Index: C
Cable television
ยงย 5-24—
FEES FOR CHAPTER 24: CABLE TELEVISION.
Ch 24—
Cable Television
24-1{1}—
ACT OR CABLE TELEVISION ACT
24-1{7}—
FEDERAL REGULATIONS
24-1{8}—
STANDARD INSTALLATION
24-1{10}—
STATE REGULATIONS
ยงย 24-3—
GRANT OF AUTHORITY.
ยงย 24-8—
EXTENSION OF SERVICE.
ยงย 24-9—
FRANCHISE FEE.
ยงย 24-14—
DESIGNATION OF COMPLAINT OFFICER.
ยงย 24-17—
RATES.
ยงย 24-18—
EMERGENCY USES.
ยงย 24-21—
PUBLIC, EDUCATIONAL, AND GOVERNMENTAL ACCESS.
35-2-2{23}—
CABLE TELEVISION COMPANY
ยงย 35-3-3.6—
Notice Requirements for Hearings.
ยงย DL-1—
DISPOSITION OF ORIGINAL CODE LEGISLATION.
ยงย DL-2—
DISPOSITION OF SUPPLEMENTARY LEGISLATION.
Camping
ยงย 3-9.6—
Lodging in Parked Automobiles.
ยงย 5-2—
FEES FOR CHAPTER 2: ADMINISTRATION.
26-9.2{60}—
RECREATIONAL VEHICLE
35-2-2{133}—
RECREATION CAMP
ยงย 35-5-2—
DESIGNATION OF ZONING DISTRICTS.
ยงย 35-5-14—
RC, RECREATION CAMP.
ยงย 35-5-14.1—
Permitted Principal Uses.
ยงย 35-5-16.4—
Activities in Stream Corridors and Stream Corridor Buffers When There Is No Reasonable or Prudent Alternative.
ยงย 35-15-2.7—
Signs Permitted in the Recreation Camp Zone.
ยงย DL-2—
DISPOSITION OF SUPPLEMENTARY LEGISLATION.
Camps
ยงย 3-9.6—
Lodging in Parked Automobiles.
ยงย 5-2—
FEES FOR CHAPTER 2: ADMINISTRATION.
26-9.2{60}—
RECREATIONAL VEHICLE
35-2-2{133}—
RECREATION CAMP
ยงย 35-5-2—
DESIGNATION OF ZONING DISTRICTS.
ยงย 35-5-14—
RC, RECREATION CAMP.
ยงย 35-5-14.1—
Permitted Principal Uses.
ยงย 35-5-16.4—
Activities in Stream Corridors and Stream Corridor Buffers When There Is No Reasonable or Prudent Alternative.
ยงย 35-15-2.7—
Signs Permitted in the Recreation Camp Zone.
ยงย DL-2—
DISPOSITION OF SUPPLEMENTARY LEGISLATION.
Carbon monoxide
Carbon monoxide alarms
Carbon monoxide detectors
Cemeteries
Certificates of approval
Certificates of compliance
Certificates of insurance
ยงย 3-3.6—
Recreational Facilities and Permits.
ยงย 4-1.9—
Certificate of Insurance Registration.
ยงย 5-14—
FEES FOR CHAPTER 14: BUILDING AND HOUSING.
ยงย 14-10.3—
Certificate of Insurance Registration Required.
ยงย 14-10.4—
Violations and Penalties.
ยงย 20-2.2—
Application for Permit.
ยงย 20-2.9—
Certificate of Insurance.
ยงย 20-2.10—
Newly Paved Public Streets and Highways.
Certificates of occupancy
ยงย 5-14—
FEES FOR CHAPTER 14: BUILDING AND HOUSING.
ยงย 14-4.8—
Numbers to be Assigned Before Issuance of Certificate of Occupancy.
ยงย 14-6.4—
Applicability.
ยงย 14-7—
CONTINUED CERTIFICATE OF OCCUPANCY - BUILDINGS.
ยงย 14-7.4—
Compliance with Millstone Property Maintenance Code; Fees.
ยงย 14-8.2—
Exceptions.
ยงย 15-5.3—
Lot Grading Plan.
ยงย 16-2.3—
Temporary Licenses.
ยงย 16-4—
GENERAL CONDITIONS.
35-2-2{28}—
CERTIFICATE OF OCCUPANCY
ยงย 35-3-6.2—
Records to be Maintained; Monthly Reports.
ยงย 35-3-7.1—
Zoning Permits.
ยงย 35-3-7.3—
Certificates of Occupancy.
ยงย 35-3-7.4—
Notice of Violation.
ยงย 35-3-9.3—
Escrow Fees.
ยงย 35-4-1.1—
General.
ยงย 35-4-11.1—
General Requirements.
ยงย 35-8-5—
PHASING SCHEDULE FOR INCLUSIONARY ZONING.
ยงย 35-8-9—
CONTROL PERIODS FOR RESTRICTED OWNERSHIP UNITS AND ENFORCEMENT MECHANISMS.
ยงย 35-8-14—
CONTROL PERIODS FOR RESTRICTED RENTAL UNITS.
ยงย 35-8-19—
ADMINISTRATIVE AGENT.
ยงย 35-8-22.4—
Nonresidential Development Fees.
ยงย 35-8-22.5—
Collection Procedures.
ยงย 35-11-13.3—
Conservation Easement Monumentation.
ยงย 35-11-13.5—
Horse Trail Easements.
ยงย 35-11-14.12—
Installation and Inspection of Landscaping.
ยงย 35-11-19—
STREET LIGHTING.
ยงย 35-13-2.1—
Amount of Performance Guarantee.
ยงย DL-2—
DISPOSITION OF SUPPLEMENTARY LEGISLATION.
Certificates of registration
Cesspools
Charges
ยงย 2-16.3—
Township Prosecutor.
ยงย 2-17.5—
Term.
ยงย 2-20.1—
Department of Public Works, Creation; Superintendent of Public Works in Charge.
ยงย 2-27.5—
Powers and Duties.
ยงย 2-28.9—
Removal of Members.
ยงย 2-30.6—
Costs.
ยงย 2-30.9—
Disposition of Monies Collected.
ยงย 2-39.8—
Submission of Bill List to Township Committee.
ยงย 2-40—
PAYMENT OF CLAIMS FOR FIRE DAMAGE PROHIBITED UNLESS TAXES AND LIENS ARE PAID.
ยงย 2-42.4—
Smoking Regulation in Parks and Recreation Areas, Posting.
ยงย 2-45—
PAYMENT TO TOWNSHIP.
ยงย 2-46.3—
Benefits.
ยงย 2-48.2—
Extraordinary Copying Charge.
ยงย 2-53.5—
Township Requirements.
ยงย 3-1.9—
Distributing Handbills in Public Places.
ยงย 3-1.10—
Handbills on Vehicles.
ยงย 3-3.6—
Recreational Facilities and Permits.
ยงย 3-4.5—
Lien for Costs.
ยงย 3-4A.3—
Removal by Township, Costs Established as a Lien.
ยงย 3-7.2—
Investigation; Enforcement; Penalties.
ยงย 3-14.3—
Possession; Consumption of Alcoholic Beverages by Person Under Legal Age on Private Property; Penalty.
ยงย 3-17.6—
Employee or Volunteer May Challenge Accuracy of Report.
ยงย 3-21.5—
Permit Application.
ยงย 3-21.9—
Duties of Applicant.
ยงย 3-26—
MANUFACTURING, SELLING, TRANSPORTING OR USING FIREWORKS.
ยงย 4-3.1—
License Required; Fee.
ยงย 4-4.1—
Special Permit Required.
ยงย 4-4.2—
Application; Provisions for Granting Special Permits.
ยงย 4-5.15—
Hearing, Determination.
ยงย 4-6.3—
Application for Permit.
ยงย 4-6.4—
Approval or Disapproval of Application.
ยงย 5-1.1—
Purpose.
ยงย 5-2—
FEES FOR CHAPTER 2: ADMINISTRATION.
ยงย 5-4—
FEES FOR CHAPTER 4: GENERAL LICENSING.
ยงย 5-9—
FEES FOR CHAPTER 9: ANIMAL CONTROL.
ยงย 5-13.1—
Emergency Medical Services Fees.
ยงย 5-14—
FEES FOR CHAPTER 14: BUILDING AND HOUSING.
ยงย 5-22—
FEES FOR CHAPTER 22: MINING AND QUARRYING.
ยงย 5-23—
FEES FOR CHAPTER 23: SOIL REMOVAL AND IMPORT.
ยงย 5-28—
FEES FOR FARMER'S MARKET.
ยงย 5-35—
FEES FOR APPLICATIONS AND PROCEDURES PURSUANT TO LAND USE AND DEVELOPMENT REGULATIONS OF THE TOWNSHIP OF MILLSTONE.
ยงย 5-37—
MISCELLANEOUS FEES.
ยงย 6-6—
REVOCATION OF LICENSE.
ยงย 7-3.7—
Parking Prohibited on Snow Covered Streets.
ยงย 8-6—
PERMIT.
ยงย 9-1.2—
Registration and Licensing.
ยงย 9-2.1—
Definitions.
ยงย 9-2.3—
License Fees.
ยงย 9-2.8—
Violations and Penalties.
10-6.1{2}—
REVIEW COMMITTEE
ยงย 13-3.7—
Non-Life Hazard Uses.
ยงย 14-1.4A—
Waiver of Construction Fees.
ยงย 14-2.3—
Inspections of Premises and Dwellings.
14-3.1{4}—
PUBLIC AUTHORITY
ยงย 14-3.3—
Filing of Petitions; Hearing Upon Complaints.
ยงย 14-3.7—
Costs and Charges Incurred by Township.
ยงย 14-4.9—
Affixing of Numbers by Township; Costs.
ยงย 14-7.4—
Compliance with Millstone Property Maintenance Code; Fees.
ยงย 20-2.6—
Construction and Restoration of Surface.
ยงย 20-2.10—
Newly Paved Public Streets and Highways.
ยงย 22-7—
MINING REGULATIONS.
ยงย 23-5—
SOIL REMOVAL REGULATIONS.
ยงย 24-9—
FRANCHISE FEE.
ยงย 24-10—
FREE SERVICE.
ยงย 26-3.16—
Liability.
26-9.2{20}—
CONDITIONAL LETTER OF MAP REVISION
26-9.2{21}—
CONDITIONAL LETTER OF MAP REVISION - FILL
35-2-2{71}—
HOMEOWNERS' ASSOCIATION
35-2-2{95}—
MOBILE HOME PARK
ยงย 35-3-3.3—
Minutes.
ยงย 35-3-3.5—
Hearings.
ยงย 35-3-3.6—
Notice Requirements for Hearings.
ยงย 35-3-3.7—
Decisions by Planning Board and Board of Adjustment.
ยงย 35-3-5.3—
Notice of Hearings on Amendments to Land Use and Development Regulations.
ยงย 35-3-9.3—
Escrow Fees.
ยงย 35-4-9.8—
Wind, Solar or Photovoltaic Energy Facilities.
ยงย 35-4-9.9—
Private Swimming Pools.
35-8-1{36}—
RENT
ยงย 35-8-15—
RENT RESTRICTIONS FOR RENTAL UNITS; LEASES.
ยงย 35-8-19—
ADMINISTRATIVE AGENT.
ยงย 35-13-4—
DEVELOPERS AGREEMENT.
ยงย 35-14-3.1—
Powers and Duties.
ยงย 35-16-1.4—
Violations and Penalties.
Chief Financial Officer
ยงย 2-2.6—
Duties and Responsibilities.
ยงย 2-17.1—
Purpose.
ยงย 2-17.2—
Chief Financial Officer.
ยงย 2-17.3—
Duties.
ยงย 2-17.4—
Requirements.
ยงย 2-17.5—
Term.
ยงย 2-17.6—
Vacancies.
ยงย 2-17.7—
Tenure.
ยงย 2-39.3—
Chief Financial Officer Designated As Approval Officer.
ยงย 2-39.7—
Certification by Chief Financial Officer.
ยงย 2-39.9—
Approval of Claims Between Meeting of the Township Committee.
ยงย 2-39.10—
Exceptions.
ยงย 2-39.12—
Approval of Payment Indicated on Claims.
ยงย 2-51—
RETIREMENT PLAN ELIGIBILITY OF POSITIONS.
ยงย 2-53.5—
Township Requirements.
ยงย 2-53.7—
Establishment of Service.
ยงย 5-22—
FEES FOR CHAPTER 22: MINING AND QUARRYING.
ยงย 5-23—
FEES FOR CHAPTER 23: SOIL REMOVAL AND IMPORT.
ยงย 35-3-9.3—
Escrow Fees.
ยงย 35-8-22.6—
Affordable Housing Trust Fund.
ยงย 35-11-25.9—
Fees.
ยงย DL-1—
DISPOSITION OF ORIGINAL CODE LEGISLATION.
Churches
ยงย 4-3.9—
Location Near Residences Restricted.
4-6.1{3}—
PERSON OR ORGANIZATION
ยงย 5-14—
FEES FOR CHAPTER 14: BUILDING AND HOUSING.
ยงย 13-4.3—
Applicability.
ยงย 22-7—
MINING REGULATIONS.
ยงย 23-5—
SOIL REMOVAL REGULATIONS.
ยงย 35-4-5.2—
Height Regulation Exceptions.
ยงย 35-5-10.3—
Conditional Uses.
ยงย 35-6-2.4—
Gasoline Service Stations.
ยงย 35-6-2.7—
Quasi-Public Use.
ยงย 35-6-3.6—
Locations Where Wireless Communication Antennas May Be Located.
ยงย 35-7-3.5—
Number of Required Spaces.
Civil union certificates
Cluster developments
Code Enforcement Officer
ยงย 2-8—
CODE ENFORCEMENT OFFICER.
ยงย 2-8.1—
Creation.
ยงย 2-8.2—
Appointment.
ยงย 2-8.3—
Powers and Duties.
ยงย 2-8.4—
Qualifications.
ยงย 3-7.2—
Investigation; Enforcement; Penalties.
ยงย 3-7.3—
Responsibility.
ยงย 3-13.3—
Annual Inspections.
ยงย 3-27.3—
Proof of Certification.
ยงย 8-4—
STANDARDS FOR PARKING SPACES.
ยงย 14-4.10—
Violations and Penalties.
ยงย 19-1.9—
Enforcement.
26-9.2{67}—
SUBSTANTIAL IMPROVEMENT
ยงย 35-4-14A.5—
Enforcement.
ยงย 35-11-13.2—
Conservation Easements.
ยงย 35-11-13.7—
Permits Required.
ยงย 35-11-25.13—
Enforcement.
ยงย 35-16-1.3—
Enforcement.
ยงย 35-16-2.3—
Enforcement.
ยงย 35-16-3.4—
Enforcement.
ยงย 35-16-4.3—
Enforcement.
ยงย 35-16-5.4—
Enforcement.
ยงย 35-16-6.3—
Enforcement.
ยงย 35-16-7.4—
Enforcement.
ยงย 35-16-8.4—
Enforcement.
ยงย 35-17-1.7—
Enforcement and Penalties.
ยงย DL-2—
DISPOSITION OF SUPPLEMENTARY LEGISLATION.
Combustibles
Commercial vehicles
Compensation
Ch 2—
Administration
ยงย 2-2.3—
Compensation.
ยงย 2-8.2—
Appointment.
ยงย 2-9.2—
Appointment.
ยงย 2-16.1—
Township Attorney.
ยงย 2-16.3—
Township Prosecutor.
ยงย 2-25.5—
Compensation.
ยงย 2-25.7—
Court Administrator, Deputy Administrator.
ยงย 2-26.2—
Terms; Compensation.
ยงย 2-26.3—
Organization of the Board; Director of Welfare; Employees.
ยงย 2-27.2—
Appointment of Members; Terms; Vacancies.
ยงย 2-28.2—
Members Appointed; Terms of Office; Compensation.
ยงย 2-28.2A—
Alternate Members; Terms of Office; Compensation.
ยงย 2-29.2—
Organization, Membership, Terms.
ยงย 2-29.2A—
Alternate Members: Terms of Office; Compensation.
ยงย 2-30.1—
Creation; Composition.
ยงย 2-30.4—
Election of Officers.
ยงย 2-31.2—
Appointment of Members; Terms; Vacancies.
ยงย 2-32.2—
Organization, Membership, Terms.
ยงย 2-33.2—
Appointment of Members; Terms; Vacancies.
ยงย 2-33.2A—
Alternate Members: Terms of Office; Compensation.
ยงย 2-34.2—
Appointment of Members; Terms; Vacancies.
ยงย 2-34.2A—
Alternate Members: Terms of Office; Compensation.
ยงย 2-35.2—
Appointment; Compensation; Term.
ยงย 2-38.2—
Appointment of Members; Terms; Vacancies.
ยงย 2-38.2A—
Alternate Members; Terms of Office; Compensation.
ยงย 2-44.1—
Establishment; Terms; Powers and Duties.
ยงย 2-46.1—
Purpose.
ยงย 2-52.1—
Appointment; Deputy Registrar.
ยงย 3-21.6—
Action on the Application.
ยงย 3-21.8—
Denial of the Permit.
ยงย 10-6.2—
Requests for Criminal Background Checks; Costs.
ยงย 20-2.4—
Fees.
26-9.2{38}—
FREEBOARD
ยงย 35-3-1.6—
Attorney.
ยงย 35-3-2.3—
Attorney.
ยงย 35-3-2.4—
Experts and Staff.
ยงย 35-9-2.4—
Contribution Disclosure Ordinance.
ยงย 35-14-2.2—
Staff, Experts, Counsel, Expenses and Costs.
ยงย 35-17-1.5—
Exceptions.
Comprehensive Plan
Conditional uses
35-2-2{10}—
APPLICATION FOR DEVELOPMENT
35-2-2{29}—
CHANGE IN USE
35-2-2{36}—
CONDITIONAL USE
ยงย 35-3-1.8—
Powers and Duties Generally.
ยงย 35-3-1.9—
Conditional Uses.
ยงย 35-3-1.11—
Procedure for Filing Applications.
ยงย 35-3-2.9—
Expiration of Variance.
ยงย 35-3-2.10—
Powers Granted by Law.
ยงย 35-3-2.11—
Additional Powers.
ยงย 35-3-7.2—
Conditional Use Permits.
ยงย 35-3-9.4—
Fee Schedule.
ยงย 35-5-4—
ZONING BOUNDARY DESIGNATIONS.
ยงย 35-5-6.3—
Conditional Uses.
ยงย 35-5-6A.3—
Conditional Uses.
ยงย 35-5-6B.3—
Conditional Uses.
ยงย 35-5-7.3—
Conditional Uses.
ยงย 35-5-8.3—
Conditional Uses.
ยงย 35-5-9.3—
Conditional Uses.
ยงย 35-5-10.3—
Conditional Uses.
ยงย 35-5-11.3—
Conditional Uses.
ยงย 35-5-12.3—
Conditional Uses.
ยงย 35-5-13.3—
Conditional Uses.
ยงย 35-5-15.3—
Conditional Uses.
ยงย 35-5-16.1—
Applicability.
Ch 35 Art 6—
Conditional Uses
ยงย 35-6-1—
CONDITIONAL USES - AUTHORIZATION AND PROCEDURE.
ยงย 35-6-1.1—
Applications.
ยงย 35-6-1.2—
Planning Board Review; Required Findings of Fact.
ยงย 35-6-1.3—
Additional Requirements; Time Limit.
ยงย 35-6-1.4—
Required Public Hearing; Time Period for Decision.
ยงย 35-6-1.5—
Special Requirements.
ยงย 35-6-2—
CONDITIONAL USES.
ยงย 35-6-2.4—
Gasoline Service Stations.
ยงย 35-6-2.11—
Restaurants.
ยงย 35-6-3.9—
Requirements for Substantial Changes to First Priority Locations.
ยงย 35-6-3.10—
Requirements for Second Priority Locations.
ยงย 35-9-1A—
SITE PLAN REQUIRED.
ยงย DL-2—
DISPOSITION OF SUPPLEMENTARY LEGISLATION.
Confidentiality
Conflicts of interest
Conservation districts
ยงย 22-7—
MINING REGULATIONS.
ยงย 23-5—
SOIL REMOVAL REGULATIONS.
35-2-2{57}—
EROSION AND SEDIMENT CONTROL PLAN
35-2-2{151}—
SOIL CONSERVATION DISTRICT
ยงย 35-4-14.4—
Stormwater Management Requirements for Major Development.
ยงย 35-4-14.5—
Calculation of Stormwater Runoff and Groundwater Recharge.
ยงย 35-11-16—
SOIL EROSION AND SEDIMENTATION CONTROL.
ยงย 35-11-18.1—
Removal of Topsoil.
ยงย 35-11-18.2—
Storage of Topsoil.
35-17-1.2{1}—
ACID PRODUCING SOIL
Construction
1-2{17}—
STREET
ยงย 1-3—
CONSTRUCTION.
ยงย 2-8.4—
Qualifications.
ยงย 2-30.7—
Interference with or Injuring Shade Trees; Authority of Other Commissions.
ยงย 2-51—
RETIREMENT PLAN ELIGIBILITY OF POSITIONS.
ยงย 3-3.5—
Prohibited Uses of Parks, Trails, Facilities and/or Lands Owned by the Township.
ยงย 3-3.6—
Recreational Facilities and Permits.
ยงย 3-3.9—
Equestrian Rules and Regulations.
3-12.1{1}—
CONSTRUCTION
ยงย 3-12.6—
Restricted Uses and Activities.
ยงย 3-13.3—
Annual Inspections.
ยงย 3-24.3—
Prohibited Conduct.
ยงย 4-3.8—
Location Near Highways Restricted.
ยงย 4-7.4—
Applicability.
ยงย 5-14—
FEES FOR CHAPTER 14: BUILDING AND HOUSING.
ยงย 5-15—
FEES FOR CHAPTER 15: SWIMMING POOLS.
ยงย 5-16—
FEES FOR CHAPTER 16: TRAILERS AND MOBILE HOMES.
ยงย 8-3—
APPLICABILITY.
ยงย 8-4—
STANDARDS FOR PARKING SPACES.
ยงย 13-3.10—
Board of Appeals.
ยงย 13-4.4—
Exemptions.
ยงย 14-1—
STATE UNIFORM CONSTRUCTION CODE.
ยงย 14-1.1—
Code Established.
ยงย 14-1.2—
Enforcing Agency.
ยงย 14-1.3—
Appeals.
ยงย 14-1.4A—
Waiver of Construction Fees.
ยงย 14-1.5—
Reports to Mayor and Township Committee.
ยงย 14-1.6—
Surcharge Fees.
ยงย 14-1.7—
Fire Limits.
ยงย 14-3.2—
Enforcement Officer.
ยงย 14-3.3—
Filing of Petitions; Hearing Upon Complaints.
ยงย 14-3.4—
Determination of Unfit Building; Service of Orders of Abatement.
ยงย 14-3.5—
Failure to Comply With Orders to Alter or Vacate.
ยงย 14-3.6—
Failure to Comply With Orders to Remove or Demolish.
ยงย 14-3.7—
Costs and Charges Incurred by Township.
ยงย 14-3.8—
Conditions Constituting Unfit Buildings.
ยงย 14-3.9—
Complaints and Orders; Manner of Service.
ยงย 14-3.10—
Optional Powers for Immediate Danger to Life.
ยงย 14-3.11—
Enforcement; Powers and Authority of Construction Official.
ยงย 14-4.7—
Application for Assignment of Numbers.
ยงย 14-4.8—
Numbers to be Assigned Before Issuance of Certificate of Occupancy.
ยงย 14-5.3—
Applicability, Necessity to Secure Certificate of Inspection.
ยงย 14-5.4—
Application Procedure.
ยงย 14-5.5—
Inspections.
ยงย 14-5.6—
Issuance of Certificate of Inspection.
ยงย 14-5.7—
Duration of Inspection.
ยงย 14-5.9—
Minor Violations.
ยงย 14-5.10—
Waiver of Requirements.
ยงย 14-7.4—
Compliance with Millstone Property Maintenance Code; Fees.
ยงย 14-8—
CONSTRUCTION RECORDS CLOSURE (CRC).
ยงย 14-8.1—
When Required.
ยงย 14-8.2—
Exceptions.
ยงย 14-8.4—
Pre-Occupancy Records Inspection.
ยงย 14-10.1—
Landlord Identity Statement Required.
15-1{1}—
CONSTRUCTION
15-1{4}—
PRIVATE SWIMMING POOL
15-1{5}—
WADING POOL
ยงย 15-2.1—
Permit Required.
ยงย 15-2.2—
Application for Permit.
ยงย 15-2.3—
Fee.
ยงย 15-3.1—
Requirements.
ยงย 15-5—
CONSTRUCTION AND MAINTENANCE; ELECTRICAL CONNECTIONS.
ยงย 15-5.1—
Materials.
ยงย 15-5.3—
Lot Grading Plan.
ยงย 15-7—
MISCELLANEOUS PROVISIONS.
ยงย 16-2.1—
License Required.
ยงย 16-2.3—
Temporary Licenses.
ยงย 16-3—
PERMITTED USES.
ยงย 16-4—
GENERAL CONDITIONS.
19-1.2{2}—
CLEAN MIXED PAPER
ยงย 19-1.6—
Provision and Labeling of Recycling Containers.
ยงย 19-1.7—
Debris Management Plan for Construction Permits.
ยงย 19-1.8—
Appointment and Duties of Recycling Coordinator.
19-2.1{8}—
SOLID WASTE FACILITIES
ยงย 20-2.6—
Construction and Restoration of Surface.
ยงย 20-5.1—
Construction Requirements.
21-3.2{6}—
VEHICLE
ยงย 22-7—
MINING REGULATIONS.
ยงย 22-9.2—
Exceptions.
23-2{1}—
DEVELOPER
ยงย 23-5—
SOIL REMOVAL REGULATIONS.
ยงย 23-8—
VIOLATIONS AND PENALTIES.
ยงย 24-2—
STATEMENT OF FINDINGS.
ยงย 24-3—
GRANT OF AUTHORITY.
ยงย 24-8—
EXTENSION OF SERVICE.
ยงย 24-11—
CONSTRUCTION/SYSTEM REQUIREMENTS.
ยงย 24-20—
REMOVAL OF FACILITIES.
ยงย 26-1.1—
Title.
ยงย 26-1.2—
Scope.
ยงย 26-1.3—
Purposes and Objectives.
ยงย 26-1.4—
Coordination with Building Codes.
ยงย 26-1.5—
Ordinary Building Maintenance and Minor Work.
ยงย 26-1.8—
Violations and Penalties for Noncompliance.
ยงย 26-2.1—
General.
ยงย 26-3.3—
Coordination.
ยงย 26-3.4—
Duties.
ยงย 26-3.7—
Determination of Local Design Flood Elevations.
ยงย 26-3.9—
Activities in Riverine Flood Hazard Areas.
ยงย 26-3.10—
Floodway Encroachment.
ยงย 26-3.14—
Substantial Improvement and Substantial Damage Determination.
ยงย 26-3.15—
Department Records.
ยงย 26-4.2—
Application for Permit.
ยงย 26-4.3—
Validity of Permit.
ยงย 26-5—
SITE PLANS AND CONSTRUCTION DOCUMENTS.
ยงย 26-5.1—
Information for Development in Flood Hazard Areas.
ยงย 26-5.3—
Analyses and Certifications by a Licensed Professional Engineer.
ยงย 26-6.3—
Buildings and Structures.
ยงย 26-7.1—
General.
ยงย 26-7.3—
Functionally Dependent Uses.
ยงย 26-7.6—
Conditions for Issuance.
ยงย 26-8.2—
Authority.
ยงย 26-9.1—
General.
26-9.2{5}—
AGRICULTURAL STRUCTURE
26-9.2{11}—
ASCE 24
26-9.2{18}—
BREAKAWAY WALLS
26-9.2{20}—
CONDITIONAL LETTER OF MAP REVISION
26-9.2{21}—
CONDITIONAL LETTER OF MAP REVISION - FILL
26-9.2{36}—
FLOODPROOFING CERTIFICATE
26-9.2{40}—
HABITABLE BUILDING
26-9.2{42}—
HIGHEST ADJACENT GRADE
26-9.2{51}—
LOCAL DESIGN FLOOD ELEVATION (LDFE)
26-9.2{54}—
MANUFACTURED HOME
26-9.2{56}—
MARKET VALUE
26-9.2{57}—
NEW CONSTRUCTION
26-9.2{59}—
ORDINARY MAINTENANCE AND MINOR WORK
26-9.2{64}—
START OF CONSTRUCTION
26-9.2{67}—
SUBSTANTIAL IMPROVEMENT
26-9.2{70}—
VARIANCE
26-9.2{74}—
WET FLOODPROOFING
ยงย 26-10.1—
General.
ยงย 26-12.1—
General.
ยงย 26-12.6—
Protection of Mechanical Equipment and Outside Appliances.
ยงย 26-14.1—
Tanks.
ยงย 26-15.1—
General Requirements for other Development and Building Work.
ยงย 26-15.2—
Requirements for Habitable Buildings and Structures.
ยงย 26-15.3—
Garages and Accessory Storage Structures.
ยงย 26-15.4—
Fences.
ยงย 26-15.6—
Swimming Pools.
ยงย 26-15.7—
Roads and Watercourse Crossings.
ยงย 26-17.4—
Enclosures Below Base Flood Elevation.
ยงย 26-17.6—
Protection of Mechanical, Plumbing, and Electrical Systems.
ยงย 35-1-2—
INTENT AND PURPOSE.
ยงย 35-1-3.3—
Settlement Unaffected.
ยงย 35-1-5.1—
Violations.
35-2-2{16}—
BUILDING
35-2-2{24}—
CAPITAL IMPROVEMENT
35-2-2{28}—
CERTIFICATE OF OCCUPANCY
35-2-2{44}—
DEVELOPMENT
35-2-2{46}—
DRAINAGE
35-2-2{93}—
MINOR SITE PLAN
35-2-2{99}—
MUNICIPALLY SPONSORED AFFORDABLE HOUSING CONSTRUCTION
35-2-2{116}—
PERCOLATION (PERC) TEST
35-2-2{164}—
STRUCTURE
35-2-2{168}—
SWIMMING POOL
35-2-2{173}—
USABLE DEVELOPMENT AREA
35-2-2{181}—
ZONING PERMIT
ยงย 35-3-2.6—
Powers.
ยงย 35-3-2.9—
Expiration of Variance.
ยงย 35-3-6.1—
Enforcement.
ยงย 35-3-7.1—
Zoning Permits.
ยงย 35-3-7.3—
Certificates of Occupancy.
ยงย 35-3-9.3—
Escrow Fees.
ยงย 35-4-1.6—
Permitted Uses, All Zones.
ยงย 35-4-2.1—
Nonconforming Structures and Undersized Developed Lots.
ยงย 35-4-2.2—
Undersized Vacant Lots.
ยงย 35-4-2.3—
Merger of Undersized Lots.
ยงย 35-4-2.4—
Exemption from Dedication of Land to Township.
ยงย 35-4-4.7—
Lot Area Requirements.
ยงย 35-4-8.1—
Continuation of Existing Use; Prohibitions.
ยงย 35-4-8.4—
Restoration.
ยงย 35-4-9.3—
Height Restrictions.
ยงย 35-4-9.7—
Radio Antenna.
ยงย 35-4-9.8—
Wind, Solar or Photovoltaic Energy Facilities.
35-4-9.8b{5}—
SMALL WIND ENERGY SYSTEM
ยงย 35-4-9.10—
Subsurface Sewage Disposal Systems.
ยงย 35-4-9.12—
Fences.
ยงย 35-4-11.2—
Fire and Explosive Hazards.
ยงย 35-4-12.1—
Exterior Design and Appearance.
35-4-14.2{3}—
COMMUNITY BASIN
35-4-14.2{11}—
DEVELOPMENT
35-4-14.2{32}—
POLLUTANT
35-4-14.2{34}—
REGULATED IMPERVIOUS SURFACE
35-4-14.2{42}—
STORMWATER MANAGEMENT BASIN
ยงย 35-4-14.4—
Stormwater Management Requirements for Major Development.
ยงย 35-4-14.8—
Safety Standards for Stormwater Management Basins.
ยงย 35-4-14.9—
Requirements for a Site Development Stormwater Plan.
ยงย 35-4-14.11—
Penalties.
ยงย 35-4-15.3—
Recreational Facilities Required.
ยงย 35-4-16.1—
Applicability.
ยงย 35-4-16.2—
Purpose and Intent.
ยงย 35-4-16.3—
General Building Design Standards.
ยงย 35-4-16.4—
Building Facade Materials.
ยงย 35-4-16.6—
Roof Configurations and Materials.
ยงย 35-4-16.7—
Building Design Standards for Facade Signage.
ยงย 35-5-5.2—
Schedule Exceptions.
ยงย 35-5-6A.6—
Farmland/Open Space Conservation Clusters in the RU-P District.
ยงย 35-5-6B.6—
Farmland/Open Space Conservation Clusters in the RU-C District.
ยงย 35-5-7.7—
Municipally Sponsored Affordable Housing.
ยงย 35-5-12.5—
Other Provisions and Requirements.
ยงย 35-5-13.4—
Schedule of Area, Yard and Building Requirements.
ยงย 35-5-15.6—
Other Provisions and Requirements.
ยงย 35-5-16.2—
Permitted Activities.
ยงย 35-5-16.6—
Provisions Governing Activities in Stream Corridors and Stream Corridor Buffers.
ยงย 35-5-17—
ACCESSORY APARTMENTS.
ยงย 35-5-18—
R-MF MULTI-FAMILY ZONE DISTRICT.
ยงย 35-5-18.1—
Permitted Principal and Accessory Uses.
ยงย 35-5-18.2—
Inclusionary Development.
ยงย 35-6-2.4—
Gasoline Service Stations.
ยงย 35-6-3.2—
Overall Purposes.
ยงย 35-6-3.7—
Modifications Constituting a Substantial Change.
ยงย 35-6-3.8—
Applications for Modifications That Do Not Substantially Change First Priority Locations.
ยงย 35-6-3.9—
Requirements for Substantial Changes to First Priority Locations.
ยงย 35-6-3.18—
Application for "Use" Variances to the Zoning Board.
ยงย 35-7-2.4—
Curbing; When Required.
35-8-1{2}—
ADAPTABLE
35-8-1{7}—
AFFORDABLE HOUSING DEVELOPMENT
35-8-1{16}—
CONSTRUCTION OFFICIAL
35-8-1{20}—
DEVELOPMENT
35-8-1{24}—
INCLUSIONARY DEVELOPMENT
ยงย 35-8-6—
NEW CONSTRUCTION.
ยงย 35-8-9—
CONTROL PERIODS FOR RESTRICTED OWNERSHIP UNITS AND ENFORCEMENT MECHANISMS.
ยงย 35-8-14—
CONTROL PERIODS FOR RESTRICTED RENTAL UNITS.
ยงย 35-8-18—
MUNICIPAL HOUSING LIAISON.
ยงย 35-8-22.3—
Residential Development Fees.
ยงย 35-8-22.4—
Nonresidential Development Fees.
ยงย 35-8-22.5—
Collection Procedures.
ยงย 35-8-22.6—
Affordable Housing Trust Fund.
ยงย 35-8-22.7—
Use of Funds.
ยงย 35-8-22.8—
Monitoring.
ยงย 35-9-1A—
SITE PLAN REQUIRED.
ยงย 35-9-2.2—
Submission Procedures.
ยงย 35-9-3—
STATEMENT OF ENVIRONMENTAL IMPACT AND ASSESSMENT STATEMENT (SEIA).
ยงย 35-9-3.3—
Information and Documentation Required for a SEIA.
ยงย 35-9-3.4—
Conditions of the Statement of Environmental Impact and Assessment (SEIA).
ยงย 35-9-3.5—
Standards For Analysis Review and Approval by Review Agencies.
ยงย 35-9-4.11—
Timing Schedule.
ยงย 35-9-5.1—
Modifications in Certain Areas.
ยงย 35-10-1.4—
Developers Agreement Required.
ยงย 35-10-2.2—
Streets.
ยงย 35-10-2.3—
Storm Drains.
ยงย 35-10-2.7—
Topsoil.
ยงย 35-10-3—
IMPROVEMENTS TO BE IN ACCORDANCE WITH TOWNSHIP STANDARDS.
Ch 35 Art 11—
Design and Performance Standards and Construction Specifications
ยงย 35-11-3.13—
Street Crowns.
ยงย 35-11-3.15—
Street Design Standards.
ยงย 35-11-4.16—
Alignment.
ยงย 35-11-4.23—
General Drainage Requirements.
ยงย 35-11-6.2—
Collars.
ยงย 35-11-6.4—
Construction of Outlet Structures.
ยงย 35-11-8.6—
Safety Ledges.
ยงย 35-11-8.10—
Top of Bank Location.
ยงย 35-11-8.11—
Landscaping.
ยงย 35-11-11.3—
Facilities Owned by the Township.
ยงย 35-11-12.1—
Purposes.
ยงย 35-11-12.3—
Lots Containing a Floodway Portion of a Drainage Course.
ยงย 35-11-12.4—
Lots Containing Flood Fringes.
ยงย 35-11-12.5—
Procedures for Review.
ยงย 35-11-12.8—
Drainage Right-of-Way Easements.
ยงย 35-11-13.2—
Conservation Easements.
ยงย 35-11-13.6—
Prohibited Activities.
ยงย 35-11-14.2—
General Design Principles.
ยงย 35-11-14.3—
Street Trees.
ยงย 35-11-14.4—
Cul-De-Sacs and Traffic Control Islands.
ยงย 35-11-14.5—
Stormwater Management Areas.
ยงย 35-11-14.6—
Open Space.
ยงย 35-11-14.7—
Buffers.
ยงย 35-11-15.5—
Fill Encroachment.
ยงย 35-11-15.6—
Protection Against Erosion Required,
ยงย 35-11-15.9—
Stabilization During Construction.
ยงย 35-11-15.10—
Cover of Slopes and Embankments After Construction.
ยงย 35-11-15.11—
Channels, Swales, Ditches or Watercourses.
ยงย 35-11-15.12—
Preservation of Existing Natural Features.
ยงย 35-11-16.3—
Natural Vegetation.
ยงย 35-11-16.14—
Blocking or Impeding Flow.
ยงย 35-11-18.2—
Storage of Topsoil.
ยงย 35-11-18.3—
Redistribution of Topsoil.
ยงย 35-11-18.4—
Topsoil Removal.
ยงย 35-11-18.5—
Importing Topsoil.
ยงย 35-11-22.1—
Water, Wells, Sewage Disposal Facilities.
ยงย 35-11-24.4—
Maintenance as Open Space.
ยงย 35-11-25.5—
Tree Preservation and Removal Plan.
ยงย 35-11-25.12—
Other Prohibited Acts.
ยงย 35-11-28.1—
Deterioration and Service of Notice of Violation.
ยงย 35-11-28.2—
Request for Hearing by Property Owner.
ยงย 35-11-28.3—
Violation Abatement by Municipality.
ยงย 35-11-33.4—
Protective Measures.
ยงย 35-11-33.5—
Time Period for Construction.
ยงย 35-12-1—
IMPROVEMENTS TO BE CONSTRUCTED AT SOLE EXPENSE OF SUBDIVIDER.
ยงย 35-12-2.1—
Off-Site Improvements.
ยงย 35-12-2.2—
Recommendation of Township Committee.
ยงย 35-12-2.3—
Action on Improvements by the Township Committee.
ยงย 35-12-2.4—
Obligations of the Subdivider or Developer.
ยงย 35-12-2.5—
Estimation of Special Assessment.
ยงย 35-12-4—
REFUND OF DEPOSIT WHERE IMPROVEMENTS ARE NOT AUTHORIZED WITHIN FIVE YEARS.
ยงย 35-13-2.1—
Amount of Performance Guarantee.
ยงย 35-13-2.2—
Posting of Performance Guarantee.
ยงย 35-13-3—
INSPECTIONS.
ยงย 35-13-4—
DEVELOPERS AGREEMENT.
ยงย 35-14-1.2—
Membership.
ยงย 35-14-3.1—
Powers and Duties.
35-14-4{1}—
ADDITION
35-14-4{10}—
IMPROVEMENT
ยงย 35-14-5.1—
Referrals to Historic Preservation Commission.
ยงย 35-14-5.2—
Submission Requirements.
ยงย 35-14-5.4—
Demolitions.
ยงย 35-14-5.6—
Advice Regarding Non-Historic Properties.
ยงย 35-15-2.2—
Signs Permitted in a Residential Zone.
ยงย 35-15-4.2—
Application.
ยงย 35-15-5.1—
Construction of Freestanding Signs.
ยงย 35-15-5.2—
Construction of Signs Erected Flat Against Buildings.
ยงย 35-15-5.4—
Illumination.
ยงย 35-16-4.1—
Definitions.
35-17-1.2{2}—
APPLICANT
ยงย 35-17-1.3—
Establishment and Protection of Riparian Zones.
ยงย DL-1—
DISPOSITION OF ORIGINAL CODE LEGISLATION.
ยงย DL-2—
DISPOSITION OF SUPPLEMENTARY LEGISLATION.
Construction Official
ยงย 5-14—
FEES FOR CHAPTER 14: BUILDING AND HOUSING.
ยงย 8-3—
APPLICABILITY.
ยงย 8-4—
STANDARDS FOR PARKING SPACES.
ยงย 14-1.1—
Code Established.
ยงย 14-1.2—
Enforcing Agency.
ยงย 14-1.5—
Reports to Mayor and Township Committee.
ยงย 14-1.7—
Fire Limits.
ยงย 14-3.2—
Enforcement Officer.
ยงย 14-3.3—
Filing of Petitions; Hearing Upon Complaints.
ยงย 14-3.4—
Determination of Unfit Building; Service of Orders of Abatement.
ยงย 14-3.5—
Failure to Comply With Orders to Alter or Vacate.
ยงย 14-3.6—
Failure to Comply With Orders to Remove or Demolish.
ยงย 14-3.7—
Costs and Charges Incurred by Township.
ยงย 14-3.8—
Conditions Constituting Unfit Buildings.
ยงย 14-3.9—
Complaints and Orders; Manner of Service.
ยงย 14-3.10—
Optional Powers for Immediate Danger to Life.
ยงย 14-3.11—
Enforcement; Powers and Authority of Construction Official.
ยงย 14-4.8—
Numbers to be Assigned Before Issuance of Certificate of Occupancy.
ยงย 14-5.3—
Applicability, Necessity to Secure Certificate of Inspection.
ยงย 14-5.4—
Application Procedure.
ยงย 14-5.5—
Inspections.
ยงย 14-5.6—
Issuance of Certificate of Inspection.
ยงย 14-5.7—
Duration of Inspection.
ยงย 14-5.9—
Minor Violations.
ยงย 14-5.10—
Waiver of Requirements.
ยงย 14-7.4—
Compliance with Millstone Property Maintenance Code; Fees.
ยงย 15-2.2—
Application for Permit.
ยงย 15-2.3—
Fee.
ยงย 26-3.3—
Coordination.
ยงย 26-3.4—
Duties.
ยงย 26-3.7—
Determination of Local Design Flood Elevations.
ยงย 26-3.14—
Substantial Improvement and Substantial Damage Determination.
ยงย 26-6.3—
Buildings and Structures.
ยงย 26-7.1—
General.
35-2-2{28}—
CERTIFICATE OF OCCUPANCY
ยงย 35-3-7.3—
Certificates of Occupancy.
ยงย 35-4-2.4—
Exemption from Dedication of Land to Township.
ยงย 35-4-8.4—
Restoration.
ยงย 35-4-9.3—
Height Restrictions.
ยงย 35-4-9.7—
Radio Antenna.
ยงย 35-4-9.8—
Wind, Solar or Photovoltaic Energy Facilities.
ยงย 35-4-9.10—
Subsurface Sewage Disposal Systems.
ยงย 35-4-16.1—
Applicability.
ยงย 35-6-2.4—
Gasoline Service Stations.
ยงย 35-6-3.9—
Requirements for Substantial Changes to First Priority Locations.
35-8-1{16}—
CONSTRUCTION OFFICIAL
ยงย 35-8-6—
NEW CONSTRUCTION.
ยงย 35-8-9—
CONTROL PERIODS FOR RESTRICTED OWNERSHIP UNITS AND ENFORCEMENT MECHANISMS.
ยงย 35-8-22.5—
Collection Procedures.
ยงย 35-9-2.2—
Submission Procedures.
ยงย 35-9-3.5—
Standards For Analysis Review and Approval by Review Agencies.
ยงย 35-11-18.4—
Topsoil Removal.
ยงย 35-11-18.5—
Importing Topsoil.
ยงย 35-14-5.4—
Demolitions.
ยงย 35-15-5.1—
Construction of Freestanding Signs.
ยงย 35-15-5.4—
Illumination.
Construction permits
ยงย 5-14—
FEES FOR CHAPTER 14: BUILDING AND HOUSING.
ยงย 5-15—
FEES FOR CHAPTER 15: SWIMMING POOLS.
ยงย 14-1.4A—
Waiver of Construction Fees.
ยงย 14-8.4—
Pre-Occupancy Records Inspection.
ยงย 15-5.3—
Lot Grading Plan.
ยงย 19-1.7—
Debris Management Plan for Construction Permits.
26-9.2{59}—
ORDINARY MAINTENANCE AND MINOR WORK
ยงย 35-3-9.3—
Escrow Fees.
ยงย 35-4-2.2—
Undersized Vacant Lots.
ยงย 35-4-9.8—
Wind, Solar or Photovoltaic Energy Facilities.
ยงย 35-4-16.1—
Applicability.
ยงย 35-6-3.9—
Requirements for Substantial Changes to First Priority Locations.
ยงย 35-8-22.5—
Collection Procedures.
ยงย 35-13-2.2—
Posting of Performance Guarantee.
ยงย 35-17-1.3—
Establishment and Protection of Riparian Zones.
ยงย DL-2—
DISPOSITION OF SUPPLEMENTARY LEGISLATION.
Construction trailers
Corrugated cardboard
Costs and expenses
ยงย 2-6.2—
Powers and Duties.
ยงย 2-25.7—
Court Administrator, Deputy Administrator.
ยงย 2-26.2—
Terms; Compensation.
ยงย 2-28.10—
Appropriations.
ยงย 2-30.6—
Costs.
ยงย 2-30.8—
Submission of Costs and Estimate of Expenses; Annual Appropriations.
ยงย 2-30.9—
Disposition of Monies Collected.
ยงย 2-39.7—
Certification by Chief Financial Officer.
ยงย 2-40—
PAYMENT OF CLAIMS FOR FIRE DAMAGE PROHIBITED UNLESS TAXES AND LIENS ARE PAID.
ยงย 2-41.1—
Indemnification; Requirement.
ยงย 2-46.4—
Chief Executive Officer Certification.
ยงย 2-47—
LENGTH OF SERVICE AWARDS PROGRAM.
ยงย 2-48.2—
Extraordinary Copying Charge.
ยงย 2-49.7—
Anger Management Counseling for Violators: Permission to Resume Participation.
ยงย 3-3.6—
Recreational Facilities and Permits.
ยงย 3-4.5—
Lien for Costs.
ยงย 3-4.6—
Violations and Penalties.
ยงย 3-4A.3—
Removal by Township, Costs Established as a Lien.
ยงย 3-4A.4—
Violations and Penalties.
ยงย 3-4B.3—
Duty to Confine.
ยงย 3-4B.5—
Violations, Penalties, Remedies, Lien.
ยงย 3-8.3—
Original and Copies of Map.
ยงย 3-13.3—
Annual Inspections.
ยงย 3-17.2—
Request for Criminal Background Checks; Costs.
ยงย 3-21.6—
Action on the Application.
ยงย 3-21.8—
Denial of the Permit.
ยงย 3-25.3—
Original and Copies of Map.
ยงย 4-5.15—
Hearing, Determination.
ยงย 4-6.3—
Application for Permit.
ยงย 5-2—
FEES FOR CHAPTER 2: ADMINISTRATION.
ยงย 5-14—
FEES FOR CHAPTER 14: BUILDING AND HOUSING.
ยงย 5-22—
FEES FOR CHAPTER 22: MINING AND QUARRYING.
ยงย 5-23—
FEES FOR CHAPTER 23: SOIL REMOVAL AND IMPORT.
ยงย 7-3.2—
Parking Prohibited During State of Emergency.
ยงย 7-3.7—
Parking Prohibited on Snow Covered Streets.
ยงย 7-16.8—
Tow-Away Zones.
ยงย 9-1.9—
Order and Schedule for Compliance for Potentially Dangerous Dog; Conditions.
ยงย 9-1.11—
Liability of Owner for Costs of Impoundment and Destruction.
ยงย 10-4.3—
Buyout Payment.
ยงย 10-5.2—
Issuance of Final Paycheck.
ยงย 10-6.2—
Requests for Criminal Background Checks; Costs.
ยงย 13-3.8—
Permits and Certificate of Fire Code Status.
ยงย 14-1.5—
Reports to Mayor and Township Committee.
ยงย 14-3.7—
Costs and Charges Incurred by Township.
ยงย 14-4.4—
Placing of Numbers Required.
ยงย 14-4.9—
Affixing of Numbers by Township; Costs.
ยงย 14-4.10—
Violations and Penalties.
ยงย 14-5.9—
Minor Violations.
ยงย 14-7.4—
Compliance with Millstone Property Maintenance Code; Fees.
ยงย 14-8.5—
Fees.
ยงย 16-2.4—
Revocation.
ยงย 19-1.1—
Purpose.
ยงย 19-1.10—
Violations and Penalties.
ยงย 20-2.6—
Construction and Restoration of Surface.
ยงย 20-2.8—
Performance Security for Multiple Openings.
ยงย 20-2.11—
Violations and Penalties.
21-1.1{1}—
CLEANUP PLAN
ยงย 21-1.2—
Owner or Operator of Industrial Establishment Planning to Close, Sell or Transfer Operations; Duties; Implementation of Cleanup Plan.
ยงย 21-1.6—
Failure to Comply With Section; Voiding Sale or Transfer; Liability of Transferrer; Violations; Penalties.
ยงย 21-2.6—
Fees.
21-3.2{3}—
EXPENDABLE ITEMS
ยงย 21-3.3—
Purpose.
ยงย 21-3.4—
Hazardous Substances, Discharge, Prohibition.
ยงย 21-3.7—
Period for Payment.
ยงย 22-3—
FEES.
ยงย 22-7—
MINING REGULATIONS.
ยงย 23-3.1—
Permit Required.
ยงย 23-5—
SOIL REMOVAL REGULATIONS.
ยงย 23-7—
BONDS.
ยงย 24-8—
EXTENSION OF SERVICE.
ยงย 24-11—
CONSTRUCTION/SYSTEM REQUIREMENTS.
ยงย 24-15—
LIABILITY INSURANCE.
ยงย 24-16—
PERFORMANCE BOND.
ยงย 24-20—
REMOVAL OF FACILITIES.
ยงย 26-3.14—
Substantial Improvement and Substantial Damage Determination.
ยงย 26-3.16—
Liability.
ยงย 26-7.5—
Considerations.
ยงย 26-7.6—
Conditions for Issuance.
26-9.2{20}—
CONDITIONAL LETTER OF MAP REVISION
26-9.2{21}—
CONDITIONAL LETTER OF MAP REVISION - FILL
26-9.2{41}—
HARDSHIP
26-9.2{56}—
MARKET VALUE
26-9.2{66}—
SUBSTANTIAL DAMAGE
26-9.2{67}—
SUBSTANTIAL IMPROVEMENT
ยงย 35-1-2—
INTENT AND PURPOSE.
35-2-2{71}—
HOMEOWNERS' ASSOCIATION
35-2-2{93}—
MINOR SITE PLAN
35-2-2{94}—
MINOR SUBDIVISION
ยงย 35-3-3.5—
Hearings.
ยงย 35-3-3.7—
Decisions by Planning Board and Board of Adjustment.
ยงย 35-3-5.3—
Notice of Hearings on Amendments to Land Use and Development Regulations.
ยงย 35-3-9.2—
Non-refundable Application Fees.
ยงย 35-3-9.3—
Escrow Fees.
ยงย 35-3-9.4—
Fee Schedule.
ยงย 35-4-9.8—
Wind, Solar or Photovoltaic Energy Facilities.
ยงย 35-4-14.10—
Maintenance and Repair.
ยงย 35-5-6.5—
Variable Density.
ยงย 35-5-7.5—
Variable Density.
ยงย 35-6-2.4—
Gasoline Service Stations.
ยงย 35-6-3.16—
Other Requirements.
ยงย 35-6-3.17—
Technical Review.
35-8-1{36}—
RENT
ยงย 35-8-6—
NEW CONSTRUCTION.
ยงย 35-8-11—
BUYER INCOME ELIGIBILITY.
ยงย 35-8-15—
RENT RESTRICTIONS FOR RENTAL UNITS; LEASES.
ยงย 35-8-17—
TENANT INCOME ELIGIBILITY.
ยงย 35-8-19—
ADMINISTRATIVE AGENT.
ยงย 35-8-20—
AFFIRMATIVE MARKETING REQUIREMENTS.
ยงย 35-8-21—
ENFORCEMENT OF AFFORDABLE HOUSING REGULATIONS.
ยงย 35-8-22.7—
Use of Funds.
ยงย 35-10-1.3—
Required Fees To Be Paid and Performance Guarantees Posted.
ยงย 35-10-5—
COMPLETION OF IMPROVEMENTS.
ยงย 35-11-4.23—
General Drainage Requirements.
ยงย 35-11-11.5—
Notification of Maintenance or Repair.
ยงย 35-11-12.2—
Design Elevation.
ยงย 35-11-16.10—
Removal of Sedimentation.
ยงย 35-11-18.5—
Importing Topsoil.
ยงย 35-11-19—
STREET LIGHTING.
ยงย 35-11-25.4—
Tree Removal Permit Application.
ยงย 35-11-25.9—
Fees.
ยงย 35-11-25.11—
Exceptions.
ยงย 35-11-28.1—
Deterioration and Service of Notice of Violation.
ยงย 35-11-28.3—
Violation Abatement by Municipality.
ยงย 35-11-33.3—
Review of Findings.
ยงย 35-12-1—
IMPROVEMENTS TO BE CONSTRUCTED AT SOLE EXPENSE OF SUBDIVIDER.
ยงย 35-12-2.2—
Recommendation of Township Committee.
ยงย 35-12-2.3—
Action on Improvements by the Township Committee.
ยงย 35-12-2.4—
Obligations of the Subdivider or Developer.
ยงย 35-12-6—
REDETERMINATION OF ASSESSMENT UPON COMPLETION OF IMPROVEMENT.
ยงย 35-13-2.1—
Amount of Performance Guarantee.
ยงย 35-13-2.2—
Posting of Performance Guarantee.
ยงย 35-13-3—
INSPECTIONS.
ยงย 35-13-5—
RELEASE OF GUARANTEES.
ยงย 35-14-2.2—
Staff, Experts, Counsel, Expenses and Costs.
ยงย 35-14-3.1—
Powers and Duties.
ยงย 35-14-5.3—
Standards of Review.
ยงย 35-14-5.4—
Demolitions.
ยงย 35-15-5.4—
Illumination.
ยงย 35-15-5.7—
Nonconforming Signs.
ยงย 35-15-5.8—
Maintenance of Signs.
ยงย DL-2—
DISPOSITION OF SUPPLEMENTARY LEGISLATION.
County Clerk
ยงย 3-8.3—
Original and Copies of Map.
ยงย 3-25.3—
Original and Copies of Map.
ยงย 20-1.4—
Copies on File.
ยงย 26-15.2—
Requirements for Habitable Buildings and Structures.
35-2-2{60}—
FINAL PLAT
ยงย 35-4-14.4—
Stormwater Management Requirements for Major Development.
ยงย 35-5-6A.6—
Farmland/Open Space Conservation Clusters in the RU-P District.
ยงย 35-5-6B.6—
Farmland/Open Space Conservation Clusters in the RU-C District.
ยงย 35-9-6—
SUBMISSION OF DOCUMENTS AND COMPUTERIZED MAPPING.
ยงย 35-11-11.1—
Responsibility and Maintenance.
ยงย 35-11-11.3—
Facilities Owned by the Township.
Crosswalks
Culverts
1-2{17}—
STREET
ยงย 26-15.7—
Roads and Watercourse Crossings.
35-2-2{46}—
DRAINAGE
35-2-2{129}—
PUBLIC DRAINAGE WAY
35-4-14.2{51}—
WATER CONTROL STRUCTURE
ยงย 35-4-14.5—
Calculation of Stormwater Runoff and Groundwater Recharge.
ยงย 35-5-16.4—
Activities in Stream Corridors and Stream Corridor Buffers When There Is No Reasonable or Prudent Alternative.
ยงย 35-10-2.3—
Storm Drains.
ยงย 35-11-4.5—
Storm Drain Pipes.
ยงย 35-11-4.10—
Intensity of Rainfall.
ยงย 35-11-4.11—
Coefficient of Roughness.
ยงย 35-11-4.13—
Drainage Structures.
ยงย 35-11-4.21—
Nonpipe Culverts.
Curbs
ยงย 2-30.7—
Interference with or Injuring Shade Trees; Authority of Other Commissions.
ยงย 3-24.3—
Prohibited Conduct.
ยงย 8-4—
STANDARDS FOR PARKING SPACES.
ยงย 15-5.3—
Lot Grading Plan.
ยงย 20-2.6—
Construction and Restoration of Surface.
35-2-2{25}—
CARTWAY
35-2-2{157}—
STREET
ยงย 35-4-5.1—
Sight Distances on Corner Lots.
ยงย 35-4-8.6—
"Woodsy Lane" Development.
ยงย 35-4-14.7—
Solids and Floatable Materials Control Standards.
ยงย 35-6-2.4—
Gasoline Service Stations.
ยงย 35-7-2.4—
Curbing; When Required.
ยงย 35-10-2.1—
Curbs.
ยงย 35-10-2.3—
Storm Drains.
ยงย 35-11-4.13—
Drainage Structures.
ยงย 35-11-14.3—
Street Trees.
ยงย 35-11-14.4—
Cul-De-Sacs and Traffic Control Islands.
ยงย 35-11-14.8—
Parking and Loading Areas.
ยงย 35-13-2.1—
Amount of Performance Guarantee.
ยงย 35-13-3—
INSPECTIONS.
ยงย 35-15-3—
PROHIBITED SIGNS.
ยงย 35-15-5.1—
Construction of Freestanding Signs.
ยงย 35-16-1.1—
Definitions.
ยงย 35-16-2.1—
Definitions.
ยงย 35-16-3.1—
Definitions.
35-16-7.1{1}—
MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4)
ยงย 35-16-7.3—
Design Standard.
35-16-8.1{1}—
MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4)