Index: B
Backfilling
Barricades
Batteries
187-2{3}—
E-CIGARETTE or VAPE
ยงย 190-1—
Prohibited dumping.
235-3.2{146}—
RECYCLABLE MATERIALS
ยงย 235-11.12—
Solar siting.
235-11.12B{19}—
SOLAR STORAGE BATTERIES
235-11.12B{20}—
SOLAR STORAGE BATTERY
ยงย 235-11.13—
Battery energy storage systems.
235-11.13B{2}—
BATTERY ENERGY STORAGE SYSTEM
235-11.13B{3}—
BATTERY(IES)
235-11.13B{5}—
COMMISSIONING
235-11.13B{6}—
DEDICATED-USE BUILDING
235-11.13B{12}—
NON-DEDICATED-USE BUILDING
Bed and breakfast
Blocks
ยงย 103-3—
Prohibited conduct.
ยงย 200-1—
Authority.
ยงย 200-4—
Notification.
200-6{55}—
SUBDIVISION
ยงย 200-13—
Filing of approved final subdivision plat.
ยงย 200-19—
Street layout and design.
ยงย 200-21—
Lots.
ยงย 200-26—
Sketch plan/initial submission.
ยงย 200-27—
Minor subdivision plat.
ยงย 200-28—
Major subdivision preliminary plat and accompanying data.
ยงย 200-29—
Major final subdivision plat and accompanying data.
215-8{1}—
HOUSE TRAILER
ยงย 235-10.6—
Stormwater pollution prevention plans (SWPPP).
ยงย 235-11.12—
Solar siting.
ยงย 235-13.3—
Business district identification signs.
ยงย 235-15.4—
Special permit uses (Planning Board).
Board of Appeals
Ch 25—
Ethics and Disclosure, Code of
Ch 45—
Planning Board and Zoning Board of Appeals
ยงย 45-1—
Purpose and authority.
ยงย 45-5—
Terms of office of Zoning Board of Appeals.
ยงย 116-19—
Appeals Board.
ยงย 200-14—
Public streets; recreation areas.
ยงย 200-24—
Soils group.
235-3.2{19}—
BOARD
235-3.2{184}—
VARIANCE, AREA
235-3.2{185}—
VARIANCE, USE
ยงย 235-4.2—
Use regulations.
ยงย 235-4.3—
Dimensional regulations.
ยงย 235-5.2—
Boundaries of districts on Zoning Map.
ยงย 235-10.3—
Applicability; designation of Stormwater Management Officer (SMO).
ยงย 235-12.9—
Exemptions and waivers.
ยงย 235-15—
ZONING BOARD OF APPEALS AND PLANNING BOARD
ยงย 235-15.1—
Organization, general procedure and jurisdiction.
ยงย 235-15.2—
Zoning Board of Appeals procedures.
ยงย 235-15.3—
Appeals on interpretation of local zoning law and map; general jurisdiction of Zoning Board of Appeals.
ยงย 235-15.4—
Special permit uses (Planning Board).
ยงย 235-16.3—
Enforcement.
ยงย 235-16.4—
Building permits.
ยงย 235-16.5—
Required site plan procedure and standards.
ยงย 235-16.6—
Completion of buildings for which permits have been issued.
ยงย 235-16.10—
Violations, penalties and remedies.
Boats and Boating
Bonds
ยงย 1-6—
Enactments saved from repeal; matters not affected.
ยงย 195-1—
Requirements and standards to be met; performance bond required.
ยงย 200-10—
Preliminary plat for major subdivision.
ยงย 200-11—
Final plat for major subdivision.
ยงย 200-12—
Required public improvements (major subdivisions).
ยงย 200-13—
Filing of approved final subdivision plat.
ยงย 200-14—
Public streets; recreation areas.
ยงย 200-21—
Lots.
ยงย 200-29—
Major final subdivision plat and accompanying data.
ยงย 200-36—
Building permit.
ยงย 200-37—
Improvement in streets.
ยงย 218-6—
Application and issuance of permit.
ยงย 225-6—
Exemption for local deliveries.
ยงย 235-7.10—
Mining Districts.
ยงย 235-7.13—
Gaming facility resort development.
ยงย 235-11.12—
Solar siting.
ยงย 235-11.13—
Battery energy storage systems.
ยงย 235-15.4—
Special permit uses (Planning Board).
ยงย 235-16.5—
Required site plan procedure and standards.
ยงย 235-16.9—
Fees; requirements for construction, bonding and as-built plans.
Brush, grass and weeds
ยงย 163-5—
Prohibited acts.
ยงย 190-2—
Applicability.
ยงย 195-2—
Highway right-of-way.
ยงย 195-19—
Duties of owners or occupants.
ยงย 200-12—
Required public improvements (major subdivisions).
ยงย 200-19—
Street layout and design.
ยงย 200-28—
Major subdivision preliminary plat and accompanying data.
235-3.2{35}—
COMPOSTING FACILITY
235-3.2{92}—
GROUND COVER PLANTINGS
235-3.2{194}—
YARD WASTE
ยงย 235-10.6—
Stormwater pollution prevention plans (SWPPP).
ยงย 235-11.12—
Solar siting.
ยงย 235-11.13—
Battery energy storage systems.
ยงย 235-15.4—
Special permit uses (Planning Board).
Buffers
ยงย 200-21—
Lots.
ยงย 200-23—
Parks, open spaces, trees and natural features.
ยงย 200-26—
Sketch plan/initial submission.
ยงย 200-28—
Major subdivision preliminary plat and accompanying data.
235-3.2{21}—
BUFFER
235-3.2{22}—
BUFFER OPACITY
235-3.2{91}—
GREEN INFRASTRUCTURE
235-3.2{103}—
INTENSITY CLASSIFICATION
ยงย 235-7.13—
Gaming facility resort development.
ยงย 235-10.6—
Stormwater pollution prevention plans (SWPPP).
ยงย 235-11.9—
Performance buffering.
ยงย 235-11.12—
Solar siting.
ยงย 235-11.13—
Battery energy storage systems.
ยงย 235-15.4—
Special permit uses (Planning Board).
ยงย 235-16.5—
Required site plan procedure and standards.
Building construction
Building Inspector
ยงย 25-9—
Annual disclosure.
ยงย 97-4—
Building permits.
116-4{24}—
LOCAL ADMINISTRATOR
ยงย 116-6—
Basis for establishing areas of special flood hazard.
ยงย 116-10—
Designation of local administrator.
ยงย 200-12—
Required public improvements (major subdivisions).
ยงย 200-13—
Filing of approved final subdivision plat.
ยงย 200-18—
General requirements.
ยงย 200-21—
Lots.
ยงย 200-24—
Soils group.
ยงย 200-35—
Enforcement.
235-3.2{24}—
BUILDING INSPECTOR
ยงย 235-4.5—
Right to farm.
ยงย 235-5.2—
Boundaries of districts on Zoning Map.
ยงย 235-6.4—
Environmental subdistrict regulations.
ยงย 235-6.5—
Special regulations applicable to certain uses.
ยงย 235-7.5—
Environmental subdistrict regulations.
235-10.5{5}—
CODE ENFORCEMENT OFFICER
ยงย 235-11.1—
Placement of accessory buildings and uses, including garages, off-street parking and truck loading spaces.
ยงย 235-11.4—
Yards.
ยงย 235-11.12—
Solar siting.
235-11.12B{11}—
QUALIFIED SOLAR INSTALLER
ยงย 235-11.13—
Battery energy storage systems.
ยงย 235-15.3—
Appeals on interpretation of local zoning law and map; general jurisdiction of Zoning Board of Appeals.
ยงย 235-15.4—
Special permit uses (Planning Board).
ยงย 235-16.3—
Enforcement.
ยงย 235-16.4—
Building permits.
ยงย 235-16.5—
Required site plan procedure and standards.
ยงย 235-16.6—
Completion of buildings for which permits have been issued.
ยงย 235-16.7—
Temporary building permits; temporary certificates of occupancy.
ยงย 235-16.9—
Fees; requirements for construction, bonding and as-built plans.
ยงย 235-16.10—
Violations, penalties and remedies.
ยงย 235-16.11—
Amendments.
ยงย 235-16.12—
Wellhead protection.
Building permits
97-2{2}—
BUILDING PERMIT
97-2{16}—
PERMIT HOLDER
ยงย 97-3—
Code Enforcement Officer and inspectors.
ยงย 97-4—
Building permits.
ยงย 97-5—
Construction inspections.
ยงย 97-6—
Stop-work orders.
ยงย 97-7—
Certificates of occupancy and certificates of compliance.
ยงย 97-10—
Operating permits.
ยงย 97-15—
Recordkeeping.
ยงย 97-17—
Penalties for offenses.
ยงย 97-18—
Fees.
ยงย 103-3—
Prohibited conduct.
ยงย 157-3—
Designation of landmarks or historic districts.
ยงย 157-6—
Certificate of appropriateness application procedure.
ยงย 185-2—
Application for installation; fee.
185-15{4}—
PARCEL
ยงย 185-17—
Lands exempt from charges.
ยงย 200-12—
Required public improvements (major subdivisions).
ยงย 200-21—
Lots.
ยงย 200-35—
Enforcement.
ยงย 200-36—
Building permit.
ยงย 235-4.5—
Right to farm.
ยงย 235-6.4—
Environmental subdistrict regulations.
ยงย 235-6.5—
Special regulations applicable to certain uses.
ยงย 235-6.6—
Affordable, Supportive and Veterans Supportive Housing Floating Zone.
ยงย 235-7.5—
Environmental subdistrict regulations.
ยงย 235-7.12—
Biomass Gasification-to-Energy Districts.
ยงย 235-7.13—
Gaming facility resort development.
ยงย 235-10.3—
Applicability; designation of Stormwater Management Officer (SMO).
ยงย 235-10.4—
Exemptions.
ยงย 235-10.6—
Stormwater pollution prevention plans (SWPPP).
ยงย 235-11.12—
Solar siting.
ยงย 235-11.13—
Battery energy storage systems.
ยงย 235-14.2—
Unlawful buildings, structures, or uses.
ยงย 235-15.2—
Zoning Board of Appeals procedures.
ยงย 235-15.3—
Appeals on interpretation of local zoning law and map; general jurisdiction of Zoning Board of Appeals.
ยงย 235-15.4—
Special permit uses (Planning Board).
ยงย 235-16.3—
Enforcement.
ยงย 235-16.4—
Building permits.
ยงย 235-16.5—
Required site plan procedure and standards.
ยงย 235-16.6—
Completion of buildings for which permits have been issued.
ยงย 235-16.7—
Temporary building permits; temporary certificates of occupancy.
ยงย 235-16.9—
Fees; requirements for construction, bonding and as-built plans.
ยงย 235-16.12—
Wellhead protection.
Business districts
Bus stops