Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Town of North Andover, MA
Essex County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: E
# A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Elevators
ยงย 110-8— Application and review procedures. 195-2.2{46}— MEAN HIGH WATER MARK ยงย 195-4.19— Uses and building requirements. ยงย 195-4.26— Boundaries, use of FEMA maps and supporting studies. ยงย 195-4.31— Unnumbered A Zones. ยงย 195-4.32.1— Recreational vehicles. ยงย 195-4.32.3— Requirement to submit new technical data. ยงย 195-4.32.7— Use and development regulations. 195-4.32.12{13}— FLOOD INSURANCE STUDY (FIS) 195-4.32.12{14}— FLOODWAY 195-4.32.12{16}— HIGHEST ADJACENT GRADE 195-4.32.12{32}— VIOLATION 195-4.32.12{33}— ZONE A 195-4.32.12{34}— ZONE A1-A30 AND ZONE AE (FOR NEW AND REVISED MAPS) 195-4.32.12{35}— ZONE A99 195-4.32.12{37}— ZONE V 195-4.32.12{38}— ZONE V1-30 AND ZONE VE (FOR NEW AND REVISED MAPS) ยงย 195-5.3— Application for earth removal permit. ยงย 195-5.7— Operating standards. ยงย 195-6.6— Permitted signs. ยงย 195-8.14— Information required for site plan review. 195-8.42{2}— ABOVE MEAN SEA LEVEL (AMSL) 195-8.42{8}— ELEVATION ยงย 195-8.45— Application procedures. ยงย 195-8.57— Slope defined. ยงย 195-11.3— Procedures. ยงย 195-12.3— Contents of special permit application. ยงย 195-17.43— Signage associated with nonresidential and mixed Uses. ยงย 195-17.54— Required submittals. ยงย 195-18.20— Plan review and approval process. ยงย 250-22— Contents. ยงย 250-23— Design and performance criteria. ยงย 250-25— Contents. ยงย 250-37— Proof of project completion. 255-1.3{4}— AS-BUILT (INTERIM) 255-1.3{6}— BASE FLOOD ELEVATION 255-1.3{7}— BENCHMARK ยงย 255-4.3— Form and contents. ยงย 255-5.2— Form and contents. ยงย 255-5.14— As-built plan. ยงย 255-6.24— Slopes.
Emergencies
ยงย C-2-2— Warrants ยงย 30-1— Broadcast required; meeting location. ยงย 50-1— Purpose and scope. ยงย 50-2— Installation and permit requirements. ยงย 50-6— Alarm tests. ยงย 50-7— False alarm assessment. ยงย 50-9— Violations and penalties. ยงย 50-12— Secured key access. 50-13B{4}— AUTOMATIC DIALING DEVICE 50-13B{8}— INTERCONNECT ยงย 50-16— Notification and operating requirements; nuisance alarms. ยงย 50-17— False alarms. ยงย 70-4— Administration; emergency demolition. ยงย 90-7— Obstruction of fire protection apparatus prohibited. ยงย 90-10— Towing of vehicles in violation. ยงย 105-1— Hours of operation. ยงย 130-4— Placement and installation. ยงย 135-1— Prohibitions. 165-2{41}— RETENTION 165-2{55}— WETLAND RESOURCE AREA ยงย 185-1— Authority. ยงย 185-2— Purpose. 185-3{5}— STATE OF WATER SUPPLY EMERGENCY ยงย 185-7— State of Water Supply Emergency; compliance with DEP orders. ยงย 190-3— Exempt activities. 195-2.2{34}— HAZARDOUS MATERIAL(S) ยงย 195-4.21— Emergency permits. ยงย 195-4.25— Purpose. ยงย 195-4.26— Boundaries, use of FEMA maps and supporting studies. ยงย 195-4.32.2— Watercourse alterations or relocations in riverine areas. ยงย 195-4.32.3— Requirement to submit new technical data. 195-4.32.12{9}— FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) ยงย 195-8.45— Application procedures. ยงย 195-8.53— Exemption for municipal public safety facilities. ยงย 195-8.68— Design requirements. ยงย 195-8.69— Operating requirements. ยงย 195-8.78— Permit granting authority; minimum lot size; application procedures; permit conditions. ยงย 195-8.89— Site plan review/special permit for ground-mounted solar energy systems. ยงย 195-8.90— Monitoring, maintenance, and reporting for large-scale ground-mounted solar energy systems. ยงย 250-28— Contents. ยงย 255-1.2— Purpose; consultation with other Town bodies. ยงย 255-5.2— Form and contents. ยงย 255-5.6— Decision. ยงย 255-5.11— Ownership and maintenance of subdivision improvements. ยงย 255-6.1— General requirements. ยงย 255-6.8— Streets: design standards. ยงย 255-6.14— Storm drainage. ยงย 300-11— Commercial movie and film production. ยงย 300-12— Lake Cochichewick use/boating regulations. ยงย 300-16— Designer selection procedures. ยงย 300-19— Financial reserve policies.
Erosion and sediment control
Ch 165— Stormwater Management and Erosion Control ยงย 165-1— Findings and purpose. ยงย 165-10— Enforcement; violations and penalties. Ch 195— Zoning ยงย 195-4.24— Waiver of special permit. ยงย 195-5.7— Operating standards. ยงย 195-8.14— Information required for site plan review. ยงย 195-8.15— Review criteria and design guidelines for site plan review. ยงย 195-8.89— Site plan review/special permit for ground-mounted solar energy systems. Ch 250— Stormwater Management and Erosion Control ยงย 250-1— Findings; bylaw. ยงย 250-2— Authority and purpose. ยงย 250-3— Bylaw authority. ยงย 250-5— Amendments. ยงย 250-6— Terms defined. ยงย 250-7— Permit granting authority. ยงย 250-8— Scope of coverage. ยงย 250-10— Permit and materials required. ยงย 250-12— Application. ยงย 250-16— Fees. ยงย 250-19— Plan changes. ยงย 250-21— Plan required; standards. ยงย 250-22— Contents. ยงย 250-23— Design and performance criteria. Ch 250 Art VIII— Erosion and Sediment Control Plan ยงย 250-24— Plan required. ยงย 250-25— Contents. ยงย 250-26— Control criteria. ยงย 250-29— Changes to plans. ยงย 250-33— Planning Board inspections. ยงย 250-34— Construction inspections by applicant. ยงย 250-40— Enforcement powers and authority. Ch 255— Subdivision of Land ยงย 255-5.4— Environmental and community impact statement. ยงย 255-5.15— Planning Board conditions and release of conditions. ยงย 255-6.3— Lots. ยงย 255-6.19— Guard rails. ยงย DT-1— Derivation Table of 1979 Bylaws to 2018 Code. ยงย DL-1— Disposition of legislation.