Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Township of Shirley, PA
Huntingdon County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: U
A B C D E F G H I J L M N O P Q R S T U V W Y Z
Utilities
ยงย 23-4— Formula; adjustments. ยงย 23-5— Annual audit; credits and debits. ยงย 36-7— Funds and assistance. ยงย 70-2— Declaration of policy. 70-3{14}— LARGER THAN UTILITY RUNWAY 70-3{16}— NONPRECISION INSTRUMENT RUNWAY 70-3{19}— PRECISION INSTRUMENT RUNWAY 70-3{27}— UTILITY RUNWAY ยงย 70-4— Airport surface zones. ยงย 70-5— Airport surface zone height limitations. ยงย 70-12— Acquisition of air rights. ยงย 108-14— Local enforcement. ยงย 142-2— Intent. ยงย 142-10— Application procedures and requirements. ยงย 142-24— Elevation and floodproofing requirements. ยงย 142-25— Design and construction standards. ยงย 142-28— Special requirements for manufactured homes. ยงย 142-31— Application requirements. 142-39{8}— DEVELOPMENT 142-39{9}— EXISTING MANUFACTURED HOME PARK OR SUBDIVISION 142-39{10}— EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION 142-39{21}— MANUFACTURED HOME 142-39{24}— NEW MANUFACTURED HOME PARK OR SUBDIVISION 142-39{25}— PERSON 142-39{29}— REGULATORY FLOOD ELEVATION ยงย 210-9— Applicability. ยงย 210-10— Sewage, privy and holding tank permit requirements. ยงย 210-18— Disposal of septage. ยงย 210-19— Administration. 231-10B{59}— PERSON ยงย 231-12— Exemptions/modifications. ยงย 231-14— Volume controls. ยงย 231-17— Erosion and sedimentation requirements during earth disturbance activities. ยงย 231-18— Protected watershed requirements. ยงย 231-19— Riparian buffer requirements. ยงย 231-21— Design criteria for stormwater management and drainage facilities. ยงย 231-22— Calculation methodology. ยงย 231-25— SWM site plan and report contents. ยงย 236-7— Permit required. ยงย 236-13— Failure to obtain permit; removal of encroachment; repairs. ยงย 236-14— Civil penalty in addition to corrective action. ยงย 240-2— Purpose. ยงย 240-12— Preliminary plan. ยงย 240-18— Final plan. ยงย 240-20— Density. ยงย 240-23— Easements. ยงย 240-26— Design standards for streets. ยงย 240-28— Utilities. ยงย 240-29— Stormwater management facilities. ยงย 240-36— Final plan review. ยงย 240-37— Site plan. ยงย 240-38— Design standards. ยงย 240-41— Commercial and industrial subdivision or land development design standards. ยงย 240-42— Recreational campground and recreational development design standards. ยงย 240-46— Mobile home park standards. ยงย 240-47— Guarantee of improvements installation required. ยงย 240-49— Development agreement. ยงย 240-57— Preventive remedies. 240-71{1}— ACCESSORY BUILDING 240-71{20}— DEVELOPMENT 240-71{27}— EASEMENT 240-71{54}— MOBILE HOME LOT 240-71{57}— MONUMENT 240-71{102}— UTILITY PLAN ยงย 260-6— Definitions. 260-45{2}— LOCAL TRAFFIC 271-3{1}— COMMERCIAL WIND TURBINE GENERATORS ยงย 271-4— Special conditions. ยงย 271-20— Performance standards.