Index: U
Utilities
§ 105-9—
Administration and enforcement.
§ 125-2—
Intent.
§ 125-10—
Application procedures and requirements.
§ 125-24—
Elevation and floodproofing requirements.
§ 125-25—
Design and construction standards.
§ 125-28—
Special requirements for manufactured homes.
125-36{7}—
DEVELOPMENT
125-36{8}—
EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
125-36{9}—
EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
125-36{19}—
MANUFACTURED HOME
125-36{23}—
NEW MANUFACTURED HOME PARK OR SUBDIVISION
125-36{24}—
PERSON
§ 167-5—
Reservation for specific uses.
§ 167-11—
Equipment use.
§ 167-14—
Clothing.
§ 167-23—
Nonmembers/day passes.
§ 171-9—
Exclusions.
§ 180-1—
Property Maintenance Code adopted.
§ 188-4—
Residential rental unit registration, inspection and licensing process.
§ 188-5—
Residential rental unit registration.
190-3{4}—
BIOCHEMICAL OXYGEN DEMAND (BOD)
190-3{44}—
MONTHLY AVERAGE
§ 190-5—
Storm sewers.
§ 190-37—
Enforcement.
§ 203-3—
Purpose.
§ 203-14—
Drainage plan requirements.
§ 203-28—
Purpose.
203-35{6}—
CAPTURE/REUSE
203-35{52}—
PERSON
§ 203-45—
Drainage plan contents.
Ch 210 Art II—
Utility Installations and Appurtenances
§ 210-9—
Requirements for placement.
§ 210-11—
Abandonment of underground installations.
§ 210-12—
Location of new utility mains; extensions and replacement of existing mains.
§ 210-13—
Depth and location; maps and plans of underground installations; approval for encroachment in streets.
§ 210-14—
Borough's right to schedule installation of utility mains or trunks.
§ 210-16—
Nonexclusive rights or privileges.
§ 210-31—
Issuance of permits restricted.
§ 210-34—
Responsibility to contact utilities.
§ 210-40—
Work necessitating opening or excavation to be done prior to street improvement and not until five years thereafter; exception.
§ 210-42—
Conditions for laying and extending utility lines.
§ 210-62—
Placement and use regulations.
215-8{35}—
MOBILE HOME LOT
215-8{55}—
SANITARY SEWAGE DISPOSAL, CENTRALIZED
215-8{57}—
SANITARY SEWAGE DISPOSAL, PUBLIC
215-8{75}—
WATER SUPPLY AND DISTRIBUTION SYSTEM, CENTRALIZED
215-8{77}—
WATER SUPPLY AND DISTRIBUTION SYSTEM, PUBLIC
§ 215-12—
Submission of preliminary plans.
§ 215-18—
Preliminary plans.
§ 215-19—
Final plan.
§ 215-20—
Application of standards.
§ 215-21—
General standards.
§ 215-24—
Sanitary sewage disposal.
§ 215-25—
Water supply and distribution systems.
§ 215-27—
Underground utilities and easements.
§ 215-28—
Mobile home parks.
§ 215-31—
Required improvements.
§ 215-32—
Completion of improvements or guarantee thereof prerequisite to final plat approval.
§ 215-37—
Effect of change in this chapter.
Ch 228—
Utility Poles
§ 228-1—
Identification; annual license.
§ 228-3—
License required.
§ 246-2—
Permit required; signs prohibited on public property.
Ch 250—
Zoning
250-7{9}—
ALTERNATIVE TOWER STRUCTURE
250-7{12}—
ANTENNA
250-7{18}—
BACKHAUL NETWORK
250-7{51}—
DWELLING
250-7{65}—
HABITABLE SPACE (ROOM)
250-7{80}—
MOBILE HOME LOT
250-7{126}—
TOWER
250-7{129}—
UTILITY
§ 250-16—
Lot regulations and permitted deviations from required areas.
§ 250-17—
Unique lots and building locations.
§ 250-18—
Accessory structures and uses.
§ 250-19—
Off-street parking and loading.
§ 250-23—
Mobile homes.
§ 250-25—
Site plan review.
§ 250-30—
Provisions for wireless telecommunications, towers and antennas.
§ 250-56—
Curative amendments.
§ 250-58—
Exemptions.
§ 250-59—
Mediation option.
§ DT-1—
Derivation Table of 1993 Code to 2012 Code