Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Hadley, MA
Hampshire County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: S
# A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Safety standards
§ 17-3— Purpose. § 24-6— Rabies control. § 104-7— Plastic reduction. § 162-3— Unlawful noise prohibited. § 162-7— Purpose. § 162-18— Multiple false alarms prohibited. § 174-5— Duties and responsibilities of Chief of Police. § 195-6— Purpose and objectives. 195-7{19}— TOXIC OR HAZARDOUS MATERIAL OR WASTE § 195-12— Prohibited activities; exemptions. § 195-13— Suspension of storm drain system access. § 195-17— Purpose. 195-18{1}— ADVERSE IMPACT § 218-10— Work performed by Town. § 218-14— Purpose. § 218-21— Line of sight restrictions. § 230-1— License required to remove tree. § 255-2— Purpose. § ZB-1.1— Purpose. § ZB-2.1— Types of districts. § ZB-5.3— Floodplain restrictions. § ZB-7.1— Purpose. § ZB-7.4— General regulations. § ZB-8.1— Purpose. § ZB-8.7— Site plan review criteria. § ZB-8.8— Commercial development and performance standards. § ZB-12.1— Purpose of district. § ZB-12.6— Restricted uses in Aquifer Protection District. § ZB-13.1— Statement of purpose. § ZB-13.6— Use regulations and variances. § ZB-14.1— Purpose. § ZB-17.10— Design standards. § ZB-18.1— Purpose. § ZB-20.1— Purpose. § ZB-21.1— Purpose. § ZB-23.5— Criteria for approval. § ZB-27.8— Procedures. § ZB-28.1— Purpose. § ZB-28.4— General Requirements for all solar energy systems. § ZB-28.7— Solar energy system special permit requirements. § ZB-29.1— Purpose. § ZB-29.4— Application requirements. § ZB-29.5— Findings. § ZB-30.1— Purposes. § ZB-30.6— Findings. § 420-7— Police to submit annual traffic safety report. § 420-8— Exemptions. § 420-9— Traffic signs and signals. § 420-19— Driving within marked lanes. § 420-27— Starting, stopping, turning or backing. 425-3{13}— CROSS-CONNECTION § 425-10— Liability. § 425-15— Meters. § 425-16— Service pipes and fixtures.
Signs
§ 24-5— Impoundment; kenneling; release; disposition of animals. § 86-2— Payment of orders. § 87-3— Board of Trustees. § 87-7— Acts of Trustees. § 87-13— Amendments. § 87-14— Record to be conclusive; certificate as to facts. 104-6B{10}— STRUCTURE § 218-4— Posting signs and notices; painting or marking stones, trees, poles or other structures. § 218-10— Work performed by Town. § 218-12— Commercial establishments. § 247-6— Identification, location and size of handicapped parking spaces. § ZB-1.2— Definitions. § ZB-4.3— Other intensity regulations. § ZB-5.2— Accessory buildings. Ch ZB § VII— Signs § ZB-7.1— Purpose. § ZB-7.3— Administration and enforcement. § ZB-7.4— General regulations. § ZB-7.5— Signs in Residence and Agricultural-Residence Districts. § ZB-7.6— Signs in Limited Business, Local Business, Business and Industrial Districts. § ZB-7.7— Signs in Floodplain District. § ZB-7.8— Temporary signs. § ZB-7.9— Nonconforming signs. § ZB-7.10— Signs on Public Property. § ZB-8.5— Required site plan contents. § ZB-20.2— Types of home occupations. § ZB-22.4— Use restrictions. § ZB-23.5— Criteria for approval. § ZB-27.8— Procedures. § ZB-28.6— Solar energy system administrative review requirements. § ZB-28.7— Solar energy system special permit requirements. § ZB-29.4— Application requirements. § ZB-30.5— Application requirements. 420-1{2}— CROSSWALK 420-1{11}— OFFICIAL TRAFFIC SIGNS 420-1{12}— PARKING Ch 420 Art III— Traffic Signs, Signals, Markings and Zones § 420-9— Traffic signs and signals. § 420-10— Display of unauthorized signs, signals and markings prohibited. § 420-11— Interference with signs, signals and markings prohibited. § 420-13— Obedience to traffic signs and signals. § 420-21— Obedience to isolated stop signs. § 420-30— Keep to the right of roadway divisions. § 420-33— Repealer. § 425-4— Application for water service. § 425-17— Requirements and specifications for laying water mains. § DL-1— Disposition of legislation.
Site plans
§ 195-19— Applicability. § ZB-2.1— Types of districts. § ZB-7.3— Administration and enforcement. Ch ZB § VIII— Commercial Site Plan Approval § ZB-8.2— Projects requiring site plan approval. § ZB-8.3— Exemption from site plan approval. § ZB-8.4— Applications for site plan approval. § ZB-8.5— Required site plan contents. § ZB-8.6— Procedures for site plan review. § ZB-8.7— Site plan review criteria. § ZB-8.8— Commercial development and performance standards. § ZB-12.7— Drainage. § ZB-12.8— Uses by special permit. § ZB-14.4— Submittal requirements. § ZB-14.5— Use restrictions — wireless communications towers. § ZB-14.6— Use restrictions — wireless communications facility. § ZB-17.6— Receiving District regulations. § ZB-17.8— Special permit process for transfer of development rights. § ZB-20.2— Types of home occupations. § ZB-22.3— Special permit required. § ZB-23.4— Application procedures and submittal requirements. § ZB-26.2— Use restrictions. § ZB-27.1— Purpose. § ZB-27.5— Standards. § ZB-27.8— Procedures. § ZB-28.5— Solar energy system permits. § ZB-28.6— Solar energy system administrative review requirements. § ZB-28.7— Solar energy system special permit requirements. § ZB-28.8— Commercial site plan approval. § ZB-29.3— Additional requirements/conditions. § ZB-29.4— Application requirements. § ZB-29.5— Findings. § ZB-30.4— Additional requirements/conditions. § ZB-30.5— Application requirements. § ZB-30.6— Findings.
Special permits
§ 195-19— Applicability. § ZB-1.2— Definitions. § ZB-3.1— Table of Use Regulations. § ZB-4.2— Table of dimensional and density regulations. § ZB-4.3— Other intensity regulations. § ZB-5.1— Nonconforming uses. § ZB-5.7— Vehicular egress/access to a lot and common driveways. § ZB-5.8— New residential construction above 350 feet elevation. § ZB-6.1— Enforcement. § ZB-6.2— Board of Appeals. § ZB-6.5— Special permits. § ZB-7.3— Administration and enforcement. § ZB-7.8— Temporary signs. § ZB-8.2— Projects requiring site plan approval. § ZB-8.6— Procedures for site plan review. § ZB-8.8— Commercial development and performance standards. § ZB-8.9— Enforcement. § ZB-9.1— Removal. § ZB-9.2— Application. § ZB-9.4— No permit required. § ZB-12.4— Establishment of district. § ZB-12.8— Uses by special permit. § ZB-12.9— Nonconforming uses. § ZB-13.6— Use regulations and variances. § ZB-14.5— Use restrictions — wireless communications towers. § ZB-14.6— Use restrictions — wireless communications facility. § ZB-17.4— Transfer of development rights. § ZB-17.5— Eligibility. § ZB-17.6— Receiving District regulations. § ZB-17.8— Special permit process for transfer of development rights. § ZB-17.9— Dimensional and density regulations. § ZB-17.10— Design standards. § ZB-17.11— Special permit criteria. § ZB-17.14— Alternate method for TDR transactions. § ZB-17.16— Relationship to Rate of Development Bylaw. § ZB-20.2— Types of home occupations. § ZB-22.3— Special permit required. § ZB-22.4— Use restrictions. § ZB-22.5— Renewal and nonuse. § ZB-23.3— Applicability. § ZB-23.4— Application procedures and submittal requirements. § ZB-23.5— Criteria for approval. § ZB-25.4— Mandatory provision of affordable units. § ZB-26.2— Use restrictions. § ZB-27.3— Applicability. § ZB-27.5— Standards. § ZB-27.8— Procedures. § ZB-27.9— Planning Board action. § ZB-27.10— Special permit conditions. § ZB-27.11— Rules, regulations and fees. § ZB-27.12— Construction. § ZB-28.5— Solar energy system permits. § ZB-28.6— Solar energy system administrative review requirements. § ZB-28.7— Solar energy system special permit requirements. § ZB-29.3— Additional requirements/conditions. § ZB-29.4— Application requirements. § ZB-29.5— Findings. § ZB-30.3— Applicability. § ZB-30.4— Additional requirements/conditions. § ZB-30.5— Application requirements. § 425-17— Requirements and specifications for laying water mains.