Index: S
Safety standards
§ 1-1003—
Recovery of Costs.
§ 1-1104—
Purpose.
§ 4-201—
Purpose.
§ 5-102—
Interpretation.
§ 5-104—
Additions, Insertions and Changes to the Building Code.
7-101{6}—
EXPLOSIVE
§ 7-102—
Permits Required.
§ 7-105—
Monitoring.
§ 7-302—
Revisions to Standards.
§ 8-101—
Authority.
§ 8-201—
Intent.
§ 8-303—
Duties and Responsibilities of Floodplain Administrator.
§ 8-802—
Variance Procedures and Conditions.
8-902{24}—
MINOR REPAIR
8-902{30}—
REGULATORY FLOOD ELEVATION
8-902{38}—
SUBSTANTIAL IMPROVEMENT
Ch 10—
Health and Safety
§ 10-301—
Intent.
10-302{3}—
CONSUMER FIREWORKS
§ 10-304—
Display Fireworks.
§ 10-307—
Stopping Fireworks for Violation or Public Safety.
§ 11-202—
Intent.
§ 13-101—
Findings and Purposes.
§ 13-401—
Authority; Findings; Construal of Provisions.
§ 13-406—
Conditions of Approval.
§ 13-505—
Annual Inspection.
§ 15-303—
Restrictions as to Weight and/or Size of Vehicles on Certain Streets and Bridges.
§ 15-409—
Residential Permit Parking.
§ 15-1102—
Pedestrian-Control Signal Locations Established.
§ 16-103—
Prohibited Conduct.
§ 18-101—
General Provisions.
§ 18-103—
Enforcement.
§ 18-201—
Short Title; Introduction; Purpose.
§ 18-222—
Wavier and Appeal Procedure.
§ 19-101—
Permit Required; Placement; Removal; Enforcement.
20-1011{1}—
ACT 90
§ 20-103—
Standards for Collection and Transportation.
§ 20-203—
Separation of Recyclables; Placement for Disposal.
§ 21-201—
Purposes.
§ 21-235—
Inspection of Work.
§ 21-238—
Permits for Emergency Repairs.
§ 21-304—
Standards of Service.
§ 22-102—
Purpose.
§ 22-104—
Interpretation.
§ 22-901—
Application.
§ 22-907—
Streets.
§ 22-911—
Traffic Calming.
§ 22-920—
Landscaping Requirements.
§ 25-112—
Public Tree Care.
§ 25-114—
Pruning, Corner Clearance.
§ 26-101—
Statement of Findings.
§ 26-102—
Purpose.
§ 26-105—
Exemptions.
26-111E.{55}—
FREEBOARD
§ 26-121—
General Requirements for Stormwater Management.
§ 26-124—
Volume Control Standards: Neshaminy Creek Watershed.
§ 26-129—
Design Criteria for Stormwater Management Facilities and Best Management Practices.
§ 26-131—
Standards During Land Disturbance.
§ 26-138—
Plan Submission.
§ 26-182—
Notification.
§ 26-205—
Sealing and Abandonment.
§ 26-602—
Purpose.
§ 27-103—
Community Development Objectives.
§ 27-104—
Interpretation.
27-202{28}—
CONSUMER FIREWORKS
27-202{39}—
EMERGENCY
27-202{103}—
SMALL WIRELESS COMMUNICATIONS FACILITY or SMALL WCF
§ 27-302—
Uses by Right, Special Exception, Conditional Use and Uses Not Permitted.
§ 27-304—
Use Regulations.
§ 27-504—
Farm Activities.
§ 27-1601—
Purpose.
§ 27-2101—
Purpose.
§ 27-2317—
Historic Resources Preservation.
§ 27-2320—
Lighting.
§ 27-2505—
Off-Street Loading.
27-2602{18}—
GOVERNMENTAL SIGN
27-2602{36}—
TRAFFIC SIGN
§ 27-2603—
Sign Regulations Applicable to All Districts.
§ 27-2803—
Application Requirements for Zoning Permits.
§ 27-2909—
Special Exceptions.
§ D-101—
Governmental And Intergovernmental Affairs
§ KO-101—
Key To The Disposition Of All Ordinances.
Salaries and compensation
Sales
10-302{3}—
CONSUMER FIREWORKS
§ 10-304—
Display Fireworks.
§ 10-306—
Agricultural purposes.
§ 11-203—
Disclosure Requirements.
§ 11-204—
Residential Disclosure Statement.
§ 11-205—
Plan of Lot.
13-102{1}—
GARAGE OR YARD SALE
13-102{3}—
PEDDLING or SOLICITING
§ 13-108—
Exceptions for Noncommercial Peddlers.
§ 15-1002—
Restrictions on Use of Pushcarts.
§ 16-103—
Prohibited Conduct.
18-401{7}—
GARBAGE
20-1011{17}—
RECYCLING
20-201{22}—
RECYCLING
21-301{8}—
GROSS REVENUE
§ 22-106—
Subdivision and Land Development Control.
§ 22-501—
Submission and Review Procedure.
§ 22-705—
Acknowledgments.
§ 22-920—
Landscaping Requirements.
§ 22-931—
Open Space.
27-202{74}—
NFPA 1124
27-202{77}—
NOVELTIES
27-202{120}—
VAPE STORE
§ 27-304—
Use Regulations.
27-3044C.{13}—
TIMBER HARVESTING, TREE HARVESTING or LOGGING
§ 27-1402—
Permitted Uses.
§ 27-1502—
Permitted Uses.
§ 27-2320—
Lighting.
§ 27-2404—
Open Space.
§ 27-2504—
Parking Requirements.
27-2602{35}—
TEMPORARY SIGNS
§ 27-2605—
Signs Permitted in Residential Districts.
§ 27-2803—
Application Requirements for Zoning Permits.
§ 27-2811—
Transferable Development Rights.
§ F-101—
Public Property.
§ G-101—
Sewers.
Sanitary facilities
School crossing guards
Schools
13-402{2}—
PUBLIC GATHERING
§ 15-201—
Maximum Speed Limits Established on Certain Streets.
§ 15-205—
Traffic Signals at Certain Locations.
§ 15-303—
Restrictions as to Weight and/or Size of Vehicles on Certain Streets and Bridges.
15-4092{4}—
RESIDENTIAL AREA
§ 18-415—
Grease Interceptors Required.
20-1011{10}—
INSTITUTIONAL ESTABLISHMENT
20-201{11}—
INSTITUTION ESTABLISHMENT
§ 22-925—
Public Water Supply.
§ 22-936—
Traffic Impact Analysis.
§ 24-104—
Individuals Under Age 16 Exempt From Tax.
§ 24-402—
Requirement for Exemption to be Effective.
§ 24-404—
Effective Date of Millage Rate Freeze.
§ 27-103—
Community Development Objectives.
27-202{1}—
ACADEMIC CLINICAL RESEARCH CENTER
§ 27-304—
Use Regulations.
§ 27-602—
Uses Permitted.
§ 27-702—
Permitted Uses.
§ 27-802—
Permitted Uses.
§ 27-902—
Permitted Uses.
§ 27-1202—
Permitted Uses.
§ 27-1402—
Permitted Uses.
§ 27-1702—
Permitted Uses.
§ 27-2504—
Parking Requirements.
§ 27-2605—
Signs Permitted in Residential Districts.
§ 27-2609—
Off-Premises and Directional Signs.
§ 27-2811—
Transferable Development Rights.
§ B-101—
Bond Issues And Loans
§ D-101—
Governmental And Intergovernmental Affairs
§ E-101—
Plan Approval.
Screens and screening
§ 8-502—
Elevation and Floodproofing Requirements.
22-202{14}—
BUFFER
§ 22-904—
Lots.
§ 22-917—
Parking and Loading.
§ 22-920—
Landscaping Requirements.
27-202{13}—
BUFFER
§ 27-304—
Use Regulations.
§ 27-2309—
Special Setbacks.
§ 27-2320—
Lighting.
§ 27-2405—
Buffers.
§ 27-2505—
Off-Street Loading.
§ 27-2606—
Signs Permitted in Commercial Districts: C-1, C-2, and C-3.
§ 27-2803—
Application Requirements for Zoning Permits.
Security standards
§ 1-604—
Retirement Pension Payable from the Police Pension Fund; Calculation.
§ 1-605—
Disability Pension.
§ 1-801—
Use of Fire Insurance Proceeds.
§ 4-202—
Knox-Boxes®.
§ 7-201—
Regulations.
§ 7-302—
Revisions to Standards.
§ 8-503—
Design and Construction Standards.
§ 10-401—
Authority to Arrest Without Warrant.
§ 13-505—
Annual Inspection.
§ 15-410—
Violations and Penalties.
§ 16-103—
Prohibited Conduct.
§ 16-105—
Permits for Group Activities.
§ 18-102—
Regulations.
§ 18-207—
Inspections.
§ 18-212—
Disposal of Septage.
§ 18-216—
Holding Tanks.
§ 18-220—
Sewage Maintenance Agreements; Fees.
§ 18-222—
Wavier and Appeal Procedure.
§ 18-416—
Discharge of Stormwater Through Sewer Laterals Prohibited.
§ 20-102—
Prohibited Activities.
§ 21-214—
Application for Approval.
§ 21-222—
Permit Required.
§ 21-306—
Insurance, Indemnification and Bonds or Other Surety.
§ 22-106—
Subdivision and Land Development Control.
22-202{84}—
SUBSTANTIALLY COMPLETED
§ 22-501—
Submission and Review Procedure.
§ 22-901—
Application.
§ 22-905—
Lane Lots.
§ 22-907—
Streets.
§ 22-920—
Landscaping Requirements.
§ 22-921—
Reforestation/Afforestation.
§ 22-1001—
General Provisions and Compliance.
Ch 22 Pt 12—
COMPLETION OF REQUIRED IMPROVEMENTS CONTRACTS AND SECURITY
§ 22-1201—
Completion of Improvements.
§ 22-1202—
Acceptable Security.
§ 22-1203—
Amount of Security.
§ 22-1204—
Completion in Stages or Phases.
§ 22-1205—
Releases of Escrow.
§ 22-1206—
Retention of Financial Security.
§ 22-1207—
Maintenance Guarantee.
§ 22-1208—
Remedies to Effect Completion of Improvements.
§ 24-401—
Categories of Real Property Exempt from Real Estate Tax Millage Increases.
§ 26-108—
Compatibility with Other Ordinance Requirements.
§ 26-121—
General Requirements for Stormwater Management.
§ 26-129—
Design Criteria for Stormwater Management Facilities and Best Management Practices.
§ 26-183—
Enforcement.
§ 26-203—
Well Construction Requirements.
§ 26-204—
Well Depletion Agreement.
§ 27-304—
Use Regulations.
§ 27-603—
Area and Dimensional Requirements.
§ 27-704—
Development Standards.
§ 27-1103—
Area and Dimensional Requirements.
§ 27-1204—
Development Standards.
§ 27-1603—
Area and Dimensional Requirements.
§ 27-2107—
Permits.
§ 27-2312—
Storage and Waste Disposal.
§ 27-2320—
Lighting.
§ 27-2502—
Reservation of Area for Nonresidential Parking Spaces.
§ 27-2604—
Administration and Signs Exempt from Permits.
§ 27-2802—
Zoning Permits Required.
§ 27-2811—
Transferable Development Rights.
§ 27-2906—
Time Limitations.
§ 27-3001—
Appeals and Jurisdiction.
§ F-101—
Public Property.
Senior citizens
Septic systems
Septic tanks
18-2021{13}—
EVIDENCE OF MALFUNCTION
18-2021{21}—
MAINTENANCE
§ 18-206—
Sewage System Maintenance.
§ 18-208—
Operation.
§ 18-216—
Holding Tanks.
18-301{15}—
SEPTIC TANK
§ 18-302—
Use of Public Sewers Required.
§ 18-310—
Duties and Responsibilities of Others.
§ 26-137—
Stormwater Management Plan Contents and Requirements.
Service stations
Setbacks
§ 5-104—
Additions, Insertions and Changes to the Building Code.
§ 5-302—
Revisions.
§ 11-203—
Disclosure Requirements.
§ 11-204—
Residential Disclosure Statement.
§ 18-214—
Individual Residential Spray Irrigation Systems (IRSIS).
§ 18-218—
Community Sewage Systems.
22-202{17}—
BUILDING SETBACK LINES or BUILDING LINE
22-202{45}—
LOT
22-202{67}—
SETBACK
§ 22-502—
Preliminary Plan Requirements.
§ 22-603—
Final Plan Requirements (Minor Subdivision).
§ 22-705—
Acknowledgments.
§ 22-904—
Lots.
§ 22-905—
Lane Lots.
§ 22-917—
Parking and Loading.
§ 22-918—
Curbs, Sidewalks, Crosswalks and Bicycle Paths.
§ 22-919—
Monuments.
§ 26-105—
Exemptions.
§ 26-134—
Riparian Buffers.
§ 26-137—
Stormwater Management Plan Contents and Requirements.
27-202{18}—
BUILDING ENVELOPE
27-202{21}—
BUILDING SETBACK LINE, FRONT
27-202{22}—
BUILDING SETBACK LINE, REAR
27-202{23}—
BUILDING SETBACK LINE, SIDE
27-202{66}—
LOT WIDTH
27-202{95}—
SETBACK
§ 27-304—
Use Regulations.
§ 27-703—
Area and Dimensional Requirements.
§ 27-704—
Development Standards.
§ 27-1003—
Area and Dimensional Requirements.
§ 27-1103—
Area and Dimensional Requirements.
§ 27-1203—
Area and Dimensional Requirements.
§ 27-1204—
Development Standards.
§ 27-1603—
Area and Dimensional Requirements.
§ 27-1803—
Area and Dimensional Requirements.
§ 27-2304—
Exceptions to Minimum Lot Area and Width.
§ 27-2305—
Accessory Buildings or Structures in Yards.
§ 27-2309—
Special Setbacks.
§ 27-2317—
Historic Resources Preservation.
§ 27-2401—
Natural Resource Protection.
§ 27-2402—
Application of Natural Resource Protection Standards.
§ 27-2404—
Open Space.
§ 27-2501—
General Requirements.
§ 27-2502—
Reservation of Area for Nonresidential Parking Spaces.
§ 27-2503—
Design Standards for Off-Street Parking.
§ 27-2505—
Off-Street Loading.
§ 27-2609—
Off-Premises and Directional Signs.
27-2701{2}—
NONCONFORMING STRUCTURE
§ 27-2704—
Expansion of Nonconforming Uses and Structures.
§ 27-2909—
Special Exceptions.
Sewage disposal, individual
Sewage disposal, private
Shade trees
Ch 1 Pt 3 Art B—
Shade Tree Commission.
§ 1-311—
Creation of Commission, Membership, Powers, Duties and Obligations.
§ 1-312—
Appointments; Terms of Office.
§ 1-313—
General Powers.
§ 1-314—
Maintenance by Township.
§ 1-316—
Annual Report.
21-205{5}—
STREET
§ 22-920—
Landscaping Requirements.
§ 22-1202—
Acceptable Security.
§ KO-101—
Key To The Disposition Of All Ordinances.
Sheds
Shopping center districts
Shopping centers
§ 7-302—
Revisions to Standards.
§ 15-205—
Traffic Signals at Certain Locations.
20-1011{5}—
COMMERCIAL ESTABLISHMENT
20-201{3}—
COMMERCIAL ESTABLISHMENT
§ 27-106—
Establishment of Districts.
27-202{75}—
NONRESIDENTIAL ZONING DISTRICTS
§ 27-304—
Use Regulations.
§ 27-1402—
Permitted Uses.
Ch 27 Pt 15—
C-3 PLANNED SHOPPING CENTER
§ 27-1502—
Permitted Uses.
§ 27-1503—
Area and Dimensional Requirements.
§ 27-2320—
Lighting.
§ 27-2405—
Buffers.
§ 27-2504—
Parking Requirements.
§ 27-2606—
Signs Permitted in Commercial Districts: C-1, C-2, and C-3.
§ D-101—
Governmental And Intergovernmental Affairs
Shrubs
§ 11-203—
Disclosure Requirements.
§ 11-204—
Residential Disclosure Statement.
§ 11-205—
Plan of Lot.
§ 16-103—
Prohibited Conduct.
18-2021{13}—
EVIDENCE OF MALFUNCTION
§ 18-218—
Community Sewage Systems.
22-202{14}—
BUFFER
§ 22-904—
Lots.
§ 22-907—
Streets.
§ 22-909—
Intersections.
§ 22-920—
Landscaping Requirements.
§ 22-921—
Reforestation/Afforestation.
25-101{1}—
STREET TREES
25-101{2}—
PARK TREES
§ 25-105—
Duties and Responsibilities.
§ 25-112—
Public Tree Care.
§ 25-114—
Pruning, Corner Clearance.
§ 26-134—
Riparian Buffers.
§ 26-303—
Water Use Mandatory Restrictions; Prohibited Nonessential Water Uses.
27-202{13}—
BUFFER
§ 27-304—
Use Regulations.
27-3044C.{10}—
SLASH
§ 27-1603—
Area and Dimensional Requirements.
§ 27-2308—
Visibility at Corners: Clear Sight Triangles.
§ 27-2309—
Special Setbacks.
§ 27-2320—
Lighting.
§ 27-2405—
Buffers.
§ 27-2609—
Off-Premises and Directional Signs.
§ 27-2811—
Transferable Development Rights.
Signs
§ 1-603—
Policemen to Join Police Pension Fund; Contributions by Policemen to the Fund.
§ 1-610.1—
Deferred Retirement Option Plan.
§ 1-801—
Use of Fire Insurance Proceeds.
§ 5-104—
Additions, Insertions and Changes to the Building Code.
§ 5-302—
Revisions.
§ 7-302—
Revisions to Standards.
§ 8-308—
Placards.
§ 11-203—
Disclosure Requirements.
§ 11-204—
Residential Disclosure Statement.
§ 11-205—
Plan of Lot.
§ 13-103—
Posting.
§ 13-105—
Prohibition Against Entering Upon Posted Property.
§ 13-202—
Alarm Systems.
§ 13-405—
Application for Permit; Fee.
§ 13-411—
Signs.
§ 15-104—
Temporary and Emergency Regulations.
§ 15-105—
Experimental Regulations.
§ 15-106—
Traffic on Streets Closed or Restricted for Construction, Maintenance or Special Events.
§ 15-212—
Through Highways Established.
§ 15-213—
Stop Intersections Established.
§ 15-214—
Yield Intersections Established.
§ 15-219—
Brake Retarder Prohibition at Certain Locations.
§ 15-301—
Vehicle Weight Limits Established on Certain Streets and Bridges.
§ 15-303—
Restrictions as to Weight and/or Size of Vehicles on Certain Streets and Bridges.
§ 15-409—
Residential Permit Parking.
§ 15-603—
Reserved Parking Spaces for Handicapped May be Provided.
§ 15-702—
Reserved Parking Spaces for Handicapped May be Provided.
§ 15-803—
Tow-Away Zones Designated.
§ 15-1002—
Restrictions on Use of Pushcarts.
§ 15-1101—
Pedestrians to Obey Traffic-Control Signs.
§ 16-103—
Prohibited Conduct.
§ 16-108—
Posting of Areas Designated for Particular Activities.
§ 18-208—
Operation.
§ 18-216—
Holding Tanks.
Ch 19—
Signs and Billboards
Ch 19 Pt 1—
BANNERS, SIGNS AND OTHER ADVERTISING DEVICES
§ 19-101—
Permit Required; Placement; Removal; Enforcement.
§ 20-103—
Standards for Collection and Transportation.
§ 21-210—
Approval of Plans.
§ 21-214—
Application for Approval.
§ 22-106—
Subdivision and Land Development Control.
§ 22-502—
Preliminary Plan Requirements.
§ 22-706—
Recording of Final Plan.
§ 22-804—
Recording of Final Plan.
§ 22-914—
Street and Stop Signs.
§ 22-918—
Curbs, Sidewalks, Crosswalks and Bicycle Paths.
§ 22-920—
Landscaping Requirements.
§ 22-936—
Traffic Impact Analysis.
§ 22-937—
Tree Protection Standards.
§ 22-1201—
Completion of Improvements.
§ 22-1401—
Stormwater Capital Contribution.
§ 25-114—
Pruning, Corner Clearance.
§ 26-137—
Stormwater Management Plan Contents and Requirements.
§ 26-162—
Maintenance Responsibilities.
§ 26-164—
Maintenance Agreement for Privately Owned Stormwater BMPs.
§ 26-165—
Stormwater Management Easements.
27-202{54}—
IMPERVIOUS SURFACE
§ 27-304—
Use Regulations.
§ 27-2320—
Lighting.
§ 27-2405—
Buffers.
§ 27-2503—
Design Standards for Off-Street Parking.
Ch 27 Pt 26—
SIGNS
§ 27-2601—
Purpose.
27-2602{1}—
ABANDONED SIGN
27-2602{2}—
ADDRESS SIGN
27-2602{3}—
ALTERATION
27-2602{4}—
APPLICANT
27-2602{5}—
AREA OF A SIGN
27-2602{6}—
AWNING SIGN
27-2602{7}—
BANNER SIGN
27-2602{8}—
BUILDING OR WALL SIGN
27-2602{9}—
CANOPY SIGN
27-2602{10}—
DEVELOPMENT IDENTIFICATION SIGN
27-2602{11}—
DIRECTIONAL SIGN
27-2602{12}—
DOUBLE-FACED SIGN
27-2602{13}—
ELECTRONIC MESSAGE CENTER SIGN
27-2602{14}—
EMERGENCY SIGN
27-2602{15}—
FREESTANDING SIGN
27-2602{17}—
GATEWAY SIGN
27-2602{18}—
GOVERNMENTAL SIGN
27-2602{19}—
ILLUMINATION
27-2602{20}—
INCIDENTAL SIGN
27-2602{21}—
MARQUEE SIGN
27-2602{22}—
MOBILE SIGN
27-2602{23}—
MONUMENT SIGN
27-2602{24}—
NONCONFORMING SIGN
27-2602{25}—
OFF-PREMISES SIGN
27-2602{26}—
ON-PREMISES SIGN
27-2602{27}—
PERMANENT SIGN
27-2602{28}—
POLE SIGN
27-2602{29}—
POLITICAL SIGN
27-2602{30}—
PROJECTING SIGN
27-2602{31}—
ROOF SIGN
27-2602{32}—
SANDWICH BOARD SIGN
27-2602{33}—
SCOREBOARD
27-2602{34}—
SIGN
27-2602{35}—
TEMPORARY SIGNS
27-2602{36}—
TRAFFIC SIGN
27-2602{37}—
WALL SIGN
27-2602{38}—
WARNING SIGN
27-2602{39}—
WINDOW SIGN
§ 27-2603—
Sign Regulations Applicable to All Districts.
§ 27-2604—
Administration and Signs Exempt from Permits.
§ 27-2605—
Signs Permitted in Residential Districts.
§ 27-2606—
Signs Permitted in Commercial Districts: C-1, C-2, and C-3.
§ 27-2607—
Signs Permitted in Industrial Districts: LI and Q.
§ 27-2608—
Signs Permitted in VR and VC Village Districts.
§ 27-2609—
Off-Premises and Directional Signs.
27-2701{2}—
NONCONFORMING STRUCTURE
§ 27-2704—
Expansion of Nonconforming Uses and Structures.
§ 27-2803—
Application Requirements for Zoning Permits.
§ 27-2805—
Life of a Permit.
§ D-101—
Governmental And Intergovernmental Affairs
§ KO-101—
Key To The Disposition Of All Ordinances.
Single-family dwellings
§ 13-506—
Applicability.
§ 18-414—
Service Regulations.
§ 22-508—
Water Resources Impact Study.
§ 22-921—
Reforestation/Afforestation.
§ 26-105—
Exemptions.
27-202{71}—
MOBILE HOME or MANUFACTURED HOME
§ 27-304—
Use Regulations.
§ 27-1103—
Area and Dimensional Requirements.
§ 27-2320—
Lighting.
Site plan review
Site plans
§ 5-104—
Additions, Insertions and Changes to the Building Code.
§ 5-205—
Existing Ordinances.
§ 18-220—
Sewage Maintenance Agreements; Fees.
§ 22-502—
Preliminary Plan Requirements.
§ 22-504—
Notification of Surrounding Property Owners.
§ 22-603—
Final Plan Requirements (Minor Subdivision).
§ 22-703—
Final Plan Requirements.
§ 22-803—
Plan Requirements.
§ 22-904—
Lots.
26-111E.{135}—
STORMWATER MANAGEMENT (SWM) SITE PLAN
§ 26-121—
General Requirements for Stormwater Management.
§ 26-124—
Volume Control Standards: Neshaminy Creek Watershed.
§ 26-139—
Stormwater Management Plan Review.
§ 27-304—
Use Regulations.
§ 27-2317—
Historic Resources Preservation.
§ 27-2402—
Application of Natural Resource Protection Standards.
§ 27-2606—
Signs Permitted in Commercial Districts: C-1, C-2, and C-3.
§ 27-2909—
Special Exceptions.
§ G-101—
Sewers.
Sketch plans
§ 13-405—
Application for Permit; Fee.
§ 22-301—
Review and Approval Stages.
§ 22-304—
Review by the Environmental Advisory Council.
Ch 22 Pt 4—
PRESUBMISSION SKETCH PLAN
§ 22-401—
Purpose.
§ 22-402—
Submission and Review Procedure.
§ 22-403—
Suggested Plan Data (Minor Subdivision).
§ 22-404—
Suggested Plan Data (Major Subdivision or Land Development).
§ 22-507—
Site Analysis and Resource Conservation Plan Required.
§ 27-2811—
Transferable Development Rights.
Smoke
Smoke detectors
Smoking
Snow and ice removal
Social security
Soil erosion and sediment control
Solar collectors
Solar energy systems
Special exceptions
§ 22-403—
Suggested Plan Data (Minor Subdivision).
§ 22-404—
Suggested Plan Data (Major Subdivision or Land Development).
§ 22-502—
Preliminary Plan Requirements.
§ 22-603—
Final Plan Requirements (Minor Subdivision).
§ 22-803—
Plan Requirements.
27-202{106}—
SPECIAL EXCEPTION
§ 27-302—
Uses by Right, Special Exception, Conditional Use and Uses Not Permitted.
§ 27-303—
Uses Subject to Other Regulations.
§ 27-304—
Use Regulations.
§ 27-402—
Uses Permitted.
§ 27-502—
Uses Permitted.
§ 27-602—
Uses Permitted.
§ 27-702—
Permitted Uses.
§ 27-704—
Development Standards.
§ 27-802—
Permitted Uses.
§ 27-902—
Permitted Uses.
§ 27-1002—
Permitted Uses.
§ 27-1102—
Permitted Uses.
§ 27-1202—
Permitted Uses.
§ 27-1204—
Development Standards.
§ 27-1302—
Permitted Uses.
§ 27-1402—
Permitted Uses.
§ 27-1502—
Permitted Uses.
§ 27-1602—
Permitted Uses.
§ 27-1702—
Permitted Uses.
§ 27-1802—
Permitted Uses.
§ 27-2320—
Lighting.
§ 27-2609—
Off-Premises and Directional Signs.
§ 27-2704—
Expansion of Nonconforming Uses and Structures.
§ 27-2801—
Zoning Officer; Duties and Powers.
§ 27-2804—
Fees and Escrow Deposits.
§ 27-2810—
Procedures for Conditional Uses.
§ 27-2903—
Jurisdiction of Zoning Hearing Board and Board of Supervisors.
§ 27-2905—
Parties Appellant before the Zoning Hearing Board.
§ 27-2909—
Special Exceptions.
§ 27-2911—
Expiration of Special Exceptions and Variances.
§ 27-2912—
Enforceability of Special Exceptions/Variance Conditions.
Special permits
Speed limits
§ 15-201—
Maximum Speed Limits Established on Certain Streets.
§ 15-202—
Maximum Speed Limits Established on Certain Bridges and Elevated Structures.
§ 15-203—
Maximum Speed Limits Established for Certain Vehicles on Hazardous Grades.
§ 15-204—
Maximum Speed Limits Established in Parks.
§ 22-907—
Streets.
§ 22-914—
Street and Stop Signs.
Sprinklers
Sprinkler systems
Steep slopes
§ 11-203—
Disclosure Requirements.
§ 11-204—
Residential Disclosure Statement.
22-202{76}—
STEEP SLOPES
§ 22-303—
Site Inspections.
§ 22-502—
Preliminary Plan Requirements.
§ 22-603—
Final Plan Requirements (Minor Subdivision).
§ 22-907—
Streets.
§ 22-920—
Landscaping Requirements.
§ 22-921—
Reforestation/Afforestation.
§ 26-101—
Statement of Findings.
§ 26-105—
Exemptions.
§ 26-125—
Nonstructural Project Design: Sequencing to Minimize Stormwater Impacts.
§ 26-137—
Stormwater Management Plan Contents and Requirements.
§ 27-2401—
Natural Resource Protection.
§ 27-2402—
Application of Natural Resource Protection Standards.
§ 27-2811—
Transferable Development Rights.
Stop intersections
Stop work orders
Storage
§ 8-304—
Application Procedures and Requirements.
§ 8-502—
Elevation and Floodproofing Requirements.
§ 8-503—
Design and Construction Standards.
§ 8-504—
Development Which May Endanger Human Life.
8-902{8}—
DEVELOPMENT
8-902{20}—
LOWEST FLOOR
8-902{33}—
STRUCTURE
§ 10-102—
Nuisances Prohibited.
10-201{2}—
INDUSTRIAL ACCIDENT
§ 10-304—
Display Fireworks.
§ 15-804—
Designation of Approved Storage Garages; Bonding; Towing and Storage.
§ 15-805—
Payment of Towing and Storage Charges.
§ 15-806—
Reclamation Cost.
§ 15-807—
Records of Vehicles Removed and Impounded.
§ 15-810—
Reports and Disposition of Unclaimed Vehicles.
18-301{4}—
CESSPOOL
18-401{7}—
GARBAGE
§ 20-203—
Separation of Recyclables; Placement for Disposal.
§ 20-206—
Violations and Penalties.
§ 21-107—
Removal and Impoundment.
§ 21-108—
Abandoned Vehicles.
§ 21-303—
Grant of Privilege; Exemptions.
22-202{42}—
LAND DEVELOPMENT
§ 22-508—
Water Resources Impact Study.
§ 22-907—
Streets.
§ 22-920—
Landscaping Requirements.
§ 22-925—
Public Water Supply.
§ 22-931—
Open Space.
§ 22-935—
As-Built Drawings.
§ 26-104—
Applicability.
§ 26-105—
Exemptions.
26-111E.{65}—
HYDROLOGIC REGIME, NATURAL
26-111E.{102}—
PRETREATMENT
26-111E.{131}—
STORAGE INDICATION METHOD
§ 26-121—
General Requirements for Stormwater Management.
§ 26-123—
Volume Controls: All Watersheds.
§ 26-127—
Additional Requirements Applicable to Infiltration-Oriented Stormwater Management Systems: Delaware River South and Tohickon Creek Watersheds.
§ 26-130—
Calculation Methodology.
§ 26-131—
Standards During Land Disturbance.
§ 26-202—
Well Drilling Permit.
§ 26-203—
Well Construction Requirements.
27-202{74}—
NFPA 1124
27-202{81}—
PORTABLE HOME STORAGE
27-202{105}—
SOLAR ENERGY SYSTEM
27-202{126}—
WIRELESS ACCESSORY EQUIPMENT
§ 27-304—
Use Regulations.
§ 27-504—
Farm Activities.
§ 27-1402—
Permitted Uses.
§ 27-1502—
Permitted Uses.
§ 27-1602—
Permitted Uses.
§ 27-1603—
Area and Dimensional Requirements.
§ 27-1702—
Permitted Uses.
§ 27-2204—
Uses Permitted in Floodplain.
§ 27-2312—
Storage and Waste Disposal.
§ 27-2405—
Buffers.
§ 27-2501—
General Requirements.
Stormwater
§ 5-104—
Additions, Insertions and Changes to the Building Code.
§ 8-503—
Design and Construction Standards.
§ 11-203—
Disclosure Requirements.
§ 11-204—
Residential Disclosure Statement.
§ 11-205—
Plan of Lot.
18-1013{27}—
STORMWATER
§ 18-102—
Regulations.
§ 18-206—
Sewage System Maintenance.
18-301{13}—
SANITARY SEWER
18-301{16}—
SEWAGE
18-301{17}—
STORM SEWER
§ 18-311—
Maintenance Standards.
§ 18-412—
Prohibited Wastes.
§ 18-416—
Discharge of Stormwater Through Sewer Laterals Prohibited.
22-202{50}—
OPEN SPACE
§ 22-303—
Site Inspections.
§ 22-502—
Preliminary Plan Requirements.
§ 22-507—
Site Analysis and Resource Conservation Plan Required.
§ 22-603—
Final Plan Requirements (Minor Subdivision).
§ 22-706—
Recording of Final Plan.
§ 22-904—
Lots.
§ 22-905—
Lane Lots.
§ 22-906—
Easements.
§ 22-916—
Driveways.
§ 22-918—
Curbs, Sidewalks, Crosswalks and Bicycle Paths.
§ 22-919—
Monuments.
§ 22-921—
Reforestation/Afforestation.
§ 22-923—
Stormwater Management.
§ 22-924—
Excavation and Grading.
§ 22-932—
Construction Sequence.
§ 22-935—
As-Built Drawings.
§ 22-1002—
General Performance Standards.
§ 22-1101—
Recreation Land/Fee Requirements.
§ 22-1401—
Stormwater Capital Contribution.
Ch 26 Pt 1—
STORMWATER MANAGEMENT
§ 26-101—
Statement of Findings.
§ 26-102—
Purpose.
§ 26-104—
Applicability.
§ 26-105—
Exemptions.
§ 26-108—
Compatibility with Other Ordinance Requirements.
26-111E.{9}—
BEST MANAGEMENT PRACTICE (BMP)
26-111E.{10}—
BIORENTENTION
26-111E.{12}—
CHANNEL
26-111E.{21}—
DESIGN STORM
26-111E.{23}—
DETENTION BASIN
26-111E.{33}—
DISCONNECTED IMPERVIOUS AREA (DIA)
26-111E.{37}—
DRAINAGE CONVEYANCE FACILITY
26-111E.{38}—
DRAINAGE EASEMENT
26-111E.{41}—
EMERGENCY SPILLWAY
26-111E.{48}—
EXISTING RECHARGE AREA
26-111E.{58}—
GREEN INFRASTRUCTURE
26-111E.{63}—
HOT SPOT
26-111E.{65}—
HYDROLOGIC REGIME, NATURAL
26-111E.{69}—
IMPOUNDMENT
26-111E.{78}—
LOW IMPACT DEVELOPMENT (LID)
26-111E.{84}—
NONSTORMWATER DISCHARGES
26-111E.{87}—
OPEN CHANNEL
26-111E.{91}—
PARENT TRACT
26-111E.{92}—
PEAK DISCHARGE
26-111E.{98}—
PIPE
26-111E.{100}—
POINT SOURCE
26-111E.{101}—
POST-CONSTRUCTION
26-111E.{102}—
PRETREATMENT
26-111E.{107}—
RECHARGE AREA
26-111E.{108}—
RECHARGE VOLUME
26-111E.{112}—
RETENTION BASIN
26-111E.{125}—
SEPARATE STORM SEWER SYSTEM
26-111E.{126}—
SHALLOW CONCENTRATED FLOW
26-111E.{133}—
STORM SEWER
26-111E.{134}—
STORMWATER
26-111E.{135}—
STORMWATER MANAGEMENT (SWM) SITE PLAN
26-111E.{136}—
STORMWATER MANAGEMENT FACILITY
26-111E.{137}—
STORMWATER MANAGEMENT PERMIT
26-111E.{138}—
STORMWATER MANAGEMENT PLAN
26-111E.{139}—
STREAM
26-111E.{140}—
STREAM BANK EROSION
26-111E.{143}—
SUBAREA or SUBWATERSHED
26-111E.{151}—
VOLUMETRIC RUNOFF COEFFICIENT
Ch 26 Pt 1 Art C—
Stormwater Management.
§ 26-121—
General Requirements for Stormwater Management.
§ 26-122—
Stormwater Management Districts: Peak Rate Control.
§ 26-123—
Volume Controls: All Watersheds.
§ 26-124—
Volume Control Standards: Neshaminy Creek Watershed.
§ 26-125—
Nonstructural Project Design: Sequencing to Minimize Stormwater Impacts.
§ 26-126—
Water Quality Requirements: Delaware River South and Tohickon Creek Watersheds.
§ 26-127—
Additional Requirements Applicable to Infiltration-Oriented Stormwater Management Systems: Delaware River South and Tohickon Creek Watersheds.
§ 26-128—
Stream Bank Erosion Requirements: All Watersheds.
§ 26-129—
Design Criteria for Stormwater Management Facilities and Best Management Practices.
§ 26-130—
Calculation Methodology.
§ 26-132—
Water Quality Requirements After Regulated Earth Disturbance Activities Are Complete.
§ 26-133—
Delaware Canal Areas.
§ 26-135—
Other Requirements.
Ch 26 Pt 1 Art D—
Stormwater Management Plan Requirements.
§ 26-136—
General Requirements.
§ 26-137—
Stormwater Management Plan Contents and Requirements.
§ 26-138—
Plan Submission.
§ 26-139—
Stormwater Management Plan Review.
§ 26-141—
Adherence to Approved Plan.
§ 26-142—
Certification of Completion.
§ 26-143—
Modification of Plans.
§ 26-144—
Occupancy Permit.
§ 26-145—
Schedule of Inspections.
§ 26-146—
Right of Entry.
§ 26-151—
Stormwater Management Plan Review Fees and Escrow.
§ 26-152—
Expenses Covered by Fees and Escrow.
§ 26-161—
Performance Guarantee.
§ 26-162—
Maintenance Responsibilities.
§ 26-163—
Municipal Review of Stormwater Facilities and BMP O&M Plan.
§ 26-164—
Maintenance Agreement for Privately Owned Stormwater BMPs.
§ 26-165—
Stormwater Management Easements.
§ 26-166—
Municipal Stormwater Maintenance Fund.
§ 26-171—
Prohibited Discharges.
§ 26-173—
Roof Drains and Sump Pumps.
§ 26-175—
Alteration of SWM BMPs.
§ 26-183—
Enforcement.
§ 26-186—
Appeals.
§ 26-303—
Water Use Mandatory Restrictions; Prohibited Nonessential Water Uses.
27-202{18}—
BUILDING ENVELOPE
27-202{78}—
OPEN SPACE
27-202{107}—
STORMWATER MANAGEMENT FACILITY
§ 27-304—
Use Regulations.
§ 27-603—
Area and Dimensional Requirements.
§ 27-803—
Area and Dimensional Requirements.
§ 27-1103—
Area and Dimensional Requirements.
§ 27-2404—
Open Space.
§ 27-2405—
Buffers.
§ 27-2803—
Application Requirements for Zoning Permits.
§ 27-2811—
Transferable Development Rights.
§ 27-2903—
Jurisdiction of Zoning Hearing Board and Board of Supervisors.
§ 27-2905—
Parties Appellant before the Zoning Hearing Board.
§ 27-2909—
Special Exceptions.
§ I-101—
Water.
§ KO-101—
Key To The Disposition Of All Ordinances.
Stormwater control
§ 26-101—
Statement of Findings.
§ 26-105—
Exemptions.
26-111E.{101}—
POST-CONSTRUCTION
§ 26-124—
Volume Control Standards: Neshaminy Creek Watershed.
§ 26-125—
Nonstructural Project Design: Sequencing to Minimize Stormwater Impacts.
§ 26-129—
Design Criteria for Stormwater Management Facilities and Best Management Practices.
§ 26-162—
Maintenance Responsibilities.
§ 26-164—
Maintenance Agreement for Privately Owned Stormwater BMPs.
§ 26-165—
Stormwater Management Easements.
Stormwater management
§ 5-104—
Additions, Insertions and Changes to the Building Code.
§ 11-203—
Disclosure Requirements.
§ 11-204—
Residential Disclosure Statement.
§ 11-205—
Plan of Lot.
§ 22-303—
Site Inspections.
§ 22-502—
Preliminary Plan Requirements.
§ 22-603—
Final Plan Requirements (Minor Subdivision).
§ 22-706—
Recording of Final Plan.
§ 22-906—
Easements.
§ 22-919—
Monuments.
§ 22-921—
Reforestation/Afforestation.
§ 22-923—
Stormwater Management.
§ 22-924—
Excavation and Grading.
§ 22-935—
As-Built Drawings.
§ 22-1002—
General Performance Standards.
§ 22-1401—
Stormwater Capital Contribution.
Ch 26 Pt 1—
STORMWATER MANAGEMENT
§ 26-101—
Statement of Findings.
§ 26-102—
Purpose.
§ 26-104—
Applicability.
§ 26-105—
Exemptions.
§ 26-108—
Compatibility with Other Ordinance Requirements.
26-111E.{21}—
DESIGN STORM
26-111E.{37}—
DRAINAGE CONVEYANCE FACILITY
26-111E.{38}—
DRAINAGE EASEMENT
26-111E.{78}—
LOW IMPACT DEVELOPMENT (LID)
26-111E.{91}—
PARENT TRACT
26-111E.{135}—
STORMWATER MANAGEMENT (SWM) SITE PLAN
26-111E.{136}—
STORMWATER MANAGEMENT FACILITY
26-111E.{137}—
STORMWATER MANAGEMENT PERMIT
26-111E.{138}—
STORMWATER MANAGEMENT PLAN
26-111E.{143}—
SUBAREA or SUBWATERSHED
Ch 26 Pt 1 Art C—
Stormwater Management.
§ 26-121—
General Requirements for Stormwater Management.
§ 26-122—
Stormwater Management Districts: Peak Rate Control.
§ 26-124—
Volume Control Standards: Neshaminy Creek Watershed.
§ 26-125—
Nonstructural Project Design: Sequencing to Minimize Stormwater Impacts.
§ 26-127—
Additional Requirements Applicable to Infiltration-Oriented Stormwater Management Systems: Delaware River South and Tohickon Creek Watersheds.
§ 26-129—
Design Criteria for Stormwater Management Facilities and Best Management Practices.
§ 26-130—
Calculation Methodology.
§ 26-132—
Water Quality Requirements After Regulated Earth Disturbance Activities Are Complete.
Ch 26 Pt 1 Art D—
Stormwater Management Plan Requirements.
§ 26-136—
General Requirements.
§ 26-137—
Stormwater Management Plan Contents and Requirements.
§ 26-138—
Plan Submission.
§ 26-139—
Stormwater Management Plan Review.
§ 26-141—
Adherence to Approved Plan.
§ 26-142—
Certification of Completion.
§ 26-143—
Modification of Plans.
§ 26-144—
Occupancy Permit.
§ 26-145—
Schedule of Inspections.
§ 26-151—
Stormwater Management Plan Review Fees and Escrow.
§ 26-152—
Expenses Covered by Fees and Escrow.
§ 26-161—
Performance Guarantee.
§ 26-162—
Maintenance Responsibilities.
§ 26-164—
Maintenance Agreement for Privately Owned Stormwater BMPs.
§ 26-165—
Stormwater Management Easements.
§ 26-166—
Municipal Stormwater Maintenance Fund.
§ 26-175—
Alteration of SWM BMPs.
§ 26-183—
Enforcement.
§ 26-186—
Appeals.
27-202{18}—
BUILDING ENVELOPE
27-202{78}—
OPEN SPACE
27-202{107}—
STORMWATER MANAGEMENT FACILITY
§ 27-304—
Use Regulations.
§ 27-603—
Area and Dimensional Requirements.
§ 27-803—
Area and Dimensional Requirements.
§ 27-1103—
Area and Dimensional Requirements.
§ 27-2405—
Buffers.
§ 27-2803—
Application Requirements for Zoning Permits.
§ 27-2811—
Transferable Development Rights.
§ 27-2903—
Jurisdiction of Zoning Hearing Board and Board of Supervisors.
§ 27-2905—
Parties Appellant before the Zoning Hearing Board.
§ 27-2909—
Special Exceptions.
§ I-101—
Water.
§ KO-101—
Key To The Disposition Of All Ordinances.
Street closings
Streetlighting
Street openings
Swimming pools
§ 5-104—
Additions, Insertions and Changes to the Building Code.
§ 5-205—
Existing Ordinances.
22-202{38}—
IMPERVIOUS SURFACES
Ch 23—
Swimming Pools
§ 26-105—
Exemptions.
26-111E.{68}—
IMPERVIOUS SURFACE
§ 26-303—
Water Use Mandatory Restrictions; Prohibited Nonessential Water Uses.
27-202{54}—
IMPERVIOUS SURFACE
§ 27-304—
Use Regulations.
§ 27-2309—
Special Setbacks.
§ 27-2320—
Lighting.