Index: W
Waivers
ยงย 26-101.8—
Violations and Penalties.
ยงย 26-103.2—
General Authority.
ยงย 26-105.1—
Information for Development in Flood Hazard Areas.
ยงย 30-302.2—
Exemptions from Site Plan Review Requirements; Minor Site Plans.
ยงย 30-308.3—
Preliminary Plat of Major Subdivision Standards.
ยงย 30-308.4—
Final Plat of Major Subdivision Standards.
ยงย 30-309.2—
Classification Sketch Plat Standards
ยงย 30-309.6—
Final Site Plan Plat Standards.
ยงย 30-403—
PERMIT REQUIRED.
ยงย 30-604—
STORMWATER MANAGEMENT REQUIREMENTS FOR MAJOR DEVELOPMENT.
ยงย 30-609—
REQUIREMENTS FOR A SITE DEVELOPMENT STORMWATER PLAN.
ยงย 30-702.6—
Utilities.
ยงย 31-713—
RESTRICTIONS ON REGULATED USES.
ยงย 31-714.17—
Other Requirements.
ยงย BH1-5—
Fee Schedule.
Walls
ยงย 26-101.5—
Ordinary Building Maintenance and Minor Work.
ยงย 26-105.1—
Information for Development in Flood Hazard Areas.
26-201.2{18}—
BREAKAWAY WALLS
26-201.2{19}—
BUILDING
26-201.2{25}—
ELEVATED BUILDING
26-201.2{42}—
HIGHEST ADJACENT GRADE
26-201.2{64}—
START OF CONSTRUCTION
26-201.2{65}—
STRUCTURE
ยงย 26-801.2—
Requirements for Habitable Buildings and Structures.
ยงย 26-801.5—
Retaining Walls, Sidewalks, and Driveways.
ยงย 26-1001.1—
Utility and Miscellaneous Group U.
ยงย 26-1001.4—
Enclosures Below Base Flood Elevation.
ยงย 30-309.5—
Site Plan Information for Preliminary and Final Approval.
30-602{44}—
WATER CONTROL STRUCTURE
ยงย 30-702.1—
Roads.
ยงย 30-702.4—
Storm Sewers; Drainage.
31-301{1}—
ACCESSORY BUILDING
31-301{23}—
FLOOR AREA
31-301{62}—
STORY
31-301{68}—
TOWNHOUSE
ยงย 31-406.1—
Off-Street Parking and Driveways.
ยงย 31-409—
TRAFFIC VISIBILITY AT CORNER LOTS AND DRIVEWAYS.
ยงย 31-414—
OUTDOOR STORAGE OR DISPLAY.
ยงย 31-504—
REPAIR FOR SAFETY.
ยงย 31-608.2—
Setback Requirements.
ยงย 31-608.3—
Building Requirements.
ยงย 31-608.4—
Dwelling Unit Requirements.
ยงย 31-608.7—
Landscaping and Open Space Requirements.
ยงย 31-610.6—
Landscaping and Open Space Requirements.
ยงย BH2-2—
Sidewalk Cafes.
BH4-3A.{4}—
IDENTIFYING MOLDS
BH4-3A.{12}—
REMOVAL OF MOLD-CONTAMINATED MATERIALS
BH5-9A.{10}—
INTERNAL CROSS-SECTIONAL
BH5-11A.{2}—
CIGAR BAR
BH5-11A.{3}—
CIGAR LOUNGE
ยงย BH7-5—
Design Requirements.
Water
ยงย 25-4—
ISSUANCE OF PERMITS.
ยงย 26-102.2—
Establishment of Flood Hazard Areas.
ยงย 26-103.6—
Other Permits.
ยงย 26-103.12—
Development in Riparian Zones.
ยงย 26-107.5—
Considerations.
26-201.2{3}—
A ZONES
26-201.2{7}—
ALTERATION OF A WATERCOURSE
26-201.2{13}—
BASE FLOOD ELEVATION (BFE)
26-201.2{29}—
FLOOD HAZARD AREA DESIGN FLOOD ELEVATION
26-201.2{31}—
FLOOD INSURANCE STUDY (FIS)
26-201.2{32}—
FLOOD or FLOODING
26-201.2{34}—
FLOODPLAIN or FLOOD-PRONE AREA
26-201.2{35}—
FLOODPROOFING
26-201.2{37}—
FLOODWAY
26-201.2{39}—
FUNCTIONALLY DEPENDENT USE
26-201.2{62}—
SOLID WASTE DISPOSAL
26-201.2{63}—
SPECIAL FLOOD HAZARD AREA
26-201.2{72}—
WATER SURFACE ELEVATION
26-201.2{73}—
WATERCOURSE
ยงย 26-301.1—
Review of Proposals.
ยงย 26-401.3—
Water Facilities.
ยงย 26-401.4—
Storm Drainage.
ยงย 26-501.6—
Protection of Mechanical Equipment and Outside Appliances.
ยงย 26-1001.6—
Protection of Mechanical, Plumbing, and Electrical Systems.
30-103{2}—
ADVERSE EFFECT
ยงย 30-108—
PUBLIC UTILITIES.
ยงย 30-304—
INFORMAL REVIEW.
ยงย 30-307.1—
Filing Procedures.
ยงย 30-308.3—
Preliminary Plat of Major Subdivision Standards.
ยงย 30-308.5—
Final Plans Accompanying Final Plat.
ยงย 30-309.3—
Sketch Plat Major Site Plan Standards
ยงย 30-309.5—
Site Plan Information for Preliminary and Final Approval.
30-402{6}—
EROSION
30-402{8}—
LAND
30-402{14}—
SEDIMENT
ยงย 30-406—
GENERAL DESIGN AND PROCEDURAL REQUIREMENTS.
30-502{4}—
CRITICAL AREA
ยงย 30-504—
DATA REQUIRED.
ยงย 30-508—
EXEMPTIONS.
ยงย 30-601—
SCOPE AND PURPOSE.
30-602{6}—
COUNTY REVIEW AGENCY
30-602{15}—
EROSION
30-602{17}—
HUC 14 or HYDROLOGIC UNIT CODE 14
30-602{18}—
IMPERVIOUS SURFACE
30-602{19}—
INFILTRATION
30-602{29}—
POLLUTANT
30-602{30}—
RECHARGE
30-602{32}—
REGULATED MOTOR VEHICLE SURFACE
30-602{33}—
SEDIMENT
30-602{38}—
STORMWATER
30-602{39}—
STORMWATER MANAGEMENT BMP
30-602{43}—
STORMWATER RUNOFF
30-602{44}—
WATER CONTROL STRUCTURE
30-602{45}—
WATERS OF THE STATE
30-602{46}—
WETLANDS or WETLAND
ยงย 30-603—
DESIGN AND PERFORMANCE STANDARDS FOR STORMWATER MANAGEMENT MEASURES.
ยงย 30-604—
STORMWATER MANAGEMENT REQUIREMENTS FOR MAJOR DEVELOPMENT.
ยงย 30-605—
CALCULATION OF STORMWATER RUNOFF AND GROUNDWATER RECHARGE.
ยงย 30-606—
SOURCES FOR TECHNICAL GUIDANCE.
ยงย 30-607—
SOLIDS AND FLOATABLE MATERIALS CONTROL STANDARDS.
ยงย 30-608—
SAFETY STANDARDS FOR STORMWATER MANAGEMENT BASINS.
ยงย 30-609—
REQUIREMENTS FOR A SITE DEVELOPMENT STORMWATER PLAN.
ยงย 30-702.1—
Roads.
ยงย 30-702.11—
Water.
ยงย 30-703—
OFF-SITE AND OFF-TRACT IMPROVEMENTS.
ยงย 30-703.1—
Essential Off-Site Improvements.
ยงย 30-703.3—
Required Improvements.
ยงย 30-703.5—
General Standards for Other Improvements.
ยงย 30-704.2—
Tress and Ground Cover.
ยงย 30-704.4—
Drainage.
ยงย 30-801—
FINAL PLAT APPROVAL, REQUIREMENTS.
ยงย 30-804—
GUARANTEES.
ยงย 30-808—
CONSTRUCTION PERMITS.
ยงย 30-810—
FIRE HYDRANTS.
ยงย 30-904—
APPEALS FROM BOROUGH ENGINEER DECISIONS.
31-301{20}—
ESSENTIAL SERVICES
31-301{28}—
JUNK
31-301{61}—
SITE PLAN
ยงย 31-415.1—
Applicability.
ยงย 31-714.6—
Location Priorities.
ยงย 31-714.7—
Area, Setback and Miscellaneous Requirements.
ยงย 31-1101—
CONNECTION OF SUMP PUMPS OR RAINWATER DRAINAGE TO THE SANITARY SEWER SYSTEM IS PROHIBITED.
ยงย 31-1102—
SUMP PUMP INSPECTIONS AND CERTIFICATES.
ยงย 31-1104—
PENALTIES FOR OFFENSES.
ยงย BH2-2—
Sidewalk Cafes.
BH4-3A.{4}—
IDENTIFYING MOLDS
ยงย BH5-1—
Nuisances Generally.
ยงย BH5-4—
Prohibited Lease Or Rental Of Certain Buildings.
ยงย BH5-9—
Air Pollution Control.
BH5-9A.{20}—
PARTICLES
BH5-9A.{27}—
SMOKE
BH5-11A.{4}—
INDOOR PUBLIC PLACE
ยงย BH7-4—
General Provisions.
ยงย BH7-5—
Design Requirements.
ยงย BH7-7—
Regulation.
ยงย BH7-8—
Skin Preparation.
ยงย BH7-9—
Technique.
ยงย BH7-10—
Needles.
Watercourses
ยงย 26-102.3—
Establishing the Local Design Flood Elevation (LDFE).
ยงย 26-103.4—
Duties.
ยงย 26-103.11—
Watercourse Alteration.
ยงย 26-103.14—
Department Records.
ยงย 26-105.1—
Information for Development in Flood Hazard Areas.
ยงย 26-105.3—
Analyses and Certifications by Licensed Professional Engineer.
26-201.2{7}—
ALTERATION OF A WATERCOURSE
26-201.2{37}—
FLOODWAY
26-201.2{73}—
WATERCOURSE
ยงย 26-801.7—
Roads and Watercourse Crossings.
ยงย 30-308.3—
Preliminary Plat of Major Subdivision Standards.
ยงย 30-308.5—
Final Plans Accompanying Final Plat.
ยงย 30-309.4—
Preliminary Site Plan Plat Standards.
ยงย 30-604—
STORMWATER MANAGEMENT REQUIREMENTS FOR MAJOR DEVELOPMENT.
Water pollution
Water supply
Web sites
Well
ยงย 26-103.11—
Watercourse Alteration.
26-201.2{31}—
FLOOD INSURANCE STUDY (FIS)
ยงย 30-308.2—
Classification Sketch Plat Standards
ยงย 30-308.3—
Preliminary Plat of Major Subdivision Standards.
ยงย 30-309.5—
Site Plan Information for Preliminary and Final Approval.
30-402{12}—
PERSON
30-502{2}—
ENVIRONMENTAL IMPACT STATEMENT
30-602{21}—
MAJOR DEVELOPMENT
ยงย 30-604—
STORMWATER MANAGEMENT REQUIREMENTS FOR MAJOR DEVELOPMENT.
ยงย 30-610—
MAINTENANCE AND REPAIR.
ยงย 30-702.1—
Roads.
ยงย 30-706.4—
Review of Details.
ยงย 30-709.2—
Recycling Plan to be Included in Applications to Planning Board or Board of Adjustment.
31-301{8}—
AUTOMOBILE AUCTION MARKET
31-301{15}—
CHURCH
ยงย 31-609.4—
Performance Standards.
ยงย 31-714.8—
Overall Comprehensive Plan.
ยงย 31-714.11—
Site Plan Submission and Approval Requirements.
ยงย 31-1101—
CONNECTION OF SUMP PUMPS OR RAINWATER DRAINAGE TO THE SANITARY SEWER SYSTEM IS PROHIBITED.
ยงย 31-1102—
SUMP PUMP INSPECTIONS AND CERTIFICATES.
ยงย 31-1104—
PENALTIES FOR OFFENSES.
ยงย 31-1203.1—
Zoning Permit.
ยงย BH1-3—
Construction.
ยงย BH1-5—
Fee Schedule.
BH4-3A.{4}—
IDENTIFYING MOLDS
BH4-3A.{11}—
REMEDIATION
BH5-9A.{21}—
PERSON
ยงย BH7-10—
Needles.
ยงย BH7-11—
Disposal of Wastes.
ยงย BH7-14—
License Revocation.
Wellhead protection
Wildlife
Wildlife feeding