amendments.
ยงย 261-10 — Inspection of code.
ยงย 268-15 — Rules applying to water supply and cross-connections.
ยงย 268-16 — Inspections.
ยงย 268-17 — Right of entry.
ยงย 275-14 — Map preparation.
ยงย 275-15 — Responsibility for site surveys.
ยงย 275-18 — Application review.
ยงย 275-22 — Fees.
ยงย 275-26 — Display of use approval certification; inspections.
ยงย 275-31 — Stop-work order.
ยงย 282-9 — Property inspection.
ยงย 285-3.4 — Required conditions.
ยงย 285-3.5 — Area and bulk regulations.
ยงย 285-5.3 — Required conditions.
ยงย 285-12.1 — Off-street parking.
ยงย 285-13.4 — Plant material requirements.
ยงย 285-16.3 — Inspection and maintenance of signs.
ยงย 285-17.4 — Waterfront requirements.
ยงย 285-19.23 — Alternative energy systems.
ยงย 285-20.3 — Permits and certificates.
ยงย 285-20.6 — Violations and penalties.
ยงย 285-21.2 — Applicability; project types.
ยงย 285-22.2 — Submittal requirements and review procedures.
ยงย 285-24.5 — Community Development Director, Zoning Administrator and other administrative officials.
ยงย A292-8 — Limitations.
ยงย A293-17 — Township rights.
ยงย A293-20 — Records and reports.
ยงย A293-22 — Complaint procedures.
add
Insurance
ยงย 67-39 — Expenditures.
98-2{4} — ENVIRONMENTAL ASSESSMENT
ยงย 116-4 — Adoption of maps.
ยงย 116-10 — Variances.
ยงย 118-3 — Designation of regulated flood prone hazard areas.
ยงย 153-32 — Impoundment of vessel; storage.
ยงย 157-15 — Transportation of mobile homes.
ยงย 157-22 — Special permits for nonconforming vehicles and loads.
Ch 171 Art I — Medical and Dental Insurance
ยงย 171-1 — Name of plan; participation.
ยงย 185-27 — Application for permit; contents.
ยงย 205-1 — Purpose.
ยงย 210-10 — Accounting.
ยงย 238-11 — Performance guarantee.
ยงย 238-12 — Evidence of title.
ยงย 258-15 — General construction requirements.
ยงย 258-16 — Application procedure.
ยงย 261-4 — Code amendments.
ยงย 285-7.2 — Permitted uses.
ยงย 285-17.4 — Waterfront requirements.
ยงย A292-5 — Insurance.
ยงย A293-6 — Liability and indemnification.
ยงย A293-17 — Township rights.
ยงย A293-27 — Employment requirement.
add
Intoxicate
ยงย 12-5 — Purchase, consumption or possession by minors.
ยงย 16-7 — Intoxicated persons.
ยงย 16-42 — Responsibility of licensee.
ยงย 80-4 — Permitting noisy conduct; illegal business.
ยงย 88-2 — Chemical agents.
ยงย 153-28 — Penalty.
ยงย 153-30 — Operation of vessel by person under the influence of intoxicating liquor or a controlled substance.
161-2{3} — OPERATING A VEHICLE WHILE UNDER THE INFLUENCE OF AN ALCOHOLIC BEVERAGE OR CONTROLLED SUBSTANCE
ยงย 161-5 — Operation by minor prohibited.
ยงย 184-6 — Conduct of park users.
ยงย 261-4 — Code amendments.
add
Intoxicated persons
ยงย 12-5 — Purchase, consumption or possession by minors.
ยงย 16-7 — Intoxicated persons.
ยงย 16-42 — Responsibility of licensee.
add
Intoxicating beverages
ยงย 12-5 — Purchase, consumption or possession by minors.
ยงย 16-7 — Intoxicated persons.
ยงย 16-42 — Responsibility of licensee.
ยงย 80-4 — Permitting noisy conduct; illegal business.
ยงย 88-2 — Chemical agents.
ยงย 153-28 — Penalty.
ยงย 153-30 — Operation of vessel by person under the influence of intoxicating liquor or a controlled substance.
161-2{3} — OPERATING A VEHICLE WHILE UNDER THE INFLUENCE OF AN ALCOHOLIC BEVERAGE OR CONTROLLED SUBSTANCE
ยงย 161-5 — Operation by minor prohibited.
ยงย 184-6 — Conduct of park users.
ยงย 261-4 — Code amendments.
add
Intoxication
ยงย 12-5 — Purchase, consumption or possession by minors.
ยงย 16-7 — Intoxicated persons.
ยงย 16-42 — Responsibility of licensee.
ยงย 80-4 — Permitting noisy conduct; illegal business.
ยงย 88-2 — Chemical agents.
ยงย 153-28 — Penalty.
ยงย 153-30 — Operation of vessel by person under the influence of intoxicating liquor or a controlled substance.
161-2{3} — OPERATING A VEHICLE WHILE UNDER THE INFLUENCE OF AN ALCOHOLIC BEVERAGE OR CONTROLLED SUBSTANCE
ยงย 161-5 — Operation by minor prohibited.
ยงย 184-6 — Conduct of park users.
ยงย 261-4 — Code amendments.
add
Investigations
ยงย 1-7 — Citation issuance and service.
ยงย 1-11 — Designation of authorized Township officials.
ยงย 16-17 — Approval by Township officials.
ยงย 16-24 — Number of machines.
ยงย 133-7 — Discharge prohibitions.
ยงย 133-12 — Violations, enforcement and penalties.
ยงย 135-1 — Reimbursement may be sought; financial status of inmate.
ยงย 135-4 — Investigation of reports.
ยงย 153-30 — Operation of vessel by person under the influence of intoxicating liquor or a controlled substance.
ยงย 157-25 — Stopping vehicles for potential violations; temporary detention; arrests.
161-2{2} — EXPENSE OF AN EMERGENCY RESPONSE
ยงย 185-14 — Investigation.
ยงย 233-19 — Authority.
ยงย 233-22 — Investigations; informal conferences; voluntary agreements.
ยงย 233-24 — Consent agreement.
ยงย 233-25 — Administrative compliance orders.
ยงย 275-15 — Responsibility for site surveys.
ยงย 282-9 — Property inspection.
ยงย 285-22.2 — Submittal requirements and review procedures.
ยงย 285-24.5 — Community Development Director, Zoning Administrator and other administrative officials.
ยงย A293-22 — Complaint procedures.