Village of Maple Bluff, WI
Dane County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
A B C D E F G H I J L M N O P Q R S T U V W Y Z
Electrical standards
Elevators
§ 115-11 — Erosion control plan requirements. § 115-12 — Stormwater management plan requirements. § 225-19 — Board of Appeals. § 225-22 — Enforcement; plans and specifications; building permits. § 225-29 — Design review process. § 225-30 — Basis for design review. § 225-43.1 — Planned Unit Development District (PUD). § 225-49 — Application for conditional use. § 225-60 — Height limitations. § 225-68 — Checklist of materials to be submitted for review of parking areas. § 225-80 — Grade level. 225-103{39} — Definitions. § 226-5 — General provisions. § 226-6 — General standards applicable to all floodplain districts. § 226-10 — Public or private campgrounds. § 226-13 — Standards for developments in the floodway. § 226-17 — Standards for development in the floodfringe. § 226-20 — Standards for development in the general floodplain district. § 226-21 — Determining floodway and floodfringe limits. § 226-22 — General. § 226-23 — Floodway district. § 226-24 — Floodfringe district. § 226-26 — Zoning administrator. § 226-28 — Board of adjustment/appeals. § 226-29 — Appeals of permit denials. § 226-30 — Floodproofing standards for nonconforming structures or uses. § 226-33 — General. 226-36{13} — Definitions. 226-36{19} — Definitions. 226-36{23} — Definitions. 226-36{25} — Definitions. 226-36{27} — Definitions. 226-36{28} — Definitions. 226-36{40} — Definitions. 226-36{42} — Definitions. 226-36{44} — Definitions. 226-36{58} — Definitions. 226-36{60} — Definitions. 226-36{61} — Definitions. 226-36{79} — Definitions. 226-36{80} — Definitions.