Table 125-11-1
| ||||
---|---|---|---|---|
Frequency of Post-Construction Inspections
| ||||
BMP Classification
|
BMP Type
|
Minimum Inspection Schedule
|
Notes
| |
1
|
Rooftop disconnection
|
Every 5 years
|
Owner shall inspect and provide documentation as per the requirements
found on the Virginia Stormwater BMP Clearinghouse website and the
Administrative Guidance Manual for BMPs within classification 2, 3,
and 4. The City of Galax shall inspect all BMPs every 5 years.
| |
1
|
Sheetflow to vegetated filter or conserved open space
|
Every 5 years
| ||
1
|
Grass channel
|
Every 5 years
| ||
1
|
Soil amendments
|
Every 5 years
| ||
2
|
Permeable pavement
|
Annually
| ||
2
|
Infiltration
|
Annually
| ||
2
|
Bioretention
|
Annually
| ||
2
|
Dry swale
|
Annually
| ||
2
|
Wet swale
|
Annually
| ||
2
|
Filtering practice
|
Annually
| ||
2
|
Constructed wetland
|
Annually
| ||
2
|
Wet pond
|
Annually
| ||
2
|
Extended detention
|
Annually
| ||
3
|
Vegetated roof
|
Twice per year (spring/fall)
| ||
3
|
Rainwater harvesting
|
Twice per year (spring/fall)
| ||
4
|
Manufactured/other BMP
|
Yearly or per manufacturer recommendations, whichever is more
frequent
|
Owner shall inspect and provide documentation according to manufacturer's
guidelines and the Administrative Guidance Manual
|
Table 1-15A
| ||||
---|---|---|---|---|
Land Disturbance Permit Fees for Detached Single-Family
Home Construction Within or Outside of Common Plan of Development
or Sale With a Land-Disturbing Activity Less Than Five Acres
| ||||
Fee Type
|
Total Fee
|
VSMP Authority
(Administrator) portion
|
Department
(DEQ) portion
| |
General/stormwater management: detached single-family home construction
(areas within common plans of development or sale with land disturbance
acreage less than 1 acre)
|
$290
|
$209
|
$0
| |
General/stormwater management: detached single-family home construction
(sites or areas within common plans of development or sale with land
disturbance acreage equal to or greater than 1 acre and less than
5 acres)
|
$290
|
$209
|
$0
|
Table 1-15B
| ||||
---|---|---|---|---|
Land Disturbance Permit Fees for the General Permit for
Discharges of Stormwater From Construction Activities
| ||||
Fee Type
|
Total Fee
|
VSMP Authority
(Administrator) portion
|
Department
(DEQ) portion
| |
General/stormwater management: small construction activity/land
clearing (areas within common plans of development or sale with land
disturbance acreage less than 1 acre)
|
$290
|
$209
|
$81
| |
General/stormwater management: small construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 1 acre and
less than 5 acres)
|
$2,700
|
$1,944
|
$756
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 5 acres and
less than 10 acres)
|
$3,400
|
$2,448
|
$952
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 10 acres and
less than 50 acres)
|
$4,500
|
$3,240
|
$1,260
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 50 acres and
less than 100 acres)
|
$6,100
|
$4,392
|
$1,708
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 100 acres)
|
$9,600
|
$6,912
|
$2,688
|
Table 1-15C
| ||
---|---|---|
Fees for the Modification or Transfer of Registration
Statements for the General Permit for Discharges of Stormwater from
Construction Activities
| ||
Type of Permit
|
VSMP Authority
(Administrator) Fee Amount
| |
General/stormwater management: small construction activity/land
clearing (areas within common plans of development or sale with land
disturbance acreage less than 1 acre)
|
$20
| |
General/stormwater management: small construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 1 acre and
less than 5 acres)
|
$200
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 5 acres and
less than 10 acres)
|
$250
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 10 acres and
less than 50 acres)
|
$300
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 50 acres and
less than 100 acres)
|
$450
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 100 acres)
|
$700
|
Table 1-15D
| ||
---|---|---|
Annual Maintenance Fees for the General Permit for Discharges
of Stormwater From Construction Activities
| ||
Type of Permit
|
VSMP Authority
(Administrator) Fee Amount
| |
General/stormwater management: small construction activity/land
clearing (areas within common plans of development or sale with land
disturbance acreage less than 1 acre)
|
$50
| |
General/stormwater management: small construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance equal to or greater than 1 acre and less than
5 acres)
|
$400
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 5 acres and
less than 10 acres)
|
$500
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 10 acres and
less than 50 acres)
|
$650
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 50 acres and
less than 100 acres)
|
$900
| |
General/stormwater management: large construction activity/land
clearing (sites or areas within common plans of development or sale
with land disturbance acreage equal to or greater than 100 acres)
|
$1,400
|
Table 1-19A
| |||
---|---|---|---|
Stormwater Utility Fees
| |||
Range of Impervious Area
(square feet)
|
ERU
|
Annual Fee
| |
Equal to
|
Less than
| ||
0
|
6,000
|
1.0
|
$75
|
6,000
|
8,000
|
1.3
|
$98
|
8,000
|
10,000
|
1.7
|
$128
|
10,000
|
13,000
|
2.1
|
$158
|
13,000
|
17,000
|
2.8
|
$210
|
17,000
|
22,000
|
3.6
|
$270
|
22,000
|
29,000
|
4.7
|
$353
|
29,000
|
38,000
|
6.2
|
$465
|
38,000
|
49,000
|
8.1
|
$608
|
49,000
|
64,000
|
10.4
|
$780
|
64,000
|
83,000
|
13.6
|
$1,020
|
83,000
|
108,000
|
17.7
|
$1,328
|
108,000
|
140,000
|
23.0
|
$1,725
|
140,000
|
182,000
|
29.8
|
$2,235
|
182,000
|
237,000
|
38.7
|
$2,903
|
237,000
|
308,000
|
50.4
|
$3,780
|
308,000
|
400,000
|
65.5
|
$4,913
|
>400,000
|
85.1
|
$6,383
|