Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Township of Shirley, PA
Huntingdon County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: R
A B C D E F G H I J L M N O P Q R S T U V W Y Z
Records
ยงย 36-5— Officers; adoption of procedural rules; records and reports. ยงย 36-6— Powers and duties. ยงย 70-9— Board of Adjustment. ยงย 83-6— Hearing procedure. ยงย 83-8— Enforcement procedures. ยงย 142-9— Duties and responsibilities of Floodplain Administrator. ยงย 142-19— Description. ยงย 142-24— Elevation and floodproofing requirements. ยงย 142-37— Procedures and conditions. 142-39{7}— DECLARATION OF LAND RESTRICTION (NONCONVERSION AGREEMENT) 204-1{2}— OWNER(S) OF REAL PROPERTY ยงย 210-6.1— Abatement of nuisance. ยงย 210-10— Sewage, privy and holding tank permit requirements. ยงย 210-12— Replacement areas. ยงย 210-19— Administration. ยงย 231-13— Waivers. ยงย 231-20— Riparian buffer easement. ยงย 231-25— SWM site plan and report contents. ยงย 231-30— Authorization to construct; term of validity. ยงย 231-31— Record drawings; completion certificate; final inspection. ยงย 231-32— Easements. ยงย 231-33— Financial guarantee. ยงย 231-34— Maintenance responsibilities. ยงย 231-35— Maintenance agreement for privately owned stormwater facilities. ยงย 231-44— Prohibited discharges and connections. ยงย 231-49— Recording of approved SWM site plan and related agreements. ยงย 240-13— Final plan; general procedure. ยงย 240-18— Final plan. ยงย 240-21— Lots and blocks. ยงย 240-35— Procedures for all land developments. ยงย 240-47— Guarantee of improvements installation required. ยงย 240-49— Development agreement. ยงย 240-56— Records. ยงย 240-57— Preventive remedies. ยงย 240-59— Modification of regulations. ยงย 240-69— Recording of modification or variance. 240-71{63}— PLAN, FINAL ยงย 247-14— When effective. ยงย 247-21— Employer's date of determination of liability for tax. ยงย 247-24— Powers and duties of Township Tax Receiver. ยงย 247-26— Violations and penalties. ยงย 247-41— Tax rate. ยงย 271-11— Waivers. ยงย 271-21— No further land development.
Reports
ยงย 36-5— Officers; adoption of procedural rules; records and reports. ยงย 83-5— Investigation procedure. ยงย 83-6— Hearing procedure. ยงย 108-8— Inspection and revocation. ยงย 142-9— Duties and responsibilities of Floodplain Administrator. ยงย 142-37— Procedures and conditions. 142-39{13}— FLOOD INSURANCE STUDY (FIS) ยงย 151-3— Procedure for payment of claims. 210-8{17}— OFFICIAL PLAN REVISION ยงย 210-10— Sewage, privy and holding tank permit requirements. ยงย 210-13— Inspections of on-lot sewage disposal systems, privies and holding tanks. ยงย 210-15— Maintenance. ยงย 210-18— Disposal of septage. 231-10B{39}— HYDROLOGIC SOIL GROUP (HSG) ยงย 231-18— Protected watershed requirements. ยงย 231-21— Design criteria for stormwater management and drainage facilities. Ch 231 Art VIII— SWM Site Plan and Report Requirements ยงย 231-25— SWM site plan and report contents. ยงย 231-26— SWM site plan and report submission. ยงย 231-27— SWM site plan and report review. ยงย 231-28— Modification of plans. ยงย 231-29— Resubmission of disapproved SWM site plan and report. ยงย 231-30— Authorization to construct; term of validity. ยงย 231-31— Record drawings; completion certificate; final inspection. ยงย 231-33— Financial guarantee. ยงย 231-34— Maintenance responsibilities. ยงย 231-35— Maintenance agreement for privately owned stormwater facilities. ยงย 231-36— Schedule of inspections. ยงย 231-48— Expenses covered by fees. ยงย 240-5— County review. ยงย 240-11— Submission of plans; general procedure. ยงย 240-51— Approval of improvements. ยงย 240-62— Appeals. 240-71{29}— ENVIRONMENTALLY SENSITIVE AREAS 247-44{8}— TAX RETURN ยงย 260-49— Sample forms; summary sheets. ยงย 271-5— Permits required. ยงย 271-23— Commercial wind turbine generator removal.