Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Borough of Northampton, PA
Northampton County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: L
A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Liability
ยงย 1-4— Ordinances saved from repeal; matters not affected by repeal. ยงย 83-5— Liability for damages. ยงย 105-2— Establishment of Office of Code Enforcement. ยงย 125-6— Warning and disclaimer of liability. ยงย 140-2— Amount of escrow. ยงย 140-7— Distribution of escrow fund. ยงย 140-14— Receipt by insuring entity. ยงย 140-16— Claims of at least 60% limits. ยงย 188-8— Owner's duties. ยงย 190-13— Slug loads and spills. ยงย 190-23— Collection of sewer rentals and charges. ยงย 190-29— Requirements for construction of building sewer. ยงย 198-5— Collection fees and charges. ยงย 203-68— Violations and penalties. ยงย 210-23— Responsibility for removal from roofs. ยงย 210-29— Application for permit. ยงย 210-37— Requirements for work; correction of unsatisfactory work; completion of incomplete work. ยงย 210-44— Payment for work done by Borough. ยงย 210-54— Warning and protective devices; liability of property owner or their agent. ยงย 210-62— Placement and use regulations. ยงย 210-65— Violations and penalties. ยงย 215-33— Release from improvement bond. ยงย 215-41— Violations and penalties; enforcement. ยงย 220-8— Purpose; repealer. ยงย 220-30— Registration. 220-43{9}— TAXPAYER ยงย 220-45— Collection through employers. ยงย 220-49— Collection. ยงย 234-3— Continuation of existing regulations. ยงย 234-66— Designation of approved storage garages; bonding; towing and storage. ยงย 234-67— Payment of towing and storage charges. ยงย 250-36— Enforcement; violations and penalties. ยงย 250-46— Stay of proceedings.
Licenses and permits
ยงย 1-4— Ordinances saved from repeal; matters not affected by repeal. ยงย 1-6— Changes and revisions in previously adopted ordinances. ยงย 38-7— Specific powers and duties. ยงย 70-5— False alarm. 74-1{2}— PUBLIC PLACE ยงย 78-1— Amusement license required. ยงย 83-1— Unauthorized animals. ยงย 83-2— Regulation of animals. ยงย 83-3— Accumulation of animal waste. ยงย 83-4— Procedures regarding animal bites. ยงย 83-6— Seizure of animals. ยงย 83-13— Enforcement. ยงย 83-14— Violations and penalties. ยงย 105-2— Establishment of Office of Code Enforcement. ยงย 105-3— Duties and powers of Code Enforcement Officer. ยงย 105-4— Permits, certificates and fees. ยงย 125-3— Applicability. ยงย 125-6— Warning and disclaimer of liability. ยงย 125-8— Permits required. ยงย 125-9— Duties and responsibilities of Floodplain Administrator. ยงย 125-10— Application procedures and requirements. ยงย 125-11— Review by County Conservation District. ยงย 125-13— Changes. ยงย 125-14— Placards. ยงย 125-15— Start of construction. ยงย 125-16— Enforcement. ยงย 125-19— Description and special requirements of identified floodplain areas. ยงย 125-23— General. ยงย 125-24— Elevation and floodproofing requirements. ยงย 125-25— Design and construction standards. ยงย 125-26— Development which may endanger human life. ยงย 125-27— Special requirements for subdivisions and development. ยงย 125-28— Special requirements for manufactured homes. ยงย 125-29— Special requirements for recreational vehicles. 125-36{22}— NEW CONSTRUCTION 125-36{30}— SPECIAL PERMIT 125-36{31}— START OF CONSTRUCTION ยงย 135-3— Health Administration. ยงย 135-4— Eating places; definitions. ยงย 135-6— Food products. ยงย 135-7— Violations and penalties. ยงย 140-16— Claims of at least 60% limits. ยงย 152-3— Moving permit required. ยงย 152-4— Application. ยงย 152-5— Fee. ยงย 152-7— Obligation of moving companies. ยงย 152-8— Denial of permit. ยงย 156-2— Inclusion of claim for fees. ยงย 167-2— Park hours. ยงย 167-3— Prohibited conduct. ยงย 167-5— Reservation for specific uses. ยงย 167-6— Permit fees. ยงย 167-16— Alcohol and tobacco. ยงย 167-20— Miscellaneous. ยงย 171-9— Exclusions. ยงย 175-2— License required; fee; conditions thereof. ยงย 175-3— Application for license. ยงย 175-4— Issuance of license; information thereon; custody and display or exhibit thereof. ยงย 175-5— Prohibited acts. ยงย 175-6— Supervision by police; records and reports. ยงย 175-7— Suspension and revocation of license; appeal. ยงย 180-1— Property Maintenance Code adopted. ยงย 180-2— Amendments to Code. ยงย 180-6— Prohibited activities. ยงย 184-5— Exceptions. ยงย 186-2— Knox Box required for certain structures. ยงย 188-1— Purpose. ยงย 188-2— Definitions. 188-2{4}— DISRUPTIVE CONDUCT 188-2C{6}— RESIDENTIAL RENTAL UNIT LICENSE ยงย 188-4— Residential rental unit registration, inspection and licensing process. ยงย 188-6— Inspection and licensing of residential rental units. ยงย 188-7— Enforcement; denial and revocation of license; appeals; violations and penalties. ยงย 188-9— Tenant's duties. ยงย 190-2— Objectives. 190-3{6}— BOROUGH USERS 190-3{39}— INTERFERENCE 190-3{49}— NPDES PERMIT 190-3{53}— PASS-THROUGH 190-3{93}— USER 190-3{95}— WASTEWATER DISCHARGE PERMIT ยงย 190-4— Discharge of stormwaters. ยงย 190-7— Prohibited discharge. ยงย 190-11— Local limits. ยงย 190-17— Garbage grinders. ยงย 190-24— Tapping, connection and customer facility fees. ยงย 190-25— Industrial pretreatment requirement fees. ยงย 190-26— Connection to sewage collection system. ยงย 190-27— Application for permit to connect to sewage collection system. ยงย 190-28— Construction of building sewer to sewage collection system. ยงย 190-29— Requirements for construction of building sewer. ยงย 190-30— Discharge permits. ยงย 190-31— Compliance schedule. ยงย 190-32— Monitoring facilities, sampling and analysis. ยงย 190-33— Administrative appeals. ยงย 190-34— Inspections; pretreatment facilities; changes. ยงย 190-35— Reports. ยงย 190-36— Confidential information. ยงย 190-37— Enforcement. ยงย 198-3— Collection and disposal; violations and penalties.. ยงย 203-6— Compatibility with other requirements. ยงย 203-8— Stormwater management general requirements. ยงย 203-11— Calculation methodology. ยงย 203-12— Drainage plan required. ยงย 203-15— Plan submission. ยงย 203-16— Drainage plan review. ยงย 203-19— Schedule of inspections. ยงย 203-21— Expenses covered by fees. ยงย 203-24— Notification. ยงย 203-27— Statement of findings. ยงย 203-28— Purpose. ยงย 203-31— Exemptions. ยงย 203-32— Compatibility with other requirements. 203-35{57}— QUALIFIED GEOTECHNICAL PROFESSIONAL ยงย 203-36— Stormwater management requirements. ยงย 203-37— Permit requirements by other government entities. ยงย 203-38— Erosion and sediment control during regulated earth disturbance activities. ยงย 203-39— Postconstruction water quality criteria. ยงย 203-42— Calculation methodology. ยงย 203-43— Drainage plan required. ยงย 203-46— Plan submission. ยงย 203-47— Drainage plan review. ยงย 203-50— Schedule of inspections. ยงย 203-52— Expenses covered by fees. ยงย 203-60— Prohibited discharges. ยงย 203-62— Roof drains. ยงย 203-67— Suspension and revocation of permits and approvals. ยงย 210-12— Location of new utility mains; extensions and replacement of existing mains. ยงย 210-22— Responsibility for removal of snow and ice. ยงย 210-28— Permit required to make opening or excavation. ยงย 210-29— Application for permit. ยงย 210-30— Permit fee. ยงย 210-31— Issuance of permits restricted. ยงย 210-32— Information contained on permit. ยงย 210-33— Permit approval/disapproval. ยงย 210-34— Responsibility to contact utilities. ยงย 210-36— Responsibility of permit holder for certain work; right of Borough to do certain work; charges therefor. ยงย 210-37— Requirements for work; correction of unsatisfactory work; completion of incomplete work. ยงย 210-38— Emergency openings. ยงย 210-40— Work necessitating opening or excavation to be done prior to street improvement and not until five years thereafter; exception. ยงย 210-41— Permittee responsibilities for future relocation of work. ยงย 210-49— Curbing and sidewalk specifications. ยงย 210-50— Permits. ยงย 210-51— Inspections. 210-59{1}— PERMITTEE ยงย 210-60— Permit required. ยงย 210-61— Permit fee. ยงย 210-62— Placement and use regulations. ยงย 210-63— Revocation of permit. Ch 215— Subdivision and Land Development 215-8{3}— APPLICATION FOR DEVELOPMENT 215-8{17}— ENGINEER 215-8{30}— LOT 215-8{54}— RUNOFF FROM A FULLY DEVELOPED AREA UPSTREAM 215-8{69}— SURVEYOR ยงย 215-15— Review of final plan. ยงย 215-18— Preliminary plans. ยงย 215-19— Final plan. ยงย 215-22— Block and lot design standards. ยงย 215-23— Street design standards. ยงย 215-24— Sanitary sewage disposal. ยงย 215-25— Water supply and distribution systems. ยงย 215-26— Storm drainage systems. ยงย 215-28— Mobile home parks. ยงย 215-29— Environmental protection and open space preservation. ยงย 215-32— Completion of improvements or guarantee thereof prerequisite to final plat approval. ยงย 215-33— Release from improvement bond. ยงย 215-40— Preventive remedies. ยงย 215-44— Review fees. ยงย 220-3— No exemption from tax. ยงย 220-9— Construal of provisions. ยงย 220-23— Administrative appeals. ยงย 220-40— Interest. Ch 228 Art I— Identification; Annual License ยงย 228-1— Identification; annual license. ยงย 228-3— License required. ยงย 228-4— Issuance of license; inspection fee. Ch 234— Vehicles and Traffic ยงย 234-7— Use of streets by processions and assemblages. ยงย 234-18— Right turns only permitted at certain intersections. ยงย 234-24— Operation of motor vehicles restricted on public lands. ยงย 234-26— Play highways. 234-35A{1}— ARTICULATED BUS ยงย 234-35.1— Parking of unlicensed and uninspected vehicles restricted. ยงย 234-35.2— Dismantled or mechanically inoperable vehicles restricted. ยงย 234-38— Handicapped parking. ยงย 234-39— Standing or parking on roadway for loading or unloading. ยงย 234-40— Angle parking required on portions of certain streets. ยงย 234-41— Residential permit parking. 234-41B{2}— PROPRIETOR ยงย 234-42— Violations and penalties for specified sections. ยงย 234-43— Violations and penalties. ยงย 234-45— Issuance of parking permits to business owners or operators. ยงย 234-52— Unlawful to remain parked at meter showing violation. ยงย 234-54— Ticketing of vehicles parked unlawfully; effect of payment within 24 hours. ยงย 234-60— School bus regulations. ยงย 234-72— Reports and disposition of unclaimed vehicles. ยงย 234-79— Restrictions on use of pushcarts. ยงย 234-84— Locations where pedestrians may cross only in crosswalk. ยงย 240-1— General policy. ยงย 240-2— Building permits; water service. 240-7{6}— WATER SYSTEM ยงย 240-9— Connection requirements. 246-1{2}— HOUSEHOLD 246-1{3}— PERMIT ยงย 246-2— Permit required; signs prohibited on public property. ยงย 246-3— Frequency and duration limitations. ยงย 246-4— Fee for permit. Ch 250— Zoning ยงย 250-5— Plan objectives. 250-7{16}— AUTOMOTIVE JUNKYARD 250-7{28}— CHILD DAY-CARE CENTER 250-7{31}— COMMERCIAL VEHICLE 250-7{35}— COMMUNICATIONS ANTENNA 250-7{40}— CONVALESCENT CENTER 250-7{48}— DENSITY 250-7{50}— DOMICILIARY CARE HOME 250-7{64}— GROUP CARE FACILITY 250-7{67}— HOME OCCUPATION 250-7{75}— LANDSCAPING 250-7{77}— LOT 250-7{90}— OPEN SPACE 250-7{97}— PERMIT 250-7{98}— PERMITTED USE 250-7{100}— PERSONAL CARE HOME 250-7{103}— PREEXISTING TOWERS and PREEXISTING ANTENNAS 250-7{132}— YARD ยงย 250-11— Intent and purpose of zoning districts. ยงย 250-13— Application of regulations. ยงย 250-15— Nonconforming uses and buildings. ยงย 250-16— Lot regulations and permitted deviations from required areas. ยงย 250-18— Accessory structures and uses. ยงย 250-19— Off-street parking and loading. ยงย 250-20— Temporary uses, excavations and fill activity. ยงย 250-21— Performance requirements. ยงย 250-22— Miscellaneous provisions. ยงย 250-23— Mobile homes. ยงย 250-24— Special uses. ยงย 250-25— Site plan review. ยงย 250-27— Adult-oriented facility guidelines. ยงย 250-28— Family care facility and group care facility guidelines. ยงย 250-29— Miscellaneous use guidelines. ยงย 250-30— Provisions for wireless telecommunications, towers and antennas. ยงย 250-31— General procedure. ยงย 250-32— Zoning permit and Zoning Officer. ยงย 250-33— Certificate of occupancy. ยงย 250-36— Enforcement; violations and penalties. ยงย 250-37— Appeal from Zoning Officer. ยงย 250-41— Jurisdiction and functions. ยงย 250-42— Procedure for Zoning Hearing Board. ยงย 250-44— Hearings and decisions. ยงย 250-47— Appointment and powers of Zoning Officer. ยงย 250-48— Procedure to obtain preliminary opinion. ยงย 250-56— Curative amendments. ยงย 250-61— Validity of ordinance; substantive questions. ยงย DT-1— Derivation Table of 1993 Code to 2012 Code
Lots
74-1{2}— PUBLIC PLACE ยงย 125-27— Special requirements for subdivisions and development. 125-36{1}— ACCESSORY USE OR STRUCTURE 125-36{8}— EXISTING MANUFACTURED HOME PARK OR SUBDIVISION 125-36{9}— EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION 125-36{20}— MANUFACTURED HOME PARK OR SUBDIVISION 125-36{23}— NEW MANUFACTURED HOME PARK OR SUBDIVISION 125-36{33}— SUBDIVISION 171-1{2}— PUBLIC PLACE 188-2C{5}— RESIDENTIAL RENTAL UNIT ยงย 203-5— Applicability. 203-7{18}— LAND DEVELOPMENT 203-7{41}— SUBDIVISION ยงย 203-14— Drainage plan requirements. ยงย 203-18— Hardship waiver procedure. ยงย 203-22— Maintenance responsibilities. ยงย 203-30— Applicability. 203-35{35}— LAND DEVELOPMENT 203-35{83}— SUBDIVISION ยงย 203-45— Drainage plan contents. ยงย 203-49— Hardship waiver procedure. ยงย 203-54— Responsibilities for operation and maintenance of BMPs. ยงย 210-3— Curb grades given only by block. ยงย 210-4— Lines and grades furnished only in relation to streets. ยงย 210-17— Method of assuring payment of street paving costs. ยงย 210-22— Responsibility for removal of snow and ice. ยงย 210-50— Permits. ยงย 215-3— Jurisdiction. ยงย 215-4— Exemptions. 215-8{1}— ACCESSORY USE OR STRUCTURE 215-8{14}— DOUBLE OR REVERSE FRONTAGE LOT 215-8{26}— IMPROVEMENTS 215-8{28}— LAND DEVELOPMENT 215-8{30}— LOT 215-8{31}— LOT AREA 215-8{35}— MOBILE HOME LOT 215-8{36}— MOBILE HOME PARK 215-8{44}— PLAN, PRELIMINARY 215-8{46}— PRINCIPAL USE 215-8{51}— RESUBDIVISION 215-8{55}— SANITARY SEWAGE DISPOSAL, CENTRALIZED 215-8{56}— SANITARY SEWAGE DISPOSAL, ON-LOT 215-8{57}— SANITARY SEWAGE DISPOSAL, PUBLIC 215-8{67}— SUBDIVISION 215-8{76}— WATER SUPPLY AND DISTRIBUTION SYSTEM, ON-LOT ยงย 215-16— Plans exempted from standard procedure. ยงย 215-18— Preliminary plans. ยงย 215-19— Final plan. ยงย 215-22— Block and lot design standards. ยงย 215-23— Street design standards. ยงย 215-24— Sanitary sewage disposal. ยงย 215-25— Water supply and distribution systems. ยงย 215-27— Underground utilities and easements. ยงย 215-28— Mobile home parks. ยงย 215-29— Environmental protection and open space preservation. ยงย 215-31— Required improvements. ยงย 215-32— Completion of improvements or guarantee thereof prerequisite to final plat approval. ยงย 215-35— Recording plats and deeds. ยงย 215-37— Effect of change in this chapter. 224-2{1}— ALLEY ยงย 234-36— Parking time limited in certain locations certain days and hours. ยงย 234-57— Speed limits. ยงย 234-58— Traffic direction. ยงย 234-65— Tow-away zones designated. Ch 250— Zoning 250-7{2}— ACCESSORY USE OR STRUCTURE 250-7{21}— BLOCK 250-7{24}— BUFFER 250-7{43}— COURT and COURTYARD 250-7{51}— DWELLING 250-7{58}— FENCE 250-7{62}— FRONTAGE 250-7{72}— JUNKYARD 250-7{73}— KENNEL 250-7{77}— LOT 250-7{80}— MOBILE HOME LOT 250-7{81}— MOBILE HOME PARK 250-7{85}— NONCONFORMING LOT 250-7{91}— PARK AND RIDE FACILITIES 250-7{94}— PARKING LOT 250-7{95}— PARKING SPACE, AUTOMOBILE 250-7{104}— PRINCIPAL USE 250-7{111}— RESORT 250-7{130}— VARIANCE 250-7{132}— YARD ยงย 250-10— Interpretation of boundaries. ยงย 250-11— Intent and purpose of zoning districts. ยงย 250-13— Application of regulations. ยงย 250-15— Nonconforming uses and buildings. ยงย 250-16— Lot regulations and permitted deviations from required areas. ยงย 250-17— Unique lots and building locations. ยงย 250-18— Accessory structures and uses. ยงย 250-19— Off-street parking and loading. ยงย 250-21— Performance requirements. ยงย 250-22— Miscellaneous provisions. ยงย 250-23— Mobile homes. ยงย 250-25— Site plan review. ยงย 250-28— Family care facility and group care facility guidelines. ยงย 250-29— Miscellaneous use guidelines. ยงย 250-30— Provisions for wireless telecommunications, towers and antennas. ยงย 250-31— General procedure. ยงย 250-32— Zoning permit and Zoning Officer. ยงย 250-37— Appeal from Zoning Officer. ยงย 250-38— Public hearings and notice. ยงย 250-41— Jurisdiction and functions.