[HISTORY: Adopted by the Board of Trustees
of the Village of Croton-on-Hudson 7-21-2008 by L.L. No. 3-2008. Amendments noted where applicable.]
GENERAL REFERENCES
Building construction — See Ch.
86.
Environmental quality review — See Ch.
116.
Erosion and sediment control — See
Ch. 118.
Excavation, filling and topsoil removal — See Ch.
120.
Flood damage prevention — See Ch.
129.
Stormwater, drainage, erosion and water pollution control — See Ch.
196.
Subdivision of land — See Ch.
200.
Tree preservation — See Ch.
208.
Water supply protection — See Ch.
223.