home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
pubdocs
Public Documents
Public Documents
Resolutions (8)
help_center
Help
Help
About Us
ecode
ecode
search
warning
Login
Township of Hardwick, NJ
chevron_right
2022-12-07
info
chevron_right
Index: S
Filter By Letter
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
S
add
Safety standards
ยงย 2-4 — RULES FOR PURCHASING ORDERS BILLING AND PAYMENT.
ยงย 2-24.1 — Findings.
ยงย 4-1.10 — Revocation and Suspension.
ยงย 4-2.4 — Report from the Township Clerk.
ยงย 4-3.4 — Investigation of Applicant; Approval or Rejection by Township Committee.
ยงย 4-3.5 — Inspections; Township Committee May Discontinue Use.
4-7.1{3} — SPECIAL EVENT
ยงย 9-1 — PREAMBLE.
ยงย 11-1 — PREAMBLE.
ยงย 12-1.1 — Preamble.
ยงย 12-1.5 — Factors to be Considered in Granting Approval.
ยงย 12-2.1 — Preamble.
ยงย 12-2.7 — Township Engineer Review; Violations.
ยงย 13-2 — STATUTORY AUTHORITY; PURPOSE.
13-6{125} — PUBLIC UTILITY
ยงย 13-7.1 — Purpose.
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-37.1 — General Standards.
ยงย 13-84.7 — Geologic Investigations.
ยงย 13-86.9 — Effect of Preliminary Approval of Major Subdivision and Site Plans.
ยงย 13-100 — ADMINISTRATION.
ยงย 13-106.3A — Conditional Use; Conditions of Approval.
ยงย 13-106.8 — Site Plan Submission and Approval Requirements.
13-108.1{17} — DEFICIENT HOUSING UNIT
ยงย 13-109.2 — Code Enforcement.
ยงย 13-110.1 — Scope and Purpose.
ยงย 13-110.4 — Stormwater Management Requirements for Major Development.
ยงย 13-110.8 — Safety Standards for Stormwater Management Basins.
ยงย 13-110.10 — Maintenance and Repair.
ยงย 15-2 — DEFINITIONS.
ยงย 15-5 — NOTICE.
ยงย 15-7 — VIOLATIONS AND PENALTIES.
ยงย 18-1.1 — Statutory Authorization.
ยงย 18-1.2 — Findings of Fact.
ยงย 18-1.3 — Statement of Purpose.
ยงย 18-1.4 — Methods of Reducing Flood Losses.
18-2b{16} — SUBSTANTIAL IMPROVEMENT
ยงย 18-4.3 — Duties and Responsibilities of the Administrator.
ยงย 18-4.4 — Variance Procedure.
ยงย 19-2 — FINDINGS.
ยงย 23-5 — RIGHT TO FARM.
add
Salaries and compensation
ยงย 2-2.7 — Contribution Requirement; Revenue Distribution.
ยงย 2-17 — COMPENSATION.
ยงย 2-20.5 — Salary.
4-7.1{2} — MUNICIPAL COSTS
ยงย 5-1.7 — Animal Control Officer.
ยงย 17-2.2 — Salary.
ยงย DL-1 — DISPOSITION OF LEGISLATION.
add
Sales
ยงย 2-6 — TAX COLLECTOR.
ยงย 2-18.6 — Fees: Tax Sale Certificates; Tax Bill; Tax Searches; Mailings and Returned Checks.
ยงย 3-6.2 — Definitions.
ยงย 4-1.3 — Applications for Licenses.
ยงย 4-2.3 — Requirements.
ยงย 4-4 — GARAGE SALES.
ยงย 4-4.1 — Definitions.
ยงย 4-4.2 — Prohibitions.
ยงย 4-4.3 — License.
ยงย 4-4.4 — Signs.
ยงย 4-4.5 — Exemptions.
4-7.1{1} — FLEA MARKET
5-1.1{4} — KENNEL, COMMERCIAL
5-1.1{5} — KENNEL, NONCOMMERCIAL
5-1.1{8} — PET SHOP
ยงย 6-1 — PURPOSE.
ยงย 6-3.4 — License Fees.
ยงย 6-3.5 — Plenary Retail Consumption License.
ยงย 6-4.1 — Hours of Sale.
ยงย 6-4.2 — Sundays.
ยงย 6-4.3 — New Year's Day.
ยงย 6-4.4 — Sales to Certain Persons.
ยงย 6-4.9 — Illegal Lotteries.
ยงย 6-4.14 — Stamps or Crowns Required on Containers.
ยงย 6-5.1 — Sales to Minors.
ยงย 6-5.2 — Minors to Be Accompanied by Responsible Adults.
ยงย 6-6.4 — Consumption Prohibited; Misrepresentation of Age Prohibited.
ยงย 9-4 — STORAGE OF TRAILERS RESTRICTED.
ยงย 12-1 — REMOVAL OF EARTH FOR SALE.
ยงย 12-1.3 — Permit Required to Remove Earth for Sale.
ยงย 12-1.4 — Requirements; Map Submitted Prior to Consideration of Application.
13-6{8} — AGRICULTURE, COMMERCIAL
13-6{9} — AGRICULTURE, RESIDENTIAL
13-6{57} — FARM STAND
13-6{66} — GARDEN CENTER OR NURSERY
13-6{148} — SIGN, REAL ESTATE
13-6{167} — SUBDIVISION
ยงย 13-11.3 — Home Occupations.
ยงย 13-12.1 — Permitted Uses.
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-37.1 — General Standards.
13-108.1{6} — AFFORDABLE
13-108.1{29} — NONEXEMPT SALE
ยงย 13-108.5 — New Construction.
ยงย 13-108.8 — Control Periods for Restricted Ownership Units and Enforcement Mechanisms.
ยงย 13-108.8 — Price Restrictions for Restricted Ownership Units, Homeowner Association Fees and Resale Prices.
ยงย 13-108.11 — Capital Improvements To Ownership Units.
ยงย 13-108.12 — Control Periods for Restricted Rental Units.
ยงย 13-108.16 — Administrative Agent.
ยงย 13-108.17 — Affirmative Marketing Requirements.
ยงย 13-108.18 — Enforcement of Affordable Housing Regulations.
13-110.2{23} — MAJOR DEVELOPMENT
ยงย 13-110.4 — Stormwater Management Requirements for Major Development.
18-2b{9} — MANUFACTURED HOME PARK OR MANUFACTURED HOME SUBDIVISION
21-1{2} — COMMERCIAL USE
ยงย 23-5 — RIGHT TO FARM.
ยงย 24-3 — Agreement with Owner; Restoration of Property.
ยงย DL-1 — DISPOSITION OF LEGISLATION.
add
Sanitary facilities
ยงย 18-5.2 — Specific Standards.
add
Sanitation
ยงย 5-1.3 — License and Tag Required; Vaccination Required.
ยงย 6-4.12 — Lighting and Sanitation Requirements.
add
Schools
ยงย 3-2.4 — Use of Litter Receptacles.
ยงย 3-8 — ENROLLING A NONRESIDENT STUDENT IN THE NORTH WARREN REGIONAL SCHOOL DISTRICT OR THE BLAIRSTOWN ELEMENTARY SCHOOL PROHIBITED.
ยงย 3-8.1 — Prohibitions.
ยงย 12-2.8 — Truck Traffic Limitations On Permitted Importation.
13-6{131} — SCHOOL
ยงย 13-36.1 — Residential Districts.
ยงย 13-37.2 — Sign Standards in Residential Zones.
ยงย 13-84.5 — Community Impact Statement.
ยงย 21-2 — SOURCE SEPARATION; EXEMPTION FROM SOURCE SEPARATION REQUIREMENTS.
add
Screens and screening
13-6{17} — BUFFER
13-6{58} — FENCE
13-6{76} — LANDSCAPE PLAN
13-6{120} — PORCHES
13-6{150} — SITE PLAN
ยงย 13-10.2 — Houses of Worship.
ยงย 13-11.1 — Family Day Care Homes.
ยงย 13-11.3 — Home Occupations.
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-36.1 — Residential Districts.
ยงย 13-38.3 — Zoning Regulations Pertaining to Residential Scale Solar Energy Systems.
ยงย 13-84.4 — Environmental Impact Statements.
ยงย 13-106.3A — Conditional Use; Conditions of Approval.
ยงย 13-106.8 — Site Plan Submission and Approval Requirements.
ยงย 13-110.7 — Solids and Floatable Materials Control Standards.
ยงย 18-5.1 — General Standards.
21-1{4} — ELECTRONIC WASTE (TO BE INCLUDED IN THOSE INSTANCES WHERE A RECYCLING PROGRAM HAS BEEN, OR WILL BE, ESTABLISHED FOR THESE MATERIALS)
add
Security standards
ยงย 2-10 — CHIEF MUNICIPAL FINANCE OFFICER.
ยงย 2-26.8 — Time Limit for Reimbursement.
ยงย 4-7.3 — Issuance of License.
ยงย 5-1.3 — License and Tag Required; Vaccination Required.
13-6{92} — MAINTENANCE GUARANTEE
13-6{118} — PERFORMANCE GUARANTEE
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-91 — GUARANTEES AND INSPECTIONS.
ยงย 13-108.8 — Control Periods for Restricted Ownership Units and Enforcement Mechanisms.
ยงย 13-108.10 — Limitations on Indebtedness Secured by Ownership Unit; Subordination.
ยงย 13-108.13 — Rent Restrictions for Rental Units; Leases.
ยงย 13-108.16 — Administrative Agent.
ยงย 13-110.1 — Scope and Purpose.
ยงย 13-110.8 — Safety Standards for Stormwater Management Basins.
ยงย 15-2 — DEFINITIONS.
ยงย 15-4 — CREDITOR RESPONSIBILITY FOR VACANT AND ABANDONED PROPERTIES.
ยงย 15-5 — NOTICE.
ยงย 15-7 — VIOLATIONS AND PENALTIES.
add
Seeing eye dogs
ยงย 5-1.4 — Fees.
add
Seizure
5-1.1{10} — POUND
add
Septic systems
ยงย 10-7.5 — Filing Procedure.
ยงย 12-2.6 — Permit exemption.
ยงย 13-84.4 — Environmental Impact Statements.
13-108.1{17} — DEFICIENT HOUSING UNIT
13-108.1{23} — MAJOR SYSTEM
add
Service stations
ยงย 3-2.4 — Use of Litter Receptacles.
add
Setbacks
13-6{3} — ADDITION
13-6{21} — BUILDING ENVELOPE
13-6{90} — LOT WIDTH
13-6{96} — MINIMUM SETBACK LINE
13-6{97} — MINIMUM SETBACK REQUIREMENT
13-6{132} — SETBACK
13-6{178} — YARD, MINIMUM
ยงย 13-10.1 — Agricultural Uses.
ยงย 13-12.1 — Permitted Uses.
ยงย 13-12.2 — Area and Bulk Regulations.
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-32 — ACCESSORY BUILDINGS, STRUCTURES AND USES.
ยงย 13-33.5 — Enlargement of Nonconforming Principal Structure.
ยงย 13-36.1 — Residential Districts.
ยงย 13-37.1 — General Standards.
ยงย 13-38.3 — Zoning Regulations Pertaining to Residential Scale Solar Energy Systems.
ยงย 13-84.2 — Uses Requiring Site Plan Approval.
ยงย 13-88.1 — Sketch Plat and Concept Plan Checklist.
ยงย 13-88.2 — Minor Subdivision Checklist.
ยงย 13-88.3 — Minor Site Plan Checklist.
ยงย 13-88.4 — Preliminary Major Subdivision Checklist.
ยงย 13-88.5 — Final Major Subdivision Checklist.
ยงย 13-88.6 — Preliminary Major Site Plan Checklist.
ยงย 13-88.7 — Final Major Site Plan Checklist.
ยงย 13-88.8 — Variance Application Checklist.
ยงย 13-106.3A — Conditional Use; Conditions of Approval.
ยงย 13-106.5 — Area and Setback Requirements.
ยงย DL-1 — DISPOSITION OF LEGISLATION.
add
Shade trees
13-6{124} — PUBLIC IMPROVEMENTS
ยงย 13-44.4 — Shade Trees.
ยงย 13-91 — GUARANTEES AND INSPECTIONS.
add
Sheds
13-6{22} — BUILDING HEIGHT
13-6{56} — FARM BUILDINGS
13-6{152} — STORAGE SHED
ยงย 13-10.1 — Agricultural Uses.
18-2b{13} — START OF CONSTRUCTION
add
Shopping centers
ยงย 3-2.4 — Use of Litter Receptacles.
add
Shrubs
13-6{66} — GARDEN CENTER OR NURSERY
ยงย 13-10.1 — Agricultural Uses.
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-44.2 — Landscape Plan.
ยงย 13-44.3 — General Standards.
ยงย 14-2 — USES INCLUDED.
ยงย 23-3 — RECOGNITION OF RIGHT.
add
Signs
ยงย 2-1.11 — Fiscal Procedures.
ยงย 2-2.3 — Prosecutor; Administrator; Public Defender; Other Personnel.
ยงย 2-4 — RULES FOR PURCHASING ORDERS BILLING AND PAYMENT.
ยงย 2-9.2 — Duties.
ยงย 2-13 — ROAD DEPARTMENT.
ยงย 2-25.3 — Qualifications.
ยงย 4-3.3 — Information Required for Application.
ยงย 4-4.4 — Signs.
ยงย 6-7 — DISPLAY OF FETAL ALCOHOL SYNDROME (FAS) WARNING SIGNS.
ยงย 7-3.2 — Parking Prohibited during State of Emergency.
ยงย 7-6.1 — Through Streets.
ยงย 7-6.2 — Stop Intersection.
ยงย 7-6.3 — Yield Intersections.
ยงย 7-10.4 — Right Turn on Red Traffic Signal Prohibited.
ยงย 7-11 — SPEED LIMITS.
ยงย 7A-7 — SCHEDULE VII: THROUGH STREETS.
ยงย 7A-8 — SCHEDULE VIII: STOP INTERSECTIONS.
ยงย 10-3 — ADDITIONAL SPECIFICATIONS AND REQUIREMENTS.
ยงย 10-8.3 — Road Signs.
13-6{103} — NONCONFORMING SIGN
13-6{134} — SIGN, TEMPORARY
13-6{135} — SIGN
13-6{136} — SIGN AREA
13-6{137} — SIGN, BILLBOARD
13-6{138} — SIGN, BUSINESS
13-6{139} — SIGN, CONSTRUCTION
13-6{140} — SIGN, DIRECTIONAL
13-6{141} — SIGN, FACE
13-6{142} — SIGN, FLASHING
13-6{143} — SIGN, FREESTANDING
13-6{144} — SIGN, GOVERNMENTAL
13-6{145} — SIGN, GROUND
13-6{146} — SIGN, HOME OCCUPATION
13-6{147} — SIGN, ILLUMINATED
13-6{148} — SIGN, REAL ESTATE
13-6{149} — SIGN, TEMPORARY
13-6{150} — SITE PLAN
13-6{185} — ZONING PERMIT
ยงย 13-11.3 — Home Occupations.
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-37 — SIGNS.
ยงย 13-37.1 — General Standards.
ยงย 13-37.2 — Sign Standards in Residential Zones.
ยงย 13-84.5 — Community Impact Statement.
ยงย 13-85.9 — Filing with the County Recording Officer.
ยงย 13-87.9 — Recording of Final Subdivision Approval.
ยงย 13-87.14 — Distribution of Approved Plat.
ยงย 13-88.3 — Minor Site Plan Checklist.
ยงย 13-88.4 — Preliminary Major Subdivision Checklist.
ยงย 13-88.6 — Preliminary Major Site Plan Checklist.
ยงย 13-88.7 — Final Major Site Plan Checklist.
ยงย 13-91 — GUARANTEES AND INSPECTIONS.
ยงย 13-102 — CERTIFICATES OF OCCUPANCY.
ยงย 13-106.8 — Site Plan Submission and Approval Requirements.
ยงย 13-108.11 — Capital Improvements To Ownership Units.
ยงย 21-7 — PROHIBITION OF THE COLLECTION OF WASTE MIXED WITH RECYCLABLE MATERIALS.
add
Single family dwellings
ยงย 10-7.6 — Minimum Design Standards.
13-6{9} — AGRICULTURE, RESIDENTIAL
ยงย 13-107.6 — Fee for Permits.
add
Single-family dwellings
ยงย 10-7.6 — Minimum Design Standards.
13-6{69} — GROUP HOME
ยงย 13-10.1 — Agricultural Uses.
ยงย 13-110.4 — Stormwater Management Requirements for Major Development.
add
Site plan approval
ยงย 10-7.7 — Review Permit: Inspection Procedures, Enforcement.
ยงย 12-2.6 — Permit exemption.
ยงย 13-15.3 — Procedures.
ยงย 13-38.3 — Zoning Regulations Pertaining to Residential Scale Solar Energy Systems.
ยงย 13-80 — JURISDICTION OF RESPONSIBILITY DURING DEVELOPMENT APPLICATION REVIEW.
ยงย 13-84.2 — Uses Requiring Site Plan Approval.
ยงย 13-84.4 — Environmental Impact Statements.
ยงย 13-84.5 — Community Impact Statement.
ยงย 13-84.7 — Geologic Investigations.
ยงย 13-85 — MINOR SUBDIVISION AND SITE PLAN APPROVAL.
ยงย 13-85.2 — Submission Requirements.
ยงย 13-85.7 — Action.
ยงย 13-85.8 — Effect of Approval.
ยงย 13-85.10 — Extensions.
ยงย 13-85.11 — Distribution of Copies.
ยงย 13-86 — PRELIMINARY MAJOR SUBDIVISION AND SITE PLAN APPROVAL.
ยงย 13-86.8 — Action.
ยงย 13-86.9 — Effect of Preliminary Approval of Major Subdivision and Site Plans.
ยงย 13-86.10 — Compliance with Site Plan Approval.
ยงย 13-86.11 — Revocation of Construction Permit.
ยงย 13-87.2 — Submission Requirements.
ยงย 13-87.8 — Improvement Guarantees Required; Surety; Release.
ยงย 13-87.10 — Compliance with Final Site Plan Approval.
ยงย 13-88.3 — Minor Site Plan Checklist.
ยงย 13-91 — GUARANTEES AND INSPECTIONS.
ยงย 13-102 — CERTIFICATES OF OCCUPANCY.
ยงย 13-109.4 — Abatement of Violation.
ยงย 13-110.4 — Stormwater Management Requirements for Major Development.
ยงย 21-6 — NEW DEVELOPMENTS OF MULTI-FAMILY RESIDENTIAL UNITS OR COMMERCIAL, INSTITUTIONAL, OR INDUSTRIAL PROPERTIES.
add
Site plan review
ยงย 12-2.7 — Township Engineer Review; Violations.
13-6{57} — FARM STAND
ยงย 13-10.2 — Houses of Worship.
ยงย 13-11.3 — Home Occupations.
ยงย 13-71.2 — Powers and Jurisdiction of Planning Board.
ยงย 13-106.8 — Site Plan Submission and Approval Requirements.
add
Site plan review and approval
ยงย 13-10.2 — Houses of Worship.
ยงย 13-11.3 — Home Occupations.
ยงย 13-106.8 — Site Plan Submission and Approval Requirements.
add
Site plans
ยงย 10-7.7 — Review Permit: Inspection Procedures, Enforcement.
ยงย 12-2.6 — Permit exemption.
ยงย 12-2.7 — Township Engineer Review; Violations.
13-6{13} — APPLICATION FOR DEVELOPMENT
13-6{36} — CONCEPT PLAN
13-6{57} — FARM STAND
13-6{93} — MAJOR SITE PLAN
13-6{98} — MINOR SITE PLAN
13-6{119} — PLAT
13-6{124} — PUBLIC IMPROVEMENTS
13-6{150} — SITE PLAN
ยงย 13-10.2 — Houses of Worship.
ยงย 13-11.3 — Home Occupations.
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-15.3 — Procedures.
ยงย 13-38.3 — Zoning Regulations Pertaining to Residential Scale Solar Energy Systems.
ยงย 13-40.1 — General Design Standards.
ยงย 13-40.2 — Residential Design Standards.
ยงย 13-44.2 — Landscape Plan.
ยงย 13-71.2 — Powers and Jurisdiction of Planning Board.
ยงย 13-71.3 — Ancillary Powers of the Planning Board.
ยงย 13-72.3 — Notice of Applications.
ยงย 13-80 — JURISDICTION OF RESPONSIBILITY DURING DEVELOPMENT APPLICATION REVIEW.
ยงย 13-81 — APPLICATION REQUIREMENTS.
ยงย 13-83 — CONCEPT PLANS AND SKETCH PLATS.
ยงย 13-84.1 — Submission Procedures.
ยงย 13-84.2 — Uses Requiring Site Plan Approval.
ยงย 13-84.3 — Additional Requirements.
ยงย 13-84.4 — Environmental Impact Statements.
ยงย 13-84.5 — Community Impact Statement.
ยงย 13-84.6 — Traffic Impact Statement.
ยงย 13-84.7 — Geologic Investigations.
ยงย 13-85 — MINOR SUBDIVISION AND SITE PLAN APPROVAL.
ยงย 13-85.2 — Submission Requirements.
ยงย 13-85.3 — Review.
ยงย 13-85.7 — Action.
ยงย 13-85.8 — Effect of Approval.
ยงย 13-85.9 — Filing with the County Recording Officer.
ยงย 13-85.10 — Extensions.
ยงย 13-85.11 — Distribution of Copies.
ยงย 13-86 — PRELIMINARY MAJOR SUBDIVISION AND SITE PLAN APPROVAL.
ยงย 13-86.1 — Application.
ยงย 13-86.2 — Submission Requirements.
ยงย 13-86.8 — Action.
ยงย 13-86.9 — Effect of Preliminary Approval of Major Subdivision and Site Plans.
ยงย 13-86.10 — Compliance with Site Plan Approval.
ยงย 13-86.11 — Revocation of Construction Permit.
ยงย 13-86.13 — Distribution of Approved Preliminary Major Subdivision and Site Plans.
ยงย 13-87 — FINAL APPROVAL OF MAJOR SUBDIVISIONS AND SITE PLANS.
ยงย 13-87.1 — Application.
ยงย 13-87.2 — Submission Requirements.
ยงย 13-87.3 — Exhibits Required.
ยงย 13-87.4 — Review.
ยงย 13-87.6 — Final Approval of Site Plans and Major Subdivisions.
ยงย 13-87.7 — Effect of Final Approval of Site Plan or Major Subdivision.
ยงย 13-87.8 — Improvement Guarantees Required; Surety; Release.
ยงย 13-87.10 — Compliance with Final Site Plan Approval.
ยงย 13-87.14 — Distribution of Approved Plat.
ยงย 13-88.3 — Minor Site Plan Checklist.
ยงย 13-88.6 — Preliminary Major Site Plan Checklist.
ยงย 13-88.7 — Final Major Site Plan Checklist.
ยงย 13-88.8 — Variance Application Checklist.
ยงย 13-90A — FEES ENUMERATED.
ยงย 13-91 — GUARANTEES AND INSPECTIONS.
ยงย 13-102 — CERTIFICATES OF OCCUPANCY.
ยงย 13-106.3 — Overall Comprehensive Plan.
ยงย 13-106.5 — Area and Setback Requirements.
ยงย 13-106.8 — Site Plan Submission and Approval Requirements.
ยงย 13-109.3 — Notice of Violations.
ยงย 13-109.4 — Abatement of Violation.
ยงย 13-110.4 — Stormwater Management Requirements for Major Development.
ยงย 13-110.9 — Requirements for a Site Development Stormwater Plan.
ยงย 21-6 — NEW DEVELOPMENTS OF MULTI-FAMILY RESIDENTIAL UNITS OR COMMERCIAL, INSTITUTIONAL, OR INDUSTRIAL PROPERTIES.
add
Sketch plats
ยงย 13-81 — APPLICATION REQUIREMENTS.
ยงย 13-83 — CONCEPT PLANS AND SKETCH PLATS.
ยงย 13-88.1 — Sketch Plat and Concept Plan Checklist.
add
Smoke
ยงย 8-3 — SMOKE SENSITIVE ALARM DEVICES.
13-6{5} — ADVERSE ENVIRONMENTAL IMPACT ELEMENT
ยงย 19-6 — EXCLUSIONS.
add
Smoke detectors
ยงย 19-6 — EXCLUSIONS.
add
Smoking
ยงย 8-3 — SMOKE SENSITIVE ALARM DEVICES.
13-6{5} — ADVERSE ENVIRONMENTAL IMPACT ELEMENT
ยงย 19-6 — EXCLUSIONS.
add
Snow and ice removal
ยงย 2-3.3 — Items To Be Purchased.
13-110.2{40} — STORMWATER
ยงย 13-110.10 — Maintenance and Repair.
add
Soil erosion and sediment control
ยงย 13-84.4 — Environmental Impact Statements.
ยงย 13-88.3 — Minor Site Plan Checklist.
ยงย 13-88.4 — Preliminary Major Subdivision Checklist.
ยงย 13-88.5 — Final Major Subdivision Checklist.
ยงย 13-88.6 — Preliminary Major Site Plan Checklist.
ยงย 13-88.7 — Final Major Site Plan Checklist.
ยงย 13-110.5 — Calculation of Stormwater Runoff and Groundwater Recharge.
add
Solar collectors
13-12.3d2.{4} — SOLAR ARRAY
add
Solar energy systems
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
13-12.3d2.{1} — COMMERCIAL SCALE SOLAR ENERGY SYSTEM
13-12.3d2.{2} — GROUND MOUNTED SOLAR ARRAY
13-12.3d2.{3} — RESIDENTIAL SCALE SOLAR ENERGY SYSTEM
ยงย 13-38 — RESIDENTIAL SOLAR ENERGY SYSTEMS.
ยงย 13-38.1 — Preamble.
13-38.2{1} — RESIDENTIAL SCALE SOLAR ENERGY SYSTEM
13-38.2{2} — SOLAR ACCESSORY BUILDING, STRUCTURE OR USE
13-38.2{3} — SOLAR ENERGY SYSTEMS
ยงย 13-38.3 — Zoning Regulations Pertaining to Residential Scale Solar Energy Systems.
ยงย 13-40.1 — General Design Standards.
ยงย 13-40.2 — Residential Design Standards.
ยงย DL-1 — DISPOSITION OF LEGISLATION.
add
Special permits
ยงย 4-1.12 — Exceptions.
ยงย 13-36.1 — Residential Districts.
add
Speed limits
ยงย 7-11 — SPEED LIMITS.
ยงย 7A-17 — SCHEDULE XVII: SPEED LIMITS.
add
Steep slopes
ยงย 13-110.1 — Scope and Purpose.
13-110.2{16} — ENVIRONMENTALLY CRITICAL AREA
ยงย 13-110.9 — Requirements for a Site Development Stormwater Plan.
add
Stop intersections
ยงย 7-6 — THROUGH STREETS, STOP INTERSECTIONS AND YIELD INTERSECTIONS.
ยงย 7-6.2 — Stop Intersection.
ยงย 7A-8 — SCHEDULE VIII: STOP INTERSECTIONS.
ยงย DL-1 — DISPOSITION OF LEGISLATION.
add
Stop work orders
ยงย 12-2.4 — Permit Requirements; Fees.
ยงย 13-84.7 — Geologic Investigations.
add
Storage
ยงย 3-2.3 — Illegal Dumping.
ยงย 7-3.2 — Parking Prohibited during State of Emergency.
ยงย 9-4 — STORAGE OF TRAILERS RESTRICTED.
13-6{56} — FARM BUILDINGS
13-6{65} — GARAGE, PRIVATE
13-6{114} — OUTDOOR STORAGE
13-6{116} — PARKING LOT
13-6{152} — STORAGE SHED
ยงย 13-9 — USES PROHIBITED IN ALL DISTRICTS.
ยงย 13-10.1 — Agricultural Uses.
ยงย 13-12.1 — Permitted Uses.
ยงย 13-12.2 — Area and Bulk Regulations.
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-36 — OUTDOOR STORAGE.
ยงย 13-36.1 — Residential Districts.
ยงย 13-84.2 — Uses Requiring Site Plan Approval.
ยงย 13-110.10 — Maintenance and Repair.
18-2{7} — DEVELOPMENT
18-2b{7} — LOWEST FLOOR
18-2b{14} — STRUCTURE
ยงย 18-4.1 — Establishment of Development Permit.
ยงย 18-5.1 — General Standards.
ยงย 19-3 — PROHIBITIONS.
ยงย 19-6 — EXCLUSIONS.
ยงย 21-6 — NEW DEVELOPMENTS OF MULTI-FAMILY RESIDENTIAL UNITS OR COMMERCIAL, INSTITUTIONAL, OR INDUSTRIAL PROPERTIES.
ยงย 23-5 — RIGHT TO FARM.
add
Stormwater
13-6{123} — PUBLIC DRAINAGE WAY
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-83 — CONCEPT PLANS AND SKETCH PLATS.
ยงย 13-84.2 — Uses Requiring Site Plan Approval.
ยงย 13-88.3 — Minor Site Plan Checklist.
Ch 13 Art XIV — Stormwater Management and Control
ยงย 13-110 — STORMWATER CONTROL.
ยงย 13-110.1 — Scope and Purpose.
ยงย 13-110.2 — Definitions.
13-110.2{3} — COMMUNITY BASIN
13-110.2{5} — CONTRIBUTORY DRAINAGE AREA
13-110.2{7} — COUNTY REVIEW AGENCY
13-110.2{13} — DRAINAGE AREA
13-110.2{18} — GREEN INFRASTRUCTURE
13-110.2{22} — LEAD PLANNING AGENCY
13-110.2{27} — NEW JERSEY STORMWATER BEST MANAGEMENT PRACTICES (BMP) MANUAL or BMP MANUAL
13-110.2{33} — REGULATED IMPERVIOUS SURFACE
13-110.2{34} — REGULATED MOTOR VEHICLE SURFACE
13-110.2{40} — STORMWATER
13-110.2{41} — STORMWATER MANAGEMENT BMP
13-110.2{42} — STORMWATER MANAGEMENT MEASURE
13-110.2{43} — STORMWATER RUNOFF
13-110.2{44} — TIDAL FLOOD HAZARD AREA
ยงย 13-110.3 — Design and Performance Standards for Stormwater Management Measures.
ยงย 13-110.4 — Stormwater Management Requirements for Major Development.
ยงย 13-110.5 — Calculation of Stormwater Runoff and Groundwater Recharge.
ยงย 13-110.6 — Sources for Technical Guidance.
ยงย 13-110.7 — Solids and Floatable Materials Control Standards.
ยงย 13-110.8 — Safety Standards for Stormwater Management Basins.
ยงย 13-110.9 — Requirements for a Site Development Stormwater Plan.
ยงย 13-110.10 — Maintenance and Repair.
ยงย DL-1 — DISPOSITION OF LEGISLATION.
add
Stormwater control
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-110 — STORMWATER CONTROL.
ยงย 13-110.4 — Stormwater Management Requirements for Major Development.
add
Stormwater management
ยงย 13-12.3 — Conditionally Permitted Uses in the LD Zone.
ยงย 13-83 — CONCEPT PLANS AND SKETCH PLATS.
ยงย 13-84.2 — Uses Requiring Site Plan Approval.
Ch 13 Art XIV — Stormwater Management and Control
ยงย 13-110.1 — Scope and Purpose.
ยงย 13-110.2 — Definitions.
13-110.2{5} — CONTRIBUTORY DRAINAGE AREA
13-110.2{7} — COUNTY REVIEW AGENCY
13-110.2{18} — GREEN INFRASTRUCTURE
13-110.2{22} — LEAD PLANNING AGENCY
13-110.2{27} — NEW JERSEY STORMWATER BEST MANAGEMENT PRACTICES (BMP) MANUAL or BMP MANUAL
13-110.2{34} — REGULATED MOTOR VEHICLE SURFACE
13-110.2{41} — STORMWATER MANAGEMENT BMP
13-110.2{42} — STORMWATER MANAGEMENT MEASURE
ยงย 13-110.3 — Design and Performance Standards for Stormwater Management Measures.
ยงย 13-110.4 — Stormwater Management Requirements for Major Development.
ยงย 13-110.5 — Calculation of Stormwater Runoff and Groundwater Recharge.
ยงย 13-110.6 — Sources for Technical Guidance.
ยงย 13-110.8 — Safety Standards for Stormwater Management Basins.
ยงย 13-110.9 — Requirements for a Site Development Stormwater Plan.
ยงย 13-110.10 — Maintenance and Repair.
ยงย DL-1 — DISPOSITION OF LEGISLATION.
add
Stormwater quality
ยงย 13-110.3 — Design and Performance Standards for Stormwater Management Measures.
ยงย 13-110.9 — Requirements for a Site Development Stormwater Plan.
add
Street closings
ยงย 10-10 — ROADWAY OPENING AND EXCAVATIONS.
add
Swimming pools
Ch 11 — Swimming Pools
ยงย 11-1 — PREAMBLE.
11-2{1} — PRIVATE SWIMMING POOL
ยงย 11-3 — PERMIT.
ยงย 11-4 — LOCATION.
ยงย 11-5 — LIGHTS.
ยงย 13-12.2 — Area and Bulk Regulations.
ยงย 13-32 — ACCESSORY BUILDINGS, STRUCTURES AND USES.
ยงย 13-34 — SWIMMING POOLS, TENNIS COURTS AND SIMILAR PRIVATE RECREATIONAL FACILITIES.