Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Town of Verona, NY
Oneida County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: L
A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Licenses and permits
ยงย 1-4— Enactments saved from repeal; matters not affected. ยงย 30-6— Gifts. ยงย 58-9— Possession of firearms. ยงย 62-6— Exceptions. ยงย 70-4— Designation of fiscal officer. ยงย 70-10— Requests for access to public records. ยงย 70-12— Records not available. ยงย 107-1— Conduct authorized. ยงย 107-2— Sunday games. ยงย 114-10— Administrative liability. ยงย 121-5— Permits and inspections. ยงย 132-1— Professional services and consulting fees. ยงย 136-1— Permit required. ยงย 136-2— Height and location. ยงย 136-3— General regulations. 143-5{24}— LOCAL ADMINISTRATOR 143-5{35}— START OF CONSTRUCTION 143-5{39}— VARIANCE ยงย 143-9— Penalties for noncompliance. ยงย 143-10— Warning and disclaimer of liability. ยงย 143-11— Designation of the local administrator. ยงย 143-12— The floodplain development permit. ยงย 143-13— Application for a permit. ยงย 143-14— Duties and responsibilities of Local Administrator. ยงย 143-15— General standards. ยงย 143-16— Standards for all structures. ยงย 143-18— Nonresidential structures. ยงย 143-19— Manufactured homes and recreational vehicles. ยงย 150-1— Games authorized; license required. ยงย 150-2— Sunday games. 162-4{4}— JUNK VEHICLES 162-4{5}— JUNKYARD ยงย 162-6— Screening. ยงย 162-9— Approved junkyard items. Ch 162 Art III— Permits ยงย 162-10— Permit required. ยงย 162-11— Existing junkyards and temporary permits. ยงย 162-12— Application form. ยงย 162-13— Environmental assessment. ยงย 162-14— Application fee. ยงย 162-15— Public hearing. ยงย 162-16— Approval or disapproval. ยงย 162-17— Issuance of permit. ยงย 162-18— Permit considerations. ยงย 162-19— Requirements for operation. ยงย 162-20— Inspections. ยงย 162-21— Revocation of permit. Ch 166— Licensing and Control of Dogs ยงย 166-1— Purpose. ยงย 166-2— Title; repeal. 166-4A{3}— DOG ยงย 166-5— Dog licensing. ยงย 166-6— Regulations and restrictions. ยงย 166-13— Redemption and impoundment fees and/or fines. ยงย 171-3— Location. ยงย 171-4— Application for license. ยงย 171-5— Issuance of license. ยงย 171-6— Annual fees. ยงย 171-7— Minimum requirements. ยงย 171-8— Revocation and suspension of license. ยงย 180-3— Exemptions. ยงย 180-4— License required. ยงย 180-5— Application for license. ยงย 180-6— Bonds. ยงย 180-7— Issuance of license. ยงย 180-8— Use of license by another person prohibited. ยงย 180-9— Loss of license. ยงย 180-10— Contents and form of license. ยงย 180-11— Term of license. ยงย 180-12— Exhibition of license. ยงย 180-13— License fees. ยงย 180-14— Revocation of license. ยงย 180-15— Prohibited acts. ยงย 180-16— Orders. ยงย 180-17— Records. ยงย 196-3— Specific purposes. 196-5B{5}— APPLICANT 196-5B{25}— CONNECTION CHARGE (TAP FEE) 196-5B{62}— INTERFERENCE 196-5B{65}— LICENSED HAULER 196-5B{67}— NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT 196-5B{77}— PASS-THROUGH 196-5B{78}— PERMIT 196-5B{95}— RECORDS 196-5B{132}— USER 196-5B{139}— WASTEWATER 196-5B{140}— WASTEWATER DISCHARGE PERMIT ยงย 196-8— Waste disposal unlawful. ยงย 196-12— Building permit issued only when approved wastewater disposal available. ยงย 196-16— Intermunicipal agreements. ยงย 196-21— Construction permit application. ยงย 196-22— Construction permit. ยงย 196-25— Septage removal. ยงย 196-26— Direct connection to new public sewers required. ยงย 196-28— Proper design. ยงย 196-29— New sewers subject to approval, fees, inspection, testing and reporting. ยงย 196-46— Liability insurance coverage during construction period. ยงย 196-49— Permit required for sewer connections. ยงย 196-50— License of plumbers. ยงย 196-54— Sewer lateral permits. ยงย 196-64— Sewage lifting. ยงย 196-69— Building lateral/street lateral connection. ยงย 196-71— Street lateral replacement; ownership. ยงย 196-74— Connection inspection. ยงย 196-75— Excavation and trench inspections. ยงย 196-84— Licenses and application. ยงย 196-85— Concurrent requirements. ยงย 196-86— Discharge location and timing. ยงย 196-89— General prohibitions. ยงย 196-90— Concentration based limitations. ยงย 196-91— Mass-discharge-based limitations. ยงย 196-92— Modification of limitations. Ch 196 Pt 1 Art X— Discharge Permits and Pretreatment Requirements ยงย 196-98— Wastewater discharge reports. ยงย 196-100— Wastewater discharges. ยงย 196-101— Wastewater discharge permits for significant industrial users. ยงย 196-102— Other industrial users. ยงย 196-103— Discharge permits to storm sewers not authorized. ยงย 196-104— Application for wastewater discharge permits. ยงย 196-105— Permit modifications. ยงย 196-106— Permit conditions. ยงย 196-107— Permit duration. ยงย 196-108— Permit reissuance. ยงย 196-109— Permit transfer. ยงย 196-110— Permit revocation. ยงย 196-111— Reporting requirements for permittee. ยงย 196-112— Flow equalization. ยงย 196-114— Proper design and maintenance of facilities and monitoring stations required. ยงย 196-115— Vandalism, tampering with measuring devices. ยงย 196-117— Accidental discharges; slug discharge control plan. ยงย 196-120— Public access to information maintained by the Superintendent. ยงย 196-121— Access to property and records. ยงย 196-122— Access to easements. ยงย 196-124— Special agreements. ยงย 196-126— Notification of violation. ยงย 196-128— Administrative or compliance orders. ยงย 196-129— Administrative fines. ยงย 196-130— Cease and desist orders. ยงย 196-131— Termination of permit. ยงย 196-132— Severing of water supply. ยงย 196-134— Failure of user to petition the Superintendent. ยงย 196-137— Civil actions for penalties. ยงย 196-138— Court orders. ยงย 196-139— Criminal penalties. ยงย 196-140— Additional injunctive relief. ยงย 196-143— Performance bonds. ยงย 196-144— Liability insurance. ยงย 196-153— Intercommunity agreement surcharges passed on. ยงย 196-157— Pretreatment program costs. ยงย 196-166— Procedural requirements available. ยงย 196-171— Final approval authority for new connections. ยงย 196-172— Applications for new significant industrial user connections. ยงย 196-178— Additional prohibited discharges. ยงย 196-184— Disposal, storage and composting prohibited. ยงย 199-6— Abandoned signs. ยงย 199-7— Off-premises advertising. ยงย 199-8— Billboard signage. ยงย 199-9— Retail signage standards. ยงย 199-12— Signs permitted in Rural Development (RD) Districts, Rural Residential (RR) Districts and Residential (R) Districts. ยงย 199-13— Signs permitted in Commercial Neighborhood Service (CNS) Districts and Hamlet Commercial and Residential (HCR) Commercial Districts. ยงย 199-14— Signs permitted in Planned Unit Development (PUD) Districts, Planned Commercial (PC) Districts and Heavy Commercial and Industrial (HC&I) Districts. ยงย 199-15— Strip malls, shopping centers and other parcels with multiple businesses. ยงย 199-16— Digital signs and LED signs. ยงย 199-17— Temporary signage. ยงย 199-18— Window signage. ยงย 199-19— Directory signage. ยงย 199-20— Gasoline filling station signage. ยงย 199-21— Exempt signage. ยงย 199-22— Sign maintenance. ยงย 199-23— Sign permits. ยงย 199-24— Permit exceptions. ยงย 199-25— Revocation of sign permit. ยงย 199-27— Signs existing at time of enactment. ยงย 210-4— Storage or accumulation of garbage and refuse. ยงย 224-6— Streets. ยงย 224-10— Lots. ยงย 244-5— Rules, conditions and restrictions. ยงย 244-6— Annual permit. 254-1{7}— ENGINEER ยงย 254-2— Water Superintendent. Ch 254 Art III— Permits ยงย 254-5— Permit required. ยงย 254-6— Application for permit. ยงย 254-7— Authority to connect to water mains. ยงย 254-8— Licensing of plumbers. ยงย 254-11— Inspection by Superintendent. ยงย 254-12— Highway work permits may be required. ยงย 254-21— Temporary water service or usage. ยงย 254-28— Use restricted. ยงย 254-31— Engineering plans and approval required. ยงย 254-34— Testing and certification. ยงย 254-39— Circumstances warranting restriction. ยงย 254-50— Administrative remedies. ยงย 254-51— Judicial remedies. ยงย 262-7— Application of regulations. 262-8{20}— CAMPGROUND 262-8{85}— NURSING OR CONVALESCENT HOME 262-8{93}— PORTABLE STORAGE CONTAINER 262-8{123}— USE, SECONDARY 262-8{130}— YARD, FRONT ยงย 262-13— Lots divided by district boundaries. ยงย 262-14— Accessory uses and structures. ยงย 262-15— RD Rural Development. ยงย 262-16— RR Rural Residential. ยงย 262-17— R Residential. ยงย 262-18— CNS Commercial Neighborhood Service. ยงย 262-19— HCR Hamlet Commercial and Residential. ยงย 262-20— PC Planned Commercial. ยงย 262-21— HC and I Heavy Commercial and Industrial. ยงย 262-22— PUD Planned Unit Development. ยงย 262-23— Highway Overlay Zone District. ยงย 262-24— Land uses. ยงย 262-26— Parking and loading. ยงย 262-27— Adult entertainment. 262-27B{1}— ADULT ENTERTAINMENT ENTERPRISE ยงย 262-28— Fences. ยงย 262-29— Outdoor solid-fuel-burning appliances and similar equipment. ยงย 262-30— Nonconforming elements. ยงย 262-31— Site plan review standards. ยงย 262-32— Special permit standards. ยงย 262-33— Variance standards. ยงย 262-35— Common review procedures and submission requirements. ยงย 262-37— Code Enforcement Officer. ยงย 262-38— Planning Board. ยงย 262-39— Zoning Board of Appeals. ยงย 262-40— Town Board. ยงย 262-42— Authority. 262-44{8}— ROOF-MOUNTED SOLAR ENERGY SYSTEM 262-44{9}— SOLAR ACCESS ยงย 262-45— Applicability. ยงย 262-46— General requirements. ยงย 262-47— Permitting requirements for Tier 1 solar energy systems. ยงย 262-48— Permitting requirements for Tier 2 solar energy systems. ยงย 262-49— Permitting requirements for Tier 3 solar energy systems. ยงย 262-50.1— Permit time frame and abandonment. ยงย 262-51— Authority. ยงย 262-54— General requirements. ยงย 262-55— Special use permit application requirements, standards and materials. ยงย 262-58— Exemptions from this article. ยงย 262-59— Application procedures. ยงย 262-60— Revocation of special use permit. ยงย 262-60.1— Fee schedule. ยงย 262-61— Authority. 262-63{1}— APPLICANT 262-63{7}— PROFESSIONAL ENGINEER 262-63{10}— WIND-POWER PROJECT ยงย 262-64— Applicability and application material. ยงย 262-65— Regulations and requirements. ยงย 262-66— Application for permit. ยงย 262-68— Campground operations. ยงย 262-69— Required permits. ยงย DL-1— Disposition of legislation.
Lots
ยงย 136-2— Height and location. ยงย 136-3— General regulations. ยงย 136-4— Plantings. ยงย 136-5— Placement and maintenance. ยงย 136-6— Accessibility. 143-5{27}— MANUFACTURED HOME PARK OR SUBDIVISION ยงย 143-13— Application for a permit. ยงย 143-21— Conditions for variances. ยงย 171-3— Location. ยงย 196-21— Construction permit application. ยงย 196-30— Plans, specifications and pipe test results required. ยงย 196-61— Future connection locations; as-built drawings. 199-2{15}— IDENTIFICATION SIGN 210-2{6}— PRIVATE PREMISES ยงย 210-3— Littering. 224-3{4}— PRELIMINARY PLAN 224-3{6}— SUBDIVISION ยงย 224-4— Preliminary plan; conditional approval. ยงย 224-6— Streets. ยงย 224-8— Easements. ยงย 224-9— Blocks. ยงย 224-10— Lots. ยงย 224-12— Grading. ยงย 224-16— Water supply. ยงย 224-17— Sewage disposal system. ยงย 224-20— Plat data. ยงย 262-7— Application of regulations. 262-8{1}— ACCESSORY APARTMENT DWELLING 262-8{3}— ACCESSORY USE 262-8{17}— BUILDING AREA 262-8{18}— BUILDING HEIGHT 262-8{28}— COVERAGE, BUILDING 262-8{29}— COVERAGE, LOT 262-8{31}— DIMENSIONAL GROUP 262-8{58}— IMPERVIOUS SURFACE 262-8{67}— LOT 262-8{68}— LOT AREA 262-8{69}— LOT DEPTH 262-8{70}— LOT WIDTH 262-8{71}— LOT, CORNER 262-8{72}— LOT, INTERIOR 262-8{73}— LOT, THROUGH 262-8{103}— SETBACK 262-8{116}— STRUCTURE, ACCESSORY 262-8{117}— STRUCTURE, PRINCIPAL 262-8{119}— TEMPORARY RESIDENCE 262-8{122}— USE, PRINCIPAL 262-8{129}— YARD 262-8{130}— YARD, FRONT 262-8{131}— YARD, REAR 262-8{132}— YARD, SIDE ยงย 262-12— Interpretation of district boundaries. ยงย 262-13— Lots divided by district boundaries. ยงย 262-14— Accessory uses and structures. ยงย 262-15— RD Rural Development. ยงย 262-16— RR Rural Residential. ยงย 262-17— R Residential. ยงย 262-18— CNS Commercial Neighborhood Service. ยงย 262-19— HCR Hamlet Commercial and Residential. ยงย 262-20— PC Planned Commercial. ยงย 262-21— HC and I Heavy Commercial and Industrial. ยงย 262-22— PUD Planned Unit Development. ยงย 262-23— Highway Overlay Zone District. ยงย 262-24— Land uses. ยงย 262-25— General lot and structure. ยงย 262-26— Parking and loading. ยงย 262-29— Outdoor solid-fuel-burning appliances and similar equipment. ยงย 262-30— Nonconforming elements. ยงย 262-32— Special permit standards. ยงย 262-35— Common review procedures and submission requirements. ยงย 262-37— Code Enforcement Officer. ยงย 262-48— Permitting requirements for Tier 2 solar energy systems. ยงย 262-49— Permitting requirements for Tier 3 solar energy systems. 262-53{1}— ACCESSORY FACILITY OR STRUCTURE