home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
help_center
Help
Help
About Us
ecode
ecode
search
warning
Login
Borough of Interlaken, NJ
chevron_right
2022-10-19
info
chevron_right
Index: W
Filter By Letter
A
B
C
D
E
F
G
H
I
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
W
add
Waivers
ยงย 2-15.3 — Duties; Fees.
ยงย 18-1.5 — Excavation Barred in New Street Improvements.
ยงย 18-1.8 — Excavation Permit Fees; Waiver.
ยงย 18-1.9 — Cash Repairs Deposits; Waiver.
ยงย 24-3.2 — General.
ยงย 24-5.1 — Information for Development in Flood Hazard Areas.
ยงย 26-71.4 — Stormwater Management Requirements for Major Development.
ยงย 26-71.9 — Requirements for a Site Development Stormwater Plan.
ยงย 27-5.1 — Required Documents.
ยงย 27-6.1 — Required Documents.
ยงย 27-7.1 — Required Documents.
ยงย 27-7.2 — Final Plat Requirements.
ยงย 28-2 — APPLICATIONS.
ยงย DL-1 — DISPOSITION OF LEGISLATION.
add
Walls
ยงย 10-1.2 — Construction Permit Fee Schedule.
ยงย 13-3.10 — Accessory Use; Setbacks.
ยงย 16-1.9 — Polyvinyl Pipe.
ยงย 18-6.1 — Height Restrictions.
ยงย 24-1.5 — Ordinary Building Maintenance and Minor Work.
ยงย 24-5.1 — Information for Development in Flood Hazard Areas.
24-9.2{18} — BREAKAWAY WALLS
24-9.2{19} — BUILDING
24-9.2{25} — ELEVATED BUILDING
24-9.2{42} — HIGHEST ADJACENT GRADE
24-9.2{64} — START OF CONSTRUCTION
24-9.2{65} — STRUCTURE
ยงย 24-15.2 — Requirements for Habitable Buildings and Structures.
ยงย 24-15.5 — Retaining Walls, Sidewalks, and Driveways.
ยงย 24-17.1 — Utility and Miscellaneous Group U.
ยงย 24-17.4 — Enclosures Below Base Flood Elevation.
26-4{1} — ACCESSORY BUILDING, STRUCTURE OR USE
26-4{2} — ALTERATIONS, STRUCTURAL
26-4{5} — BUILDING
26-4{19} — FLOOR AREAS
26-4{40} — STORY
26-4{42} — STRUCTURE
ยงย 26-49 — FENCE REGULATIONS.
26-71.2{50} — WATER CONTROL STRUCTURE
add
Waste disposal, improper
ยงย 3-19 — IMPROPER DISPOSAL OF WASTE.
add
Water
1-2{17} — PUBLIC GROUNDS, PUBLIC SQUARES, PUBLIC PLACE OR PUBLIC PLACES
ยงย 3-12.9 — Littering in Bodies of Water.
3-18.2{2} — ILLICIT CONNECTION
3-18.2{3} — INDUSTRIAL WASTE
3-18.2{6} — NON-CONTACT COOLING WATER
3-18.2{8} — PROCESS WASTEWATER
3-18.2{9} — STORMWATER
ยงย 3-18.3 — Prohibited Conduct.
3-19.2{3} — STORMWATER
ยงย 3-19.4 — Exceptions to Prohibition.
5-6.1{1} — WATERFOWL
ยงย 10-1.2 — Construction Permit Fee Schedule.
13-1{5} — SAFETY FEATURES
ยงย 13-3.2 — Square Footage.
ยงย 13-3.11 — Cover; Pool Fill.
Ch 15 — Water
ยงย 15-1 — WATER EMERGENCIES.
ยงย 15-1.1 — Findings.
ยงย 15-1.2 — Declaration of Water Emergency.
ยงย 15-1.3 — Water Use Restrictions.
ยงย 15-1.4 — Duration of Water Use Restrictions.
ยงย 15-1.5 — Enforcement.
ยงย 16-1.1 — Statutory Reference.
ยงย 16-1.7 — Sewers Near Water Supply Wells.
ยงย 16-2.4 — Damaged Pipes or Fixtures; Owners' Responsibility.
ยงย 16-5 — DISCHARGE OF STORMWATER AND OTHER INFILTRATION OF WATER.
16-5.3{1} — SANITARY SEWAGE
ยงย 16-5.6 — Infiltration of Substances Other Than Sewage Into Sewer Systems Prohibited.
ยงย 18-1.1 — Permit Required.
20-1.2{3} — DISCHARGE
20-1.2{5} — HAZARDOUS MATERIALS
ยงย 24-2.2 — Establishment of Flood Hazard Areas.
ยงย 24-3.6 — Other Permits.
ยงย 24-3.13 — Development in Riparian Zones.
ยงย 24-7.5 — Considerations.
24-9.2{3} — A ZONES
24-9.2{7} — ALTERATION OF A WATERCOURSE
24-9.2{13} — BASE FLOOD ELEVATION (BFE)
24-9.2{29} — FLOOD HAZARD AREA DESIGN FLOOD ELEVATION
24-9.2{31} — FLOOD INSURANCE STUDY (FIS)
24-9.2{32} — FLOOD or FLOODING
24-9.2{34} — FLOODPLAIN or FLOOD PRONE AREA
24-9.2{35} — FLOODPROOFING
24-9.2{37} — FLOODWAY
24-9.2{39} — FUNCTIONALLY DEPENDENT USE
24-9.2{62} — SOLID WASTE DISPOSAL
24-9.2{63} — SPECIAL FLOOD HAZARD AREA
24-9.2{72} — WATER SURFACE ELEVATION
24-9.2{73} — WATERCOURSE
ยงย 24-10.1 — General.
ยงย 24-11.2 — Sewer Facilities.
ยงย 24-11.3 — Water Facilities.
ยงย 24-11.4 — Storm Drainage.
ยงย 24-12.6 — Protection of Mechanical Equipment and Outside Appliances.
ยงย 24-15.7 — Roads and Watercourse Crossings.
ยงย 24-16.1 — Temporary Structures.
ยงย 24-17.6 — Protection of Mechanical, Plumbing, and Electrical Systems.
26-4{15} — ESSENTIAL SERVICES
26-4{18} — FLOODPLAIN
26-4{22} — HOME OCCUPATION
26-4{23} — IMPERVIOUS SURFACE AREA
ยงย 26-11 — INTERPRETATION OF ZONE BOUNDARIES.
ยงย 26-19 — PERMITTED HEIGHT EXCEPTIONS.
ยงย 26-71.1 — Scope and Purpose.
26-71.2{7} — COUNTY REVIEW AGENCY
26-71.2{17} — EROSION
26-71.2{19} — HUC 14 or HYDROLOGIC UNIT CODE 14
26-71.2{20} — IMPERVIOUS SURFACE
26-71.2{21} — INFILTRATION
26-71.2{31} — POLLUTANT
26-71.2{32} — RECHARGE
26-71.2{34} — REGULATED MOTOR VEHICLE SURFACE
26-71.2{35} — SEDIMENT
26-71.2{40} — STORMWATER
26-71.2{41} — STORMWATER MANAGEMENT BASIN
26-71.2{43} — STORMWATER RUNOFF
26-71.2{50} — WATER CONTROL STRUCTURE
26-71.2{51} — WATERS OF THE STATE
26-71.2{52} — WETLANDS or WETLAND
ยงย 26-71.3 — Design and Performance Standards for Stormwater Management Measures.
ยงย 26-71.4 — Stormwater Management Requirements for Major Development.
ยงย 26-71.5 — Calculation of Stormwater Runoff and Groundwater Recharge.
ยงย 26-71.6 — Sources for Technical Guidance.
ยงย 26-71.7 — Solids and Floatable Materials Control Standards.
ยงย 26-71.8 — Safety Standards for Stormwater Management Basins.
ยงย 26-71.9 — Requirements for a Site Development Stormwater Plan.
ยงย 27-1 — PURPOSE AND PROCEDURE.
ยงย 27-6.2 — Plat Requirements.
ยงย 27-7.2 — Final Plat Requirements.
ยงย 27-7.3 — Conditions of Approval.
add
Watercourses
ยงย 24-2.3 — Establishing the Local Design Flood Elevation (LDFE).
ยงย 24-3.4 — Duties.
ยงย 24-3.11 — Watercourse Alteration.
ยงย 24-3.11.1 — Engineering Analysis.
ยงย 24-3.15 — Department Records.
ยงย 24-5.1 — Information for Development in Flood Hazard Areas.
ยงย 24-5.3 — Analyses and Certifications By a Licensed Professional Engineer.
24-9.2{7} — ALTERATION OF A WATERCOURSE
24-9.2{37} — FLOODWAY
24-9.2{73} — WATERCOURSE
ยงย 24-15.7 — Roads and Watercourse Crossings.
ยงย 26-71.4 — Stormwater Management Requirements for Major Development.
ยงย 27-5.2 — Plat Requirements.
ยงย 27-6.2 — Plat Requirements.
ยงย 27-7.2 — Final Plat Requirements.
add
Water pollution
ยงย 16-1.1 — Statutory Reference.
20-1.2{5} — HAZARDOUS MATERIALS
add
Water supply
ยงย 16-1.7 — Sewers Near Water Supply Wells.
ยงย 27-1 — PURPOSE AND PROCEDURE.
add
Weapons
ยงย 3-15.2 — Powers of the Mayor.
add
Web sites
ยงย 26-71.4 — Stormwater Management Requirements for Major Development.
ยงย 26-71.5 — Calculation of Stormwater Runoff and Groundwater Recharge.
ยงย 26-71.6 — Sources for Technical Guidance.
add
Well
ยงย 1-3 — CONSTRUCTION.
ยงย 2-46.2 — Procedure for Payment.
ยงย 3-3.3 — Exceptions for Unopened Containers.
ยงย 15-1.2 — Declaration of Water Emergency.
ยงย 16-1.7 — Sewers Near Water Supply Wells.
ยงย 16-2.1 — Assessment of Costs.
ยงย 16-2.10 — Compliance.
ยงย 17-2.1 — Source Separation of Recyclable Materials.
ยงย 18-1.4 — Excavation and Backfilling.
ยงย 24-3.11 — Watercourse Alteration.
24-9.2{31} — FLOOD INSURANCE STUDY (FIS)
ยงย 25-1.11 — Applications; Procedures for Filing.
ยงย 26-3 — GENERAL MEANING OF WORDS AND PHRASES.
ยงย 26-47 — OFF-STREET PARKING, LOADING AND UNLOADING REQUIREMENTS.
26-71.2{15} — ENVIRONMENTALLY CRITICAL AREA
26-71.2{23} — MAJOR DEVELOPMENT
ยงย 26-71.4 — Stormwater Management Requirements for Major Development.
ยงย 26-71.10 — Maintenance and Repair.
ยงย 27-7.2 — Final Plat Requirements.
add
Wildlife
ยงย 3-16 — WILDLIFE SANCTUARY CREATED; DISCHARGE OF FIREARMS PROHIBITED.
ยงย 3-16.2 — Wildlife Sanitary Created.
Ch 5 Art II — Waterfowl/Wildlife
ยงย 5-6.3 — Exceptions.
ยงย 5-7 — WILDLIFE FEEDING PROGRAM.
ยงย 5-7.1 — Purpose.
5-7.2{1} — FEED
5-7.2{3} — WILDLIFE
ยงย 5-7.3 — Prohibited Conduct.
ยงย 22-1.1 — Intent and Purpose.
ยงย 22-2.4 — Tree Removal Permit.
ยงย DL-1 — DISPOSITION OF LEGISLATION.
add
Wildlife feeding
ยงย 5-7 — WILDLIFE FEEDING PROGRAM.
5-7.2{1} — FEED
ยงย DL-1 — DISPOSITION OF LEGISLATION.