Index: L
Landfills
ยงย 125-25—
Design and construction standards.
220-26{4}—
MUNICIPAL WASTE LANDFILL
220-26{6}—
RECYCLING BUSINESS
Ch 250—
Zoning
250-7{105}—
PUBLIC BUILDING OR FACILITY
ยงย 250-19—
Off-street parking and loading.
ยงย 250-20—
Temporary uses, excavations and fill activity.
ยงย 250-29—
Miscellaneous use guidelines.
Landscape plans
Landscaping
ยงย 190-32—
Monitoring facilities, sampling and analysis.
203-35{34}—
KARST
ยงย 203-63—
Alteration of BMPs.
ยงย 215-18—
Preliminary plans.
ยงย 215-22—
Block and lot design standards.
ยงย 215-29—
Environmental protection and open space preservation.
234-35A{5}—
COMMERCIAL CONSTRUCTION TRUCK
250-7{75}—
LANDSCAPING
250-7{90}—
OPEN SPACE
ยงย 250-19—
Off-street parking and loading.
ยงย 250-22—
Miscellaneous provisions.
ยงย 250-24—
Special uses.
ยงย 250-25—
Site plan review.
ยงย 250-29—
Miscellaneous use guidelines.
ยงย 250-30—
Provisions for wireless telecommunications, towers and antennas.
ยงย 250-36—
Enforcement; violations and penalties.
Liability
ยงย 1-4—
Ordinances saved from repeal; matters not affected by repeal.
ยงย 83-5—
Liability for damages.
ยงย 105-2—
Establishment of Office of Code Enforcement.
ยงย 125-6—
Warning and disclaimer of liability.
ยงย 140-2—
Amount of escrow.
ยงย 140-7—
Distribution of escrow fund.
ยงย 140-14—
Receipt by insuring entity.
ยงย 140-16—
Claims of at least 60% limits.
ยงย 188-8—
Owner's duties.
ยงย 190-13—
Slug loads and spills.
ยงย 190-23—
Collection of sewer rentals and charges.
ยงย 190-29—
Requirements for construction of building sewer.
ยงย 198-5—
Collection fees and charges.
ยงย 203-68—
Violations and penalties.
ยงย 210-23—
Responsibility for removal from roofs.
ยงย 210-29—
Application for permit.
ยงย 210-37—
Requirements for work; correction of unsatisfactory work; completion of incomplete work.
ยงย 210-44—
Payment for work done by Borough.
ยงย 210-54—
Warning and protective devices; liability of property owner or their agent.
ยงย 210-62—
Placement and use regulations.
ยงย 210-65—
Violations and penalties.
ยงย 215-33—
Release from improvement bond.
ยงย 215-41—
Violations and penalties; enforcement.
ยงย 220-8—
Purpose; repealer.
ยงย 220-30—
Registration.
220-43{9}—
TAXPAYER
ยงย 220-45—
Collection through employers.
ยงย 220-49—
Collection.
ยงย 234-3—
Continuation of existing regulations.
ยงย 234-66—
Designation of approved storage garages; bonding; towing and storage.
ยงย 234-67—
Payment of towing and storage charges.
ยงย 250-36—
Enforcement; violations and penalties.
ยงย 250-46—
Stay of proceedings.
Licenses and permits
ยงย 1-4—
Ordinances saved from repeal; matters not affected by repeal.
ยงย 1-6—
Changes and revisions in previously adopted ordinances.
ยงย 38-7—
Specific powers and duties.
ยงย 70-5—
False alarm.
74-1{2}—
PUBLIC PLACE
ยงย 78-1—
Amusement license required.
ยงย 83-1—
Unauthorized animals.
ยงย 83-2—
Regulation of animals.
ยงย 83-3—
Accumulation of animal waste.
ยงย 83-4—
Procedures regarding animal bites.
ยงย 83-6—
Seizure of animals.
ยงย 83-13—
Enforcement.
ยงย 83-14—
Violations and penalties.
ยงย 105-2—
Establishment of Office of Code Enforcement.
ยงย 105-3—
Duties and powers of Code Enforcement Officer.
ยงย 105-4—
Permits, certificates and fees.
ยงย 125-3—
Applicability.
ยงย 125-6—
Warning and disclaimer of liability.
ยงย 125-8—
Permits required.
ยงย 125-9—
Duties and responsibilities of Floodplain Administrator.
ยงย 125-10—
Application procedures and requirements.
ยงย 125-11—
Review by County Conservation District.
ยงย 125-13—
Changes.
ยงย 125-14—
Placards.
ยงย 125-15—
Start of construction.
ยงย 125-16—
Enforcement.
ยงย 125-19—
Description and special requirements of identified floodplain areas.
ยงย 125-23—
General.
ยงย 125-24—
Elevation and floodproofing requirements.
ยงย 125-25—
Design and construction standards.
ยงย 125-26—
Development which may endanger human life.
ยงย 125-27—
Special requirements for subdivisions and development.
ยงย 125-28—
Special requirements for manufactured homes.
ยงย 125-29—
Special requirements for recreational vehicles.
125-36{22}—
NEW CONSTRUCTION
125-36{30}—
SPECIAL PERMIT
125-36{31}—
START OF CONSTRUCTION
ยงย 135-3—
Health Administration.
ยงย 135-4—
Eating places; definitions.
ยงย 135-6—
Food products.
ยงย 135-7—
Violations and penalties.
ยงย 140-16—
Claims of at least 60% limits.
ยงย 152-3—
Moving permit required.
ยงย 152-4—
Application.
ยงย 152-5—
Fee.
ยงย 152-7—
Obligation of moving companies.
ยงย 152-8—
Denial of permit.
ยงย 156-2—
Inclusion of claim for fees.
ยงย 167-2—
Park hours.
ยงย 167-3—
Prohibited conduct.
ยงย 167-5—
Reservation for specific uses.
ยงย 167-6—
Permit fees.
ยงย 167-16—
Alcohol and tobacco.
ยงย 167-20—
Miscellaneous.
ยงย 171-9—
Exclusions.
ยงย 175-2—
License required; fee; conditions thereof.
ยงย 175-3—
Application for license.
ยงย 175-4—
Issuance of license; information thereon; custody and display or exhibit thereof.
ยงย 175-5—
Prohibited acts.
ยงย 175-6—
Supervision by police; records and reports.
ยงย 175-7—
Suspension and revocation of license; appeal.
ยงย 180-1—
Property Maintenance Code adopted.
ยงย 180-2—
Amendments to Code.
ยงย 180-6—
Prohibited activities.
ยงย 184-5—
Exceptions.
ยงย 186-2—
Knox Box required for certain structures.
ยงย 188-1—
Purpose.
ยงย 188-2—
Definitions.
188-2{4}—
DISRUPTIVE CONDUCT
188-2C{6}—
RESIDENTIAL RENTAL UNIT LICENSE
ยงย 188-4—
Residential rental unit registration, inspection and licensing process.
ยงย 188-6—
Inspection and licensing of residential rental units.
ยงย 188-7—
Enforcement; denial and revocation of license; appeals; violations and penalties.
ยงย 188-9—
Tenant's duties.
ยงย 190-2—
Objectives.
190-3{6}—
BOROUGH USERS
190-3{39}—
INTERFERENCE
190-3{49}—
NPDES PERMIT
190-3{53}—
PASS-THROUGH
190-3{93}—
USER
190-3{95}—
WASTEWATER DISCHARGE PERMIT
ยงย 190-4—
Discharge of stormwaters.
ยงย 190-7—
Prohibited discharge.
ยงย 190-11—
Local limits.
ยงย 190-17—
Garbage grinders.
ยงย 190-24—
Tapping, connection and customer facility fees.
ยงย 190-25—
Industrial pretreatment requirement fees.
ยงย 190-26—
Connection to sewage collection system.
ยงย 190-27—
Application for permit to connect to sewage collection system.
ยงย 190-28—
Construction of building sewer to sewage collection system.
ยงย 190-29—
Requirements for construction of building sewer.
ยงย 190-30—
Discharge permits.
ยงย 190-31—
Compliance schedule.
ยงย 190-32—
Monitoring facilities, sampling and analysis.
ยงย 190-33—
Administrative appeals.
ยงย 190-34—
Inspections; pretreatment facilities; changes.
ยงย 190-35—
Reports.
ยงย 190-36—
Confidential information.
ยงย 190-37—
Enforcement.
ยงย 198-3—
Collection and disposal; violations and penalties..
ยงย 203-6—
Compatibility with other requirements.
ยงย 203-8—
Stormwater management general requirements.
ยงย 203-11—
Calculation methodology.
ยงย 203-12—
Drainage plan required.
ยงย 203-15—
Plan submission.
ยงย 203-16—
Drainage plan review.
ยงย 203-19—
Schedule of inspections.
ยงย 203-21—
Expenses covered by fees.
ยงย 203-24—
Notification.
ยงย 203-27—
Statement of findings.
ยงย 203-28—
Purpose.
ยงย 203-31—
Exemptions.
ยงย 203-32—
Compatibility with other requirements.
203-35{57}—
QUALIFIED GEOTECHNICAL PROFESSIONAL
ยงย 203-36—
Stormwater management requirements.
ยงย 203-37—
Permit requirements by other government entities.
ยงย 203-38—
Erosion and sediment control during regulated earth disturbance activities.
ยงย 203-39—
Postconstruction water quality criteria.
ยงย 203-42—
Calculation methodology.
ยงย 203-43—
Drainage plan required.
ยงย 203-46—
Plan submission.
ยงย 203-47—
Drainage plan review.
ยงย 203-50—
Schedule of inspections.
ยงย 203-52—
Expenses covered by fees.
ยงย 203-60—
Prohibited discharges.
ยงย 203-62—
Roof drains.
ยงย 203-67—
Suspension and revocation of permits and approvals.
ยงย 210-12—
Location of new utility mains; extensions and replacement of existing mains.
ยงย 210-22—
Responsibility for removal of snow and ice.
ยงย 210-28—
Permit required to make opening or excavation.
ยงย 210-29—
Application for permit.
ยงย 210-30—
Permit fee.
ยงย 210-31—
Issuance of permits restricted.
ยงย 210-32—
Information contained on permit.
ยงย 210-33—
Permit approval/disapproval.
ยงย 210-34—
Responsibility to contact utilities.
ยงย 210-36—
Responsibility of permit holder for certain work; right of Borough to do certain work; charges therefor.
ยงย 210-37—
Requirements for work; correction of unsatisfactory work; completion of incomplete work.
ยงย 210-38—
Emergency openings.
ยงย 210-40—
Work necessitating opening or excavation to be done prior to street improvement and not until five years thereafter; exception.
ยงย 210-41—
Permittee responsibilities for future relocation of work.
ยงย 210-49—
Curbing and sidewalk specifications.
ยงย 210-50—
Permits.
ยงย 210-51—
Inspections.
210-59{1}—
PERMITTEE
ยงย 210-60—
Permit required.
ยงย 210-61—
Permit fee.
ยงย 210-62—
Placement and use regulations.
ยงย 210-63—
Revocation of permit.
Ch 215—
Subdivision and Land Development
215-8{3}—
APPLICATION FOR DEVELOPMENT
215-8{17}—
ENGINEER
215-8{30}—
LOT
215-8{54}—
RUNOFF FROM A FULLY DEVELOPED AREA UPSTREAM
215-8{69}—
SURVEYOR
ยงย 215-15—
Review of final plan.
ยงย 215-18—
Preliminary plans.
ยงย 215-19—
Final plan.
ยงย 215-22—
Block and lot design standards.
ยงย 215-23—
Street design standards.
ยงย 215-24—
Sanitary sewage disposal.
ยงย 215-25—
Water supply and distribution systems.
ยงย 215-26—
Storm drainage systems.
ยงย 215-28—
Mobile home parks.
ยงย 215-29—
Environmental protection and open space preservation.
ยงย 215-32—
Completion of improvements or guarantee thereof prerequisite to final plat approval.
ยงย 215-33—
Release from improvement bond.
ยงย 215-40—
Preventive remedies.
ยงย 215-44—
Review fees.
ยงย 220-3—
No exemption from tax.
ยงย 220-9—
Construal of provisions.
ยงย 220-23—
Administrative appeals.
ยงย 220-40—
Interest.
Ch 228 Art I—
Identification; Annual License
ยงย 228-1—
Identification; annual license.
ยงย 228-3—
License required.
ยงย 228-4—
Issuance of license; inspection fee.
Ch 234—
Vehicles and Traffic
ยงย 234-7—
Use of streets by processions and assemblages.
ยงย 234-18—
Right turns only permitted at certain intersections.
ยงย 234-24—
Operation of motor vehicles restricted on public lands.
ยงย 234-26—
Play highways.
234-35A{1}—
ARTICULATED BUS
ยงย 234-35.1—
Parking of unlicensed and uninspected vehicles restricted.
ยงย 234-35.2—
Dismantled or mechanically inoperable vehicles restricted.
ยงย 234-38—
Handicapped parking.
ยงย 234-39—
Standing or parking on roadway for loading or unloading.
ยงย 234-40—
Angle parking required on portions of certain streets.
ยงย 234-41—
Residential permit parking.
234-41B{2}—
PROPRIETOR
ยงย 234-42—
Violations and penalties for specified sections.
ยงย 234-43—
Violations and penalties.
ยงย 234-45—
Issuance of parking permits to business owners or operators.
ยงย 234-52—
Unlawful to remain parked at meter showing violation.
ยงย 234-54—
Ticketing of vehicles parked unlawfully; effect of payment within 24 hours.
ยงย 234-60—
School bus regulations.
ยงย 234-72—
Reports and disposition of unclaimed vehicles.
ยงย 234-79—
Restrictions on use of pushcarts.
ยงย 234-84—
Locations where pedestrians may cross only in crosswalk.
ยงย 240-1—
General policy.
ยงย 240-2—
Building permits; water service.
240-7{6}—
WATER SYSTEM
ยงย 240-9—
Connection requirements.
246-1{2}—
HOUSEHOLD
246-1{3}—
PERMIT
ยงย 246-2—
Permit required; signs prohibited on public property.
ยงย 246-3—
Frequency and duration limitations.
ยงย 246-4—
Fee for permit.
Ch 250—
Zoning
ยงย 250-5—
Plan objectives.
250-7{16}—
AUTOMOTIVE JUNKYARD
250-7{28}—
CHILD DAY-CARE CENTER
250-7{31}—
COMMERCIAL VEHICLE
250-7{35}—
COMMUNICATIONS ANTENNA
250-7{40}—
CONVALESCENT CENTER
250-7{48}—
DENSITY
250-7{50}—
DOMICILIARY CARE HOME
250-7{64}—
GROUP CARE FACILITY
250-7{67}—
HOME OCCUPATION
250-7{75}—
LANDSCAPING
250-7{77}—
LOT
250-7{90}—
OPEN SPACE
250-7{97}—
PERMIT
250-7{98}—
PERMITTED USE
250-7{100}—
PERSONAL CARE HOME
250-7{103}—
PREEXISTING TOWERS and PREEXISTING ANTENNAS
250-7{132}—
YARD
ยงย 250-11—
Intent and purpose of zoning districts.
ยงย 250-13—
Application of regulations.
ยงย 250-15—
Nonconforming uses and buildings.
ยงย 250-16—
Lot regulations and permitted deviations from required areas.
ยงย 250-18—
Accessory structures and uses.
ยงย 250-19—
Off-street parking and loading.
ยงย 250-20—
Temporary uses, excavations and fill activity.
ยงย 250-21—
Performance requirements.
ยงย 250-22—
Miscellaneous provisions.
ยงย 250-23—
Mobile homes.
ยงย 250-24—
Special uses.
ยงย 250-25—
Site plan review.
ยงย 250-27—
Adult-oriented facility guidelines.
ยงย 250-28—
Family care facility and group care facility guidelines.
ยงย 250-29—
Miscellaneous use guidelines.
ยงย 250-30—
Provisions for wireless telecommunications, towers and antennas.
ยงย 250-31—
General procedure.
ยงย 250-32—
Zoning permit and Zoning Officer.
ยงย 250-33—
Certificate of occupancy.
ยงย 250-36—
Enforcement; violations and penalties.
ยงย 250-37—
Appeal from Zoning Officer.
ยงย 250-41—
Jurisdiction and functions.
ยงย 250-42—
Procedure for Zoning Hearing Board.
ยงย 250-44—
Hearings and decisions.
ยงย 250-47—
Appointment and powers of Zoning Officer.
ยงย 250-48—
Procedure to obtain preliminary opinion.
ยงย 250-56—
Curative amendments.
ยงย 250-61—
Validity of ordinance; substantive questions.
ยงย DT-1—
Derivation Table of 1993 Code to 2012 Code
Liens
ยงย 140-13—
Certificate contents.
ยงย 156-1—
Compliance with statutory procedures.
ยงย 156-2—
Inclusion of claim for fees.
ยงย 156-3—
Fees.
ยงย 188-7—
Enforcement; denial and revocation of license; appeals; violations and penalties.
ยงย 190-23—
Collection of sewer rentals and charges.
ยงย 190-28—
Construction of building sewer to sewage collection system.
ยงย 198-5—
Collection fees and charges.
ยงย 203-65—
Notification.
ยงย 210-17—
Method of assuring payment of street paving costs.
ยงย 215-22—
Block and lot design standards.
ยงย 220-40—
Interest.
ยงย 240-8—
Use of public water system required.
Lighting
ยงย 135-1—
Conditions which may constitute a nuisance.
190-3{14}—
COLOR
ยงย 190-29—
Requirements for construction of building sewer.
198-2{5}—
LIGHT COMMERCIAL
ยงย 210-54—
Warning and protective devices; liability of property owner or their agent.
ยงย 215-37—
Effect of change in this chapter.
224-2{5}—
TOBACCO
Ch 250—
Zoning
ยงย 250-4—
Objectives.
250-7{9}—
ALTERNATIVE TOWER STRUCTURE
250-7{117}—
SIGN
250-7{129}—
UTILITY
ยงย 250-11—
Intent and purpose of zoning districts.
ยงย 250-18—
Accessory structures and uses.
ยงย 250-19—
Off-street parking and loading.
ยงย 250-23—
Mobile homes.
ยงย 250-25—
Site plan review.
ยงย 250-30—
Provisions for wireless telecommunications, towers and antennas.
ยงย 250-44—
Hearings and decisions.
ยงย 250-61—
Validity of ordinance; substantive questions.
Littering
Loitering
Lots
74-1{2}—
PUBLIC PLACE
ยงย 125-27—
Special requirements for subdivisions and development.
125-36{1}—
ACCESSORY USE OR STRUCTURE
125-36{8}—
EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
125-36{9}—
EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
125-36{20}—
MANUFACTURED HOME PARK OR SUBDIVISION
125-36{23}—
NEW MANUFACTURED HOME PARK OR SUBDIVISION
125-36{33}—
SUBDIVISION
171-1{2}—
PUBLIC PLACE
188-2C{5}—
RESIDENTIAL RENTAL UNIT
ยงย 203-5—
Applicability.
203-7{18}—
LAND DEVELOPMENT
203-7{41}—
SUBDIVISION
ยงย 203-14—
Drainage plan requirements.
ยงย 203-18—
Hardship waiver procedure.
ยงย 203-22—
Maintenance responsibilities.
ยงย 203-30—
Applicability.
203-35{35}—
LAND DEVELOPMENT
203-35{83}—
SUBDIVISION
ยงย 203-45—
Drainage plan contents.
ยงย 203-49—
Hardship waiver procedure.
ยงย 203-54—
Responsibilities for operation and maintenance of BMPs.
ยงย 210-3—
Curb grades given only by block.
ยงย 210-4—
Lines and grades furnished only in relation to streets.
ยงย 210-17—
Method of assuring payment of street paving costs.
ยงย 210-22—
Responsibility for removal of snow and ice.
ยงย 210-50—
Permits.
ยงย 215-3—
Jurisdiction.
ยงย 215-4—
Exemptions.
215-8{1}—
ACCESSORY USE OR STRUCTURE
215-8{14}—
DOUBLE OR REVERSE FRONTAGE LOT
215-8{26}—
IMPROVEMENTS
215-8{28}—
LAND DEVELOPMENT
215-8{30}—
LOT
215-8{31}—
LOT AREA
215-8{35}—
MOBILE HOME LOT
215-8{36}—
MOBILE HOME PARK
215-8{44}—
PLAN, PRELIMINARY
215-8{46}—
PRINCIPAL USE
215-8{51}—
RESUBDIVISION
215-8{55}—
SANITARY SEWAGE DISPOSAL, CENTRALIZED
215-8{56}—
SANITARY SEWAGE DISPOSAL, ON-LOT
215-8{57}—
SANITARY SEWAGE DISPOSAL, PUBLIC
215-8{67}—
SUBDIVISION
215-8{76}—
WATER SUPPLY AND DISTRIBUTION SYSTEM, ON-LOT
ยงย 215-16—
Plans exempted from standard procedure.
ยงย 215-18—
Preliminary plans.
ยงย 215-19—
Final plan.
ยงย 215-22—
Block and lot design standards.
ยงย 215-23—
Street design standards.
ยงย 215-24—
Sanitary sewage disposal.
ยงย 215-25—
Water supply and distribution systems.
ยงย 215-27—
Underground utilities and easements.
ยงย 215-28—
Mobile home parks.
ยงย 215-29—
Environmental protection and open space preservation.
ยงย 215-31—
Required improvements.
ยงย 215-32—
Completion of improvements or guarantee thereof prerequisite to final plat approval.
ยงย 215-35—
Recording plats and deeds.
ยงย 215-37—
Effect of change in this chapter.
224-2{1}—
ALLEY
ยงย 234-36—
Parking time limited in certain locations certain days and hours.
ยงย 234-57—
Speed limits.
ยงย 234-58—
Traffic direction.
ยงย 234-65—
Tow-away zones designated.
Ch 250—
Zoning
250-7{2}—
ACCESSORY USE OR STRUCTURE
250-7{21}—
BLOCK
250-7{24}—
BUFFER
250-7{43}—
COURT and COURTYARD
250-7{51}—
DWELLING
250-7{58}—
FENCE
250-7{62}—
FRONTAGE
250-7{72}—
JUNKYARD
250-7{73}—
KENNEL
250-7{77}—
LOT
250-7{80}—
MOBILE HOME LOT
250-7{81}—
MOBILE HOME PARK
250-7{85}—
NONCONFORMING LOT
250-7{91}—
PARK AND RIDE FACILITIES
250-7{94}—
PARKING LOT
250-7{95}—
PARKING SPACE, AUTOMOBILE
250-7{104}—
PRINCIPAL USE
250-7{111}—
RESORT
250-7{130}—
VARIANCE
250-7{132}—
YARD
ยงย 250-10—
Interpretation of boundaries.
ยงย 250-11—
Intent and purpose of zoning districts.
ยงย 250-13—
Application of regulations.
ยงย 250-15—
Nonconforming uses and buildings.
ยงย 250-16—
Lot regulations and permitted deviations from required areas.
ยงย 250-17—
Unique lots and building locations.
ยงย 250-18—
Accessory structures and uses.
ยงย 250-19—
Off-street parking and loading.
ยงย 250-21—
Performance requirements.
ยงย 250-22—
Miscellaneous provisions.
ยงย 250-23—
Mobile homes.
ยงย 250-25—
Site plan review.
ยงย 250-28—
Family care facility and group care facility guidelines.
ยงย 250-29—
Miscellaneous use guidelines.
ยงย 250-30—
Provisions for wireless telecommunications, towers and antennas.
ยงย 250-31—
General procedure.
ยงย 250-32—
Zoning permit and Zoning Officer.
ยงย 250-37—
Appeal from Zoning Officer.
ยงย 250-38—
Public hearings and notice.
ยงย 250-41—
Jurisdiction and functions.