Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Township of Upper Burrell, PA
Westmoreland County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: T
# A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Township Engineer
ยงย 131-3— General requirements. ยงย 131-7— Drainage control. ยงย 165-30— Application review procedures. ยงย 173-2— Applicability. 173-4{6}— ENGINEER (TOWNSHIP ENGINEER) ยงย 173-5— Regulations for grading. ยงย 173-7— Application procedures. ยงย 173-10— Placards. ยงย 280-4— Applicability. 280-7{23}— ENGINEER (TOWNSHIP ENGINEER) ยงย 280-17— Project plan review. ยงย 280-27— Performance guarantee. ยงย 280-28— Maintenance responsibilities. ยงย 280-30— Stormwater management easements. ยงย 280-31— Township stormwater maintenance fund. ยงย 280-34— Roof drains. ยงย 287-9— Refilling; restoration; responsibility for defects. ยงย 287-10— Permit holder's responsibilities; right of Township to do certain work; charges. ยงย 287-11— Requirements; correction of unsatisfactory work; completion of incomplete work. ยงย 287-12— Emergency openings. ยงย 287-14— Restrictions regarding excavations before and after paving or improving; exception. ยงย 287-16— Conditions for laying and extending utility lines. ยงย 287-17— Bond required. 292-6{47}— INSPECTOR 292-6{52}— LANDSLIDE-PRONE AREA 292-6{103}— SUBSTANTIALLY COMPLETED 292-6{108}— TOWNSHIP CONSTRUCTION STANDARDS 292-6{109}— TOWNSHIP ENGINEER ยงย 292-11— Procedure for minor subdivisions. ยงย 292-12— Preliminary application submission for major subdivisions. ยงย 292-14— Preliminary application approval for major subdivisions. ยงย 292-15— Final application submission for major subdivisions. ยงย 292-16— Final application content for major subdivision. ยงย 292-17— Final application approval for major subdivision. ยงย 292-18— Preliminary and final approval of land development, other than subdivision. ยงย 292-20— Posting of performance guarantee. ยงย 292-26— Progress inspections. ยงย 292-27— Notice of completion. ยงย 292-29— Final inspection and approval. ยงย 292-30— Acceptance of public improvements. ยงย 292-35— Survey monuments, bench marks and lot pins. ยงย 292-36— Utilities. ยงย 292-43— Review by Township Engineer. ยงย 292-44— Site development. ยงย 292-45— Streets. ยงย 292-48— Lots. ยงย 292-50— Storm sewers and drainage facilities. ยงย 292-51— Sanitary sewers. ยงย 292-52— Testing. ยงย 292-78— Modifications to allow equal or better specifications. ยงย 292-80— Application review and inspection. ยงย 320-8— Use under permit. ยงย 320-27— Adoption of weight limits. ยงย 350-8— Zoning District Map. ยงย 350-87— Administration and procedure. ยงย 350-89— Application for final approval. ยงย 350-93— Standards for specific uses. ยงย 350-96— Buffer areas and landscaping. ยงย 350-101— Temporary construction trailers, model homes or sales offices. ยงย 350-107— Oil and gas well operations. ยงย 350-109— Off-street parking design. ยงย 350-111— Off-street loading. ยงย 350-118— Billboards. ยงย 350-121— Nonconforming structures. ยงย 350-128— Jurisdiction of Zoning Hearing Board.