home
Home
code
Code
Code
Index
law
Laws (1)
New Laws (1)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Township of Metal, PA
chevron_right
2021-08-05
info
chevron_right
Index: G
Filter By Letter
A
B
C
D
E
F
G
H
I
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Index:
G
add
Gambling
§ 8-10 — Prohibition of certain conduct.
add
Garages
11A-81{33} — START OF CONSTRUCTION
§ 18-8 — Use of public sewers required.
22-6{30} — DRIVEWAY
§ 22-26 — Streets, alleys and sidewalks.
add
Garbage, rubbish and refuse
§ 8-3 — Conditions of approval.
§ 11A-21 — Enforcement.
14-2{4} — DEBRIS
14-2{6} — NUISANCE
§ 18-10 — Rules and regulations governing building sewers and connections to sewers.
§ 18-17 — Permit requirements.
§ 18-18 — Maintenance of systems.
§ 18-21 — Operation of on-lot sewage disposal systems.
§ 18-24 — Disposal of sewage and sewage sludge and registration of sewage and sewage sludge haulers.
§ 20-2 — Purpose.
§ 20-3 — Refuse to be covered.
§ 20-4 — Loose refuse.
§ 20-5 — Public roads.
22-6{81} — PUBLIC GROUNDS
§ 22-15 — Consultation with Planning Commission.
§ 22-35 — Standards for sewer and water systems.
§ 22-51 — Other site improvements.
§ 22-57 — Preventative remedies.
§ 23-3 — Failure to pay.
§ 23-27 — Violations and penalties.
add
Garden apartments
22-6{32} — DWELLING GARDEN APARTMENT
add
Gas
§ 11A-43 — Applicability of other standards.
§ 11A-45 — Design and construction standards.
11A-81{25} — MINOR REPAIR
§ 18-18 — Maintenance of systems.
§ 21-1 — Permit requirement.
22-6{56} — IMPROVEMENTS
add
Glare
11-1{4} — GLARE
§ 11-2 — Accessory solar energy systems (ASES).
§ 11-3 — Principal solar energy systems (PSES).
add
Grades and grading
§ 1-4 — Ordinances saved from repeal; matters not affected by repeal.
§ 11-3 — Principal solar energy systems (PSES).
§ 11A-3 — Applicability.
§ 11A-14 — Application procedures and requirements.
§ 11A-44 — Elevation and flood-proofing requirements.
11A-81{9} — DEVELOPMENT
11A-81{33} — START OF CONSTRUCTION
14-2{3} — DANGEROUS BUILDING
§ 18-19 — Inspection of systems.
§ 21-18 — Property number signs.
22-6{22} — CUT
22-6{56} — IMPROVEMENTS
22-6{112} — STORMWATER MANAGEMENT PLAN
22-6{124} — UNDEVELOPED LAND
§ 22-7 — Control of subdivision and land development.
§ 22-18 — Plat requirements.
§ 22-20 — Final plat approval.
§ 22-23 — Construction of improvements.
§ 22-25 — Blocks and lots.
§ 22-26 — Streets, alleys and sidewalks.
§ 22-27 — Utilities and public grounds.
§ 22-30 — Construction of improvements.
§ 22-32 — Standards for monuments and markers.
§ 22-33 — Street construction.
§ 22-36 — Standards for stormwater management.
§ 22-39 — Approval of site plan.
§ 22-41 — Park site.
§ 22-42 — Lot requirements.
add
Guarantees
§ 1-4 — Ordinances saved from repeal; matters not affected by repeal.
§ 11-2 — Accessory solar energy systems (ASES).
§ 11-3 — Principal solar energy systems (PSES).
§ 18-39 — Posting of security.
§ 22-7 — Control of subdivision and land development.
§ 22-20 — Final plat approval.
§ 22-21 — Review procedure.
§ 22-26 — Streets, alleys and sidewalks.
add
Gutters
§ 1-4 — Ordinances saved from repeal; matters not affected by repeal.
11-1{2} — CARTWAY
22-6{110} — STORMWATER FACILITY
§ 22-20 — Final plat approval.
§ 22-26 — Streets, alleys and sidewalks.
§ 22-31 — Materials and construction standards.
§ 22-33 — Street construction.