The
erosion and sedimentation plan details shall be in conformance with
the standards set forth in DER's publication, Erosion and Sediment
Pollution Control Program Manual. In addition, if required, a national
pollutant discharge elimination system (NPDES) permit must be obtained
prior to construction.