Township of Butler, PA
Butler County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Board of Commissioners of the Township of Butler 12-6-1993 by Ord. No. 730. Amendments noted where applicable.]
GENERAL REFERENCES
Planning Commission — See Ch. 78.
Uniform construction codes — See Ch. 138.
Drainage standards — See Ch. 156.
Floodplain management — See Ch. 183.
Grading and excavating — See Ch. 188.
Sewers and sewage disposal — See Ch. 224.
Streets — See Ch. 245.
Stormwater management — See Ch. 242.
Water — See Ch. 290.
Watercourses — See Ch. 296.
Zoning — See Ch. 300.
252a Appendix A
Article I Title, Scope and Purpose

§ 252-1 Title.

§ 252-2 Purpose.

§ 252-3 Grant of power.

§ 252-4 Application of regulations.

§ 252-5 Types of subdivisions and land developments governed by this chapter.

§ 252-6 Exclusion of certain land developments.

Article II Definitions

§ 252-7 General terms.

§ 252-8 Specific terms.

Article III Administrative Procedure

§ 252-9 Preapplication procedure.

§ 252-10 Minor land developments.

§ 252-11 Preliminary application.

§ 252-12 Final application.

§ 252-13 Requirements for final approval.

§ 252-14 Construction review and approval.

§ 252-15 Notice of completion.

§ 252-16 Filing of plans.

§ 252-17 Inspection and release from improvement bond.

§ 252-18 Status of improvements after acceptance.

§ 252-19 Acceptance of public improvements.

§ 252-20 Posting of maintenance bond.

§ 252-21 Release of amenities bond.

Article IV Development Standards and Design Requirements

§ 252-22 Applicability.

§ 252-23 Street standards.

§ 252-24 Easements and dedications.

§ 252-25 Lots.

Article V Required Improvements

§ 252-26 General.

§ 252-27 Monuments and markers.

§ 252-28 Streets.

§ 252-29 Street name signs.

§ 252-30 Streetlights.

§ 252-31 Curbs and gutters.

§ 252-32 Sanitary sewage disposal.

§ 252-33 Water supply and hydrants.

§ 252-34 Underground utilities.

§ 252-35 Flood-prone areas.

§ 252-36 Erosion and sedimentation plan.

§ 252-37 Grading, drainage and stormwater management.

§ 252-38 Additional design standards for land developments.

Article VI Mobile Home Parks

§ 252-39 General requirements.

§ 252-40 Development standards.

§ 252-41 Utilities.

§ 252-42 Responsibilities of management.

§ 252-43 Violations and penalties.

Article VII Waivers And Modifications

§ 252-44 Waivers of application requirements for simple subdivision.

§ 252-45 Cases of physical hardship.

§ 252-46 Other modifications.

§ 252-47 Procedure for authorizing modifications.

Article VIII Amendment Procedures

§ 252-48 Initiation.

§ 252-49 Procedures for consideration.

Article IX Prohibitions, Penalties, Enforcement, Fees and Injunctive Proceedings

§ 252-50 Unlawful recording and sale of lots.

§ 252-51 Preventive remedies.

§ 252-52 Enforcement remedies.

§ 252-53 Enforcement.

§ 252-54 Filing, application review and inspection fees.

Article X Certificates and Approvals

§ 252-55 General provisions.

§ 252-56 Owner's adoption (or § 252-57).

§ 252-57 Corporation adoption (or § 252-56).

§ 252-58 Individual acknowledgment (or § 252-59).

§ 252-59 Corporation acknowledgment (or § 252-58).

§ 252-60 Title clause (no mortgage).

§ 252-61 Title clause (mortgage clause).

§ 252-62 Surveyor's certification (required).

§ 252-63 Local authority stipulation (required).

§ 252-64 Municipal approval (required).

§ 252-65 Local Planning Commission approval (required).

§ 252-66 County Planning Commissioner review (required).

§ 252-67 County Conservation District approval (required).

§ 252-68 Proof of recording (required).