Table 10-1. Principal Uses in Public Use District
| |||
---|---|---|---|
P
|
Development Standards
| ||
Public Uses
| |||
Community center, neighborhood center
|
P
| ||
Government office
|
P
| ||
Public park, playground, recreation center/facility
|
P
| ||
Public safety/service facility
|
P
| ||
Stormwater ponds
|
P
| ||
Substation/distribution equipment
|
P
| ||
Yard compost/waste site, municipal
|
P
| ||
Other public or semi-public facilities not listed in this table
|
C
| ||
Public Service and Utilities
| |||
Telecommunication Towers
| |||
Tower and antennas (Class 1 Co-location)
|
C
|
x
| |
Tower and antennas (Class 2 Co-location)
|
P
|
x
| |
Accessory Uses
| |||
Water gardens <400 square feet
|
P
|
x
| |
Garages for storage of vehicles used in conjunction with permitted
use
|
P
| ||
Service buildings/facilities accessory to permitted use
|
P
|
Note: P = Permitted; C = Conditional Use
|
Table 10-2. Lot Requirements in Public Use District
| ||
---|---|---|
P
| ||
Lot Requirements
| ||
Minimum lot area
|
10,000 square feet
| |
Lot frontage
|
80 feet
| |
Lot width
|
80 feet
| |
Height Requirements (feet)
| ||
Primary structure
|
35
| |
Accessory structure
|
<35
| |
Primary Building Setback Requirements (feet)
| ||
Front yard (from ROW)
|
30
| |
Side yard
|
10 each
| |
Rear yard
|
20
| |
Corner side yard (from ROW)
|
30
| |
Accessory Building Setback Requirements (feet)
| ||
Front yard (from ROW)
|
30
| |
Side yard
|
10
| |
Rear yard
|
10
| |
Corner side yard (from ROW)
|
30
| |
Number of Structures
| ||
Primary structure
|
No limit
| |
Accessory structure
|
No limit
| |
Maximum Building Coverage
| ||
45%
|