Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Town of Haddam, CT
Middlesex County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: E
A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Erosion and sediment control
ยงย 52-8— Land use applications. ยงย 52-9— Term defined. ยงย 85-4— Authority of Selectmen to adopt specifications. Ch 270— ZONING 270-7{92}— SOIL EROSION AND SEDIMENT CONTROL PLAN 270-51{4}— EROSION AND SEDIMENTATION CONTROL PLAN ยงย 270-98— Soil erosion and sediment control plan. ยงย 270-99— Cash performance bond. ยงย 270-102— Waiver or modification of requirements; alteration or modification of existing structures or uses. ยงย 270-133— Additional required information. Ch 270 Art XXX— Erosion and Sediment Control Plans ยงย 270-169— Plans required; exemptions. ยงย 270-170— Eligibility for certification. ยงย 270-171— Plan contents. ยงย 270-172— Minimum acceptable standards. ยงย 270-173— Review and certification of plans. ยงย 270-174— Conditions. ยงย 270-176— Enforcement. ยงย 270-177— Stop-work orders. ยงย 270-181— Covered costs. Ch 301— INLAND WETLANDS AND WATERCOURSES ยงย 301-6— Permit required for regulated activities. ยงย 301-7— Application requirements. ยงย 301-11— Decision process and permit. ยงย 302-10— Formal application requirements. ยงย 302-11— Formal consideration. ยงย 302-14— Record subdivision map. ยงย 302-17— Erosion and sedimentation control plan. ยงย 302-22— Building lots. ยงย 302-48— Alternative storm drainage design. ยงย 302-52— Plans. ยงย 304-3— Activities permitted without registration. ยงย 304-5— Commercial cutting outside Gateway Conservation Zone. ยงย 304-6— Granting of permit.