[CC 1979 §46.010; Ord. No. 1979 §1(46.010), 12-1-1992; Ord. No. 3531 §1, 9-4-2012]
Any person, persons, co-partnership or corporation desiring to dig into the City streets or alleys of the City of Sullivan, Missouri, shall first secure a permit for said purpose from the City Clerk of the City of Sullivan, Missouri. The costs of said permit shall be as set out in Section
160.180 of this Code, and the person, persons, co-partnership or corporation shall further indemnify the City against excessive restoration or damage costs by providing a bond in an amount deemed sufficient by the City Administrator or City Engineer.
[CC 1979 §46.020; Ord. No. 1979 §1(46.020), 12-1-1992]
The holder of any such excavation permit shall upon completion
of his/her excavation project fill such excavated area to the level
of the street with chat, white rock or such other material as may
be authorized by the City of Sullivan, Missouri, and recompact same.
Upon completion of such excavation and recompaction, the holder of
any such permit shall immediately notify the City of Sullivan.
[CC 1979 §46.031; Ord. No. 1979 §1(46.031), 12-1-1992]
A. Any person,
firm or corporation to whom a building, demolition or excavation permit
has been issued or who is performing construction of any type in the
City shall remove at least once each working day any mud, dirt, sticky
substance, litter or foreign matter of any kind carried into or deposited
upon any public street, public sidewalk or other public way or place
of the City by any vehicle or by the wheels of any vehicle entering
or leaving the site of the project for which the building, demolition
or excavation permit was issued. The removal shall be performed once
prior to the end of the working day.
B. Any landowner
involved in building construction, demolition or grading shall remove
at least once each working day any mud, dirt, sticky substance, litter
or foreign matter of any kind carried into or deposited upon any public
street, public sidewalk or other public way or place of the City by
any vehicle or by the wheels of any vehicle entering or leaving the
site of the project of building construction, demolition or grading.
The removal shall be performed once prior to the end of the working
day.