The purpose of this chapter is to set forth
construction requirements for sidewalks and curbs in order to ensure
that sound construction practices are incorporated into all such installations.
All references to Article numbers hereinafter
set forth shall refer to the New Jersey State Department of Transportation
Standard Specifications for Road and Bridge Construction, 1961.
The Borough Engineer or Borough Administrator
shall be advised in writing at least 24 hours in advance of exactly
when the owner or contractor intends to pour concrete. The Borough
Engineer or Borough Administrator shall be furnished with the concrete
truck's slips indicating Class B or Class C State mix as required
and that no water has been added since material left the plant.
It shall be necessary for the owner or contractor
to receive final approval of said sidewalk or curb installation from
the Borough Engineer or Borough Administrator. Said inspection will
be for the purpose of ensuring that all specifications herein have
been complied with and that no cracks are present in the finished
concrete work. In addition, all concrete work must have a smooth and
level finish between all joints in curbs and sidewalks. Furthermore,
no approval shall be given for any asphalt materials, and all materials
must be in accordance with the provisions of this chapter.