Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Township of Pittsfield, MI
Washtenaw County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: I
# A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Improvements
ยงย 1-5— Certain provisions saved from repeal. ยงย 2-25— Capital improvements program. ยงย 2-35— Appropriation for general capital improvement prohibited. ยงย 5-3— Statement of purpose. ยงย 5-13— Notice to proceed. 8-14{11}— MINOR DRAINAGE ยงย 8-18— Activities and uses not requiring a permit under this article. ยงย 8-19— Wetlands use permits for prohibited activities. ยงย 12-5— Fees. 12-9{15}— DEVELOPMENT 12-9{19}— IMPROVEMENTS 12-9{44}— STREET 12-9{45}— STRUCTURE ยงย 12-12— Preliminary plat: final approval. ยงย 12-13— Final plat. ยงย 12-15— Streets and alleys. ยงย 12-17— Lots. ยงย 12-18— Pedestrianways and sidewalks. ยงย 12-21— Utilities. ยงย 12-27— Planned unit development. Ch 12 Art V— Subdivision Improvements ยงย 12-31— Purpose. ยงย 12-32— General. ยงย 12-33— Engineering drawings of improvements. ยงย 12-34— Required improvements. ยงย 12-35— Completion and performance guarantees. ยงย 12-36— Inspection of improvements. ยงย 12-37— Compliance with standards. ยงย 12-38— Acceptance. ยงย 12-41— Subdivision completion. ยงย 12-42— General. ยงย 12-47— Building and occupancy permits. ยงย 21-1— Findings. ยงย 28-8— Sidewalk Reserved Fund; payment in lieu of sidewalk/pathway construction. 28-12{8}— FIXTURE or FACILITIES ยงย 28-21— Use of public rights-of-way by permittee. ยงย 28-29— Construction. 30-1{7}— HOUSING DEVELOPMENT 30-7{5}— HOUSING DEVELOPMENT ยงย 30-18— Preamble. 30-19{5}— HOUSING DEVELOPMENT ยงย 30-28— Preamble. 30-29{5}— HOUSING PROJECT 36-2{5}— SYSTEM ยงย 36-4— Management and control; adoption of rules and policies; emergency purchases; Utilities Department. ยงย 36-7— Water rates and charges. ยงย 36-8— Sewer rates and charges. ยงย 36-11— Revision of rates, charges and fees. ยงย 36-12— General provisions. ยงย 36-14— Funds. ยงย 36-16— Permit required; application. ยงย 36-20— Approval of installation and construction. ยงย 36-22— Acceptance and dedication. 36-43{4}— BEST MANAGEMENT PRACTICES (BMP) ยงย 36-65— Funding. ยงย 36-82— Prohibited concentrations of certain pollutants and mercury reduction plan. ยงย Z-1.06— Conflict with other laws. Z-2.02{48}— CONSERVATION EASEMENT Z-2.02{104}— GOLF COURSE Z-2.02{208}— SUBSTANTIAL IMPROVEMENT ยงย Z-3.09— Performance guarantee. ยงย Z-3.10— Development agreements. ยงย Z-4.19— Supplemental dimensional regulations applicable to all districts. ยงย Z-5.01— General intent, purpose, and use. ยงย Z-5.02— Applicability and organization. ยงย Z-5.03— Standards applicable to all districts. ยงย Z-5.07— Ann Arbor-Saline Road Mixed-Use District. ยงย Z-5.08— Washtenaw Avenue Mixed-Use District. ยงย Z-6.01— Purpose. ยงย Z-6.02— Application requirements. ยงย Z-6.06— Planning and development regulations. ยงย Z-7.01— Site condominiums. ยงย Z-7.02— Open space preservation development option (OSPDO). ยงย Z-8.04— Temporary dwelling structures. ยงย Z-9.02— Building, structures and uses requiring site plan review. ยงย Z-9.05— Administrative plan review. ยงย Z-9.07— Data required for preliminary and final site plans. ยงย Z-9.08— Standards for site plan review. ยงย Z-9.11— Certification of compliance. ยงย Z-11.02— Agricultural processing and food storage. ยงย Z-11.03— Community supported agriculture (CSA) and farm markets. ยงย Z-11.13— Mobile home parks. ยงย Z-11.37— Extractive operations. ยงย Z-12.02— Access to public streets. ยงย Z-12.03— Access management regulations. ยงย Z-13.01— Intent. ยงย Z-13.02— Landscaping. ยงย Z-14.02— Performance standards. ยงย Z-14.07— Flood hazard regulations. ยงย Z-15.01— Purpose. ยงย Z-15.07— Permitted signs in form-based zoning districts. ยงย Z-17.06— Expansion of nonconforming buildings and structures. ยงย Z-18.06— Conditional rezoning procedures.
Inspections
ยงย 1-18— Publication; filing. ยงย 6-8— Fees. ยงย 6-10— Certificate of use and occupancy; temporary certificate. ยงย 6-20— Changes to standards. ยงย 6-23— Issuance of certificate of compliance. ยงย 6-24— Termination of certificate of compliance. ยงย 6-26— Inspection frequency. ยงย 6-27— Inspection procedures. ยงย 6-29— Fees. ยงย 6-30— Collection of fees. ยงย 6-31— Exemptions. ยงย 8-19— Wetlands use permits for prohibited activities. ยงย 8-21— Enforcement; violations and penalties. ยงย 8-46— Registration and reporting requirements and procedures for commercial applicators. ยงย 10-15— Fire suppression training. ยงย 10-18— Right of entry; inspection. Ch 10 Art III— Firesafety Inspections ยงย 10-20— Purpose. ยงย 10-22— Certificate of compliance required for firesafety. ยงย 10-23— Fees for inspections and reinspections. ยงย 10-25— Right of entry and inspection. ยงย 12-5— Fees. ยงย 12-13— Final plat. ยงย 12-33— Engineering drawings of improvements. ยงย 12-35— Completion and performance guarantees. ยงย 12-36— Inspection of improvements. ยงย 12-39— Fees. ยงย 14-45— Copies. ยงย 23-7— Inspection. ยงย 23-15— Loitering; exterior lighting and monitoring; interior lighting requirements. ยงย 24-6— Sale of pawned property at public auction; time, place, notice, affidavit of publication of notice. ยงย 24-19— Investigation of applicant; recommendations. ยงย 25-3— Regulations for operation. ยงย 25-11— Regulations for operation. ยงย 28-28— Miscellaneous. ยงย 30-15— Audits; inspection of records. ยงย 32-7— Consumer protection. ยงย 32-10— Maps, plats and reports. ยงย 32-11— Rights reserved to the Township. ยงย 32-12— Miscellaneous provisions. ยงย 32-29— Franchise authority review of basic cable rates and equipment costs. ยงย 32-31— Participation of interested parties. ยงย 32-34— Proprietary information. ยงย 34-2— Copies of statutes for inspection and purchase. ยงย 36-7— Water rates and charges. ยงย 36-8— Sewer rates and charges. ยงย 36-12— General provisions. 36-15{3}— ESCROW DEPOSIT ยงย 36-17— Fees and escrow deposit; delinquent accounts. ยงย 36-20— Approval of installation and construction. ยงย 36-28— Potable water contamination; right of entry; inspections. ยงย 36-29— Certificate of compliance. ยงย 36-30— Survey. ยงย 36-31— Periodic inspection. ยงย 36-38— Backflow prevention devices. ยงย 36-42— Applicability. ยงย 36-50— Powers of the PTUD. ยงย 36-51— Sampling and monitoring facilities may be required. ยงย 36-52— Right to access of facilities for inspection, sampling, records examination, record copying or other duties. ยงย 36-54— Confidentiality of information. ยงย 36-57— Powers and authority of inspectors. ยงย 36-58— Enforcement process. ยงย 36-62— Contents of pretreatment permit. ยงย 36-67— Classes of building sewer permits; application; fees. ยงย 36-75— Inspection; supervision of connection. ยงย 36-79— Grease, oil and sand interceptors. ยงย 36-82— Prohibited concentrations of certain pollutants and mercury reduction plan. ยงย 36-87— Accidental discharges. ยงย 36-94— Permit required; application; fees. ยงย 36-95— Inspection by Township. ยงย 36-101— Financial qualifications. ยงย 36-105— Operating agreement. ยงย 36-107— Inspection of multiple unit systems. ยงย Z-3.01— Purpose. ยงย Z-3.03— Duties of Zoning Administrator. ยงย Z-3.04— Certificate of zoning compliance. ยงย Z-3.09— Performance guarantee. ยงย Z-4.02— Provision for Official Zoning Map. ยงย Z-7.01— Site condominiums. ยงย Z-11.24— Massage therapy regulations. ยงย Z-11.38— Wireless communication facilities. ยงย Z-11.48— Medical Marihuana Overlay District. ยงย Z-11.49— Adult-Use Marihuana Overlay District. ยงย Z-13.02— Landscaping. ยงย Z-14.11— Wind energy conversion systems. ยงย Z-14.12— Solar energy collectors. ยงย Z-15.14— Permits and fees. ยงย Z-17.01— General regulations. ยงย DT-1— Derivation Table of 2015 Code to 2017 Code.