Index: T
Tax Collector
Taxis
Tenants
ยงย 69-2—
Assignment of numbers.
ยงย 77-13—
Violations and penalties.
ยงย 82-1—
Discharge of firearms restricted.
ยงย 106-7—
Responsibility for costs.
145-15{33}—
DEVELOPER
180-5B{61}—
DEVELOPER
ยงย 180-10—
Violations and penalties.
ยงย 180-100.7—
Regulations by sign type.
ยงย 180-100.9—
Signs in Commercial and Industrial Districts (GB, GB2, LI, LM, O&L).
Terms of office
Tests
ยงย 77-7—
Specifications and requirements.
ยงย 79-2—
Modifications of standards.
ยงย 85-12—
Additional regulations for display fireworks.
ยงย 94-6—
Standards for vertical closed-loop GSHP systems.
ยงย 94-8—
Inspections.
130-11B{1}—
ABSORPTION AREA
ยงย 130-15—
Application procedures; permit issuance.
ยงย 130-17—
Revocations and reinstatement of permits.
ยงย 130-21—
Requirements for official sewer plan revisions and supplements (for subdivisions and land developments).
ยงย 130-27—
Measurements, tests and analyses.
ยงย 130-28—
Rules and regulations for connections to the sewer system.
ยงย 130-33—
Building sewers and connections.
130-48C{6}—
BIOCHEMICAL OXYGEN DEMAND (BOD5)
130-48C{8}—
CARBONACEOUS BIOCHEMICAL OXYGEN DEMAND (CBOD5)
130-48C{10}—
CHEMICAL OXYGEN DEMAND (COD)
130-48C{36}—
pH
130-48C{54}—
TOTAL SUSPENDED SOLIDS (TSS) or SUSPENDED SOLIDS (SS)
ยงย 130-49—
Discharge regulations.
ยงย 130-51—
Permits.
ยงย 137-14—
Calculation methodology.
ยงย 137-14.1—
Post-construction water quality criteria.
ยงย 137-17—
Stormwater infiltration.
ยงย 137-26—
Drainage plan contents.
ยงย 137-39—
Prohibited discharges; exceptions.
ยงย 140-4—
Backfilling.
ยงย 145-21—
Preliminary plan.
ยงย 145-25—
Construction inspection.
ยงย 145-33—
Preliminary plan.
ยงย 145-34—
Final plan.
ยงย 145-49—
Sanitary sewage disposal.
ยงย 145-50—
Water supply and distribution systems.
ยงย 170-31—
Amendments.
ยงย 174-2—
Performance standards.
180-5B{181}—
PREPAREDNESS, PREVENTION AND CONTINGENCY (PPC) PLAN
ยงย 180-102—
Site plan review.
ยงย 180-109—
Industrial uses.
Tires
Tobacco
Toilet facilities
Topsoil protection
Towers
140-22{4}—
COMMERCIAL COMMUNICATIONS FACILITY
140-22{8}—
FACILITY(IES)
140-22{11}—
NONTOWER COMMERCIAL COMMUNICATIONS FACILITY (NONTOWER CCF)
145-15{58}—
KARST
145-15{131}—
STRUCTURE
180-5B{12}—
ALTERNATIVE TOWER STRUCTURES
180-5B{22}—
BASE STATION
180-5B{44}—
COMMERCIAL COMMUNICATIONS FACILITY (CCF)
180-5B{77}—
ELIGIBLE FACILITIES REQUEST
180-5B{120}—
HEIGHT OF TOWER
180-5B{164}—
NONTOWER COMMERCIAL COMMUNICATIONS FACILITY (NONTOWER CCF)
180-5B{190}—
PUBLIC UTILITY TRANSMISSION TOWER
180-5B{236}—
STRUCTURE
180-5B{238}—
SUBSTANTIAL CHANGE or SUBSTANTIALLY CHANGED
180-5B{245}—
TOWER
180-5B{270}—
WIRELESS SUPPORT STRUCTURE
ยงย 180-127.1—
Commercial communications facilities.
Towing
130-22A{14}—
MOBILE HOME
145-15{70}—
MOBILE HOME
ยงย 170-18—
Additional parking regulations.
ยงย 170-35—
Approved towing facilities and storage garages.
ยงย 170-36—
Towing and storage charges.
ยงย 170-38—
Records.
ยงย 170-39—
Liability of owner.
180-5B{148}—
MANUFACTURED HOME
180-5B{153}—
MOBILE HOME
180-5B{192}—
RECREATIONAL VEHICLE
ยงย 180-119—
Residential dwelling units.
Township Council
Ch 1—
General Provisions
ยงย 1-2—
Effect of Code on previous provisions.
ยงย 1-6—
Changes and revisions in previously adopted legislation; new provisions.
ยงย 1-10—
Amendments to Code.
ยงย 1-11—
Code books to be kept up-to-date.
ยงย 1-14—
Severability.
Ch 5—
Administration of Government
ยงย 5-12—
Officers and employees.
Ch 9—
Authorities, Municipal
Ch 14—
Environmental Advisory Council
Ch 17—
Intermunicipal Cooperation
ยงย 17-11—
Township Council President and Secretary authorized to execute agreement.
ยงย 17-12—
Authorization of actions.
ยงย 17-28—
Creation of Committee.
Ch 26—
Local Government Investment Trust
Ch 38—
Pensions
ยงย 38-2—
Administration.
ยงย 38-4—
Contributions.
ยงย 38-12—
Administration.
ยงย 38-13—
Retirement requirements and benefits.
ยงย 38-14—
Contributions.
Ch 53—
Alarms
Ch 59—
Brush, Grass and Weeds
Ch 65—
Building Construction
Ch 69—
Buildings, Numbering of
Ch 75—
Cable Television
ยงย 75-7—
Bond.
Ch 77—
Earth Disturbances
ยงย 77-7—
Specifications and requirements.
ยงย 77-13—
Violations and penalties.
Ch 79—
Electrical Standards
ยงย 79-2—
Modifications of standards.
Ch 82—
Firearms, Bows, Crossbows and Atlatls
Ch 84—
Fire Hydrants
Ch 85—
Fireworks
ยงย 85-16—
Failure to adhere to regulations.
Ch 90—
Floodplain Management
ยงย 90-11—
Application procedures and requirements.
ยงย 90-25—
Permitted uses and development.
Ch 94—
Ground Source Heat Pumps
ยงย 94-8—
Inspections.
ยงย 94-9—
Fees.
Ch 97—
Hazardous Materials
Ch 103—
Junkyards and Junk Dealers
103-1{2}—
COUNCIL
Ch 106—
Lock Boxes
Ch 112—
Nuisances
Ch 118—
Parks and Recreation
Ch 125—
Peddling and Soliciting
Ch 130—
Sewers
ยงย 130-15—
Application procedures; permit issuance.
ยงย 130-16—
Application and permit fees.
Ch 135—
Solid Waste
Ch 137—
Stormwater Management
ยงย 137-18—
Detention basins.
ยงย 137-30—
Hardship waiver procedure.
ยงย 137-32—
Review of drainage plan.
ยงย 137-34—
Responsibilities for operations and maintenance of facilities, including BMPs, infiltration practices and detention facilities.
Ch 140—
Streets and Sidewalks
ยงย 140-18—
Notice to repair or replace.
ยงย 140-20—
Applicability along roads being repaired or reconstructed.
ยงย 140-27—
Rental and right-of-way management fees.
Ch 145—
Subdivision and Land Development
ยงย 145-2—
Authority.
ยงย 145-7—
Application of regulations.
ยงย 145-9—
Waivers and modification.
ยงย 145-11—
Appeals.
145-15{4}—
APPROVAL
145-15{20}—
CONDITIONAL USE
145-15{22}—
COUNCIL
145-15{73}—
MUNICIPAL ENGINEER
145-15{94}—
PUBLIC HEARING
ยงย 145-19—
Initial review.
ยงย 145-21—
Preliminary plan.
ยงย 145-22—
Final plan.
ยงย 145-23—
Exemptions.
ยงย 145-24—
Fees and costs.
ยงย 145-25—
Construction inspection.
ยงย 145-26—
Dedication requirements and procedures.
ยงย 145-27—
Maintenance security.
ยงย 145-28—
Maintenance inspection.
ยงย 145-33—
Preliminary plan.
ยงย 145-34—
Final plan.
ยงย 145-41—
General.
ยงย 145-42—
Blocks.
ยงย 145-43—
Lots.
ยงย 145-44—
Lot access.
ยงย 145-45—
Street design standards.
ยงย 145-49—
Sanitary sewage disposal.
ยงย 145-50—
Water supply and distribution systems.
ยงย 145-51—
Open space and recreation.
ยงย 145-53—
Mobile home parks.
Ch 150—
Taxation
Ch 155—
Trailers
Ch 159—
Transportation of Goods
Ch 166—
Vector Control
ยงย 166-4—
Eradication measures.
Ch 170—
Vehicles and Traffic
Ch 174—
Water
ยงย 174-13—
Default.
ยงย 174-15—
Exemptions from payment of connection fee.
ยงย 174-21—
Rates, rules and regulations.
ยงย 174-24—
Default.
ยงย 174-31—
Rates, rules and regulations.
ยงย 174-32—
Meter installation and inspection fee.
ยงย 174-34—
Default.
ยงย 174-41—
Rates, rules and regulations.
Ch 180—
Zoning
ยงย 180-4—
Amendment procedures.
ยงย 180-5—
Definitions; word usage.
180-5B{49}—
CONDITIONAL USE
ยงย 180-8—
Zoning Officer.
ยงย 180-9—
Fees.
ยงย 180-11—
Zoning Hearing Board.
ยงย 180-20—
Conditional uses.
ยงย 180-26—
Conditional uses.
ยงย 180-32—
Conditional uses.
ยงย 180-38—
Conditional uses.
ยงย 180-44—
Conditional uses.
ยงย 180-50—
Conditional uses.
ยงย 180-56—
Conditional uses.
ยงย 180-62—
Conditional uses.
ยงย 180-65.1—
Architectural requirements.
ยงย 180-68—
Conditional uses.
ยงย 180-74—
Conditional uses.
ยงย 180-79.1—
Conditional uses.
ยงย 180-83.2.1—
Conditional uses.
ยงย 180-86—
Conditional uses.
ยงย 180-91—
Overall requirements.
ยงย 180-95—
Environmental protection standards.
ยงย 180-101—
Purpose.
ยงย 180-102—
Site plan review.
ยงย 180-109—
Industrial uses.
ยงย 180-111—
Club, lodge or social building (private).
ยงย 180-113—
Golf courses.
ยงย 180-116—
Single-family cluster developments.
ยงย 180-121.1—
Residential hospice facility.
ยงย 180-127.1—
Commercial communications facilities.
Township Engineer
ยงย 5-12—
Officers and employees.
ยงย 59-5—
Traffic obstructions.
ยงย 77-5—
Application for permit; fees.
ยงย 77-13—
Violations and penalties.
ยงย 90-35—
Variance procedures and conditions.
ยงย 94-5—
Standards for GSHP systems.
ยงย 94-6—
Standards for vertical closed-loop GSHP systems.
ยงย 94-8—
Inspections.
ยงย 130-3—
General requirements.
137-10{83}—
STORM DRAINAGE PROBLEM AREAS
ยงย 137-14—
Calculation methodology.
ยงย 137-22—
Permit requirements by other government entities.
ยงย 137-28—
Drainage plan review.
ยงย 137-29—
Modification of plans.
ยงย 137-30—
Hardship waiver procedure.
ยงย 137-34—
Responsibilities for operations and maintenance of facilities, including BMPs, infiltration practices and detention facilities.
140-22{20}—
TOWNSHIP ENGINEER
145-15{73}—
MUNICIPAL ENGINEER
145-15{117}—
STORM DRAINAGE PROBLEM AREAS
ยงย 145-18—
Submission of application for development.
ยงย 145-19—
Initial review.
ยงย 145-21—
Preliminary plan.
ยงย 145-22—
Final plan.
ยงย 145-23—
Exemptions.
ยงย 145-25—
Construction inspection.
ยงย 145-27—
Maintenance security.
ยงย 145-28—
Maintenance inspection.
ยงย 145-30—
Liability; insurance.
ยงย 145-33—
Preliminary plan.
ยงย 145-34—
Final plan.
ยงย 145-44—
Lot access.
ยงย 145-45—
Street design standards.
ยงย 145-47—
Lot pins and monuments.
ยงย 145-50—
Water supply and distribution systems.
ยงย 174-15—
Exemptions from payment of connection fee.
ยงย 180-127.1—
Commercial communications facilities.
Township Treasurer
Toxic substances
Trap
Trash
Trees
ยงย 59-3—
Restricted vegetation.
ยงย 59-5—
Traffic obstructions.
ยงย 77-5—
Application for permit; fees.
ยงย 103-8—
Storage; property maintenance; hours.
ยงย 112-5—
Enumeration of nuisances.
ยงย 118-3—
Prohibited acts.
ยงย 118-3.1—
Saucon Rail Trail prohibited acts.
ยงย 118-6—
Damages.
ยงย 130-28—
Rules and regulations for connections to the sewer system.
ยงย 140-26—
Standards of service.
ยงย 145-33—
Preliminary plan.
ยงย 145-36—
Required improvements.
ยงย 145-52—
Landscaping.
150-15{8}—
REAL ESTATE
ยงย 170-15—
Snow and ice removal.
180-5B{9}—
AGRICULTURE
180-5B{12}—
ALTERNATIVE TOWER STRUCTURES
180-5B{19}—
BASAL AREA
180-5B{31}—
CANOPY
180-5B{39}—
CLEAR CUTTING
180-5B{104}—
FORESTRY
180-5B{112}—
GREENHOUSE
180-5B{118}—
HEDGE
180-5B{147}—
LOT WIDTH
180-5B{167}—
NURSERY
180-5B{214}—
SCREENING
180-5B{243}—
TEMPORARY STAND
180-5B{252}—
VEGETATION
180-5B{271}—
WOODLAND
180-5B{272}—
WOODLAND CANOPY
180-5B{274}—
WOODLAND UNDERSTORY
ยงย 180-6—
Zoning permit required.
ยงย 180-8—
Zoning Officer.
ยงย 180-95—
Environmental protection standards.
ยงย 180-97—
Landscaping.
ยงย 180-100.4—
Prohibited signs.
ยงย 180-102—
Site plan review.
ยงย 180-116—
Single-family cluster developments.
ยงย 180-117—
Rental and condominium dwelling units.
ยงย 180-127.1—
Commercial communications facilities.
ยงย 180-127.2—
Forestry.
180-127.2C{1}—
FELLING
180-127.2C{2}—
FORESTRY
180-127.2C{8}—
PRECOMMERCIAL TIMBER STAND IMPROVEMENT
180-127.2C{9}—
SKIDDING
180-127.2C{10}—
SLASH
180-127.2C{13}—
TIMBER HARVESTING, TREE HARVESTING, or LOGGING
180-127.2C{14}—
TOP
Trenches
ยงย 94-7—
Standards for horizontal closed-loop systems.
ยงย 94-8—
Inspections.
ยงย 130-14—
General requirements.
ยงย 130-15—
Application procedures; permit issuance.
ยงย 130-28—
Rules and regulations for connections to the sewer system.
137-10{23}—
DIRECT RECHARGE/SUBSURFACE BMP
137-10{37}—
INFILTRATION PRACTICE
137-10{76}—
SEEPAGE PIT/SEEPAGE TRENCH
ยงย 137-26—
Drainage plan contents.
ยงย 140-4—
Backfilling.
145-15{57}—
INFILTRATION PRACTICE
145-15{109}—
SEEPAGE PIT or SEEPAGE TRENCH
ยงย 145-25—
Construction inspection.
ยงย 180-94—
Water and sewage.
ยงย 180-102—
Site plan review.
Trespassing