home
Home
code
Code
Code
Index
law
Laws (10)
New Laws (10)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Mathews County, VA
chevron_right
2023-08-22
info
chevron_right
Index: E
Filter By Letter
#
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
E
add
E-911
§ 136-4 — Road names.
145-72{3} — E-911 SYSTEM
§ 145-73 — Utility service tax levied; amount; exclusions; local tax for E-911.
add
Easements
§ 1-13 — Ordinances saved from repeal.
§ 125-12 — Development of residential, institutional, commercial or industrial sites.
§ 125-17 — Design and construction.
§ 125-33 — Basic engineering services required of owner or developer.
§ 140-2 — Purpose.
140-5{15} — EASEMENT
§ 140-20 — Sewage disposal systems.
§ 140-23 — Easements.
§ 140-27 — Lot sizes, location, shape and design.
§ 140-30 — Alignment of street and access to adjoining property.
§ 140-36 — Drainage.
§ 140-40 — Private road/driveway exceptions (waivers).
§ 140-70 — Preliminary plat.
§ 140-75 — Utilities.
§ 140-76 — Final plat.
§ 140-81 — As-built drawings.
§ 140-83 — Vacation of plats before sale of lot.
§ 140-84 — Vacation of plats after sale of lot; methods.
§ 140-85 — Effect of vacation on plat.
§ 140-87 — Replatting of subdivisions and boundary lines adjustments.
§ 140-90 — Private contracts.
175-2.2{4} — ACREAGE, GROSS
175-2.2{78} — EASEMENT
175-2.2{160} — PUBLIC ACCESS EASEMENT
§ 175-15.16 — Minimum setback and distance requirements for certain permitted agricultural and forestal uses.
§ 175-17.3 — Site development plan information required.
§ 175-17.4 — Preparation procedure and specific items, to be shown preparation procedure and specific items to be shown for the site development plan are as follows.
§ 175-17.5 — Minimum standards and improvements required.
§ 175-17.6 — Administration and procedures for processing site development plans.
§ 175-22.26 — Site plan.
add
Elevators
§ 63-8 — Duties and responsibilities of Floodplain Administrator.
§ 63-9 — Use and interpretation of FIRMs.
§ 63-13 — Submission of technical data.
§ 63-14 — Letters of map revision.
§ 63-15 — Description of special flood hazard districts.
§ 63-16 — Permit and application requirements.
§ 63-17 — General standards.
§ 63-18 — Elevation and construction standards.
§ 63-19 — Standards for subdivision proposals.
§ 63-20 — Conditions for continuation.
§ 63-21 — Factors to be considered.
§ 63-22 — Notifications.
63-24{3} — BASE FLOOD ELEVATION
63-24{8} — ELEVATED BUILDING
63-24{12} — FLOOD INSURANCE STUDY (FIS)
63-24{16} — FLOODWAY
63-24{19} — HIGHEST ADJACENT GRADE
63-24{21} — HYDROLOGIC AND HYDRAULIC ENGINEERING ANALYSIS
63-24{23} — LETTERS OF MAP CHANGE (LOMC)
63-24{24} — LOWEST ADJACENT GRADE
63-24{29} — MEAN SEA LEVEL
63-24{43} — VIOLATION
§ 125-26 — Sewer line construction and inspection.
140-5{19} — GEODETIC CONTROL NETWORK
§ 140-17 — Mutual responsibility and suitability of land.
166-2{8} — VEGETATED WETLANDS
175-2.2{32} — BUILDING HEIGHT
175-2.2{90} — FLOOR AREA
§ 175-12.1 — Minimum off-street parking required.
§ 175-17.4 — Preparation procedure and specific items, to be shown preparation procedure and specific items to be shown for the site development plan are as follows.
add
Emergencies
6-41{2} — EMERGENCY SITUATION
§ 6-42 — Keeping of wild, exotic, venomous or poisonous animals.
§ 20-17 — Fees.
30-2{2} — EMERGENCY
§ 30-4 — Defenses.
50-5{18} — LAND-DISTURBING ACTIVITY
§ 61-2 — Regulation and prohibition.
§ 63-8 — Duties and responsibilities of Floodplain Administrator.
§ 63-11 — District boundary changes.
§ 63-13 — Submission of technical data.
§ 63-15 — Description of special flood hazard districts.
§ 63-17 — General standards.
§ 63-21 — Factors to be considered.
63-24{3} — BASE FLOOD ELEVATION
63-24{11} — FLOOD INSURANCE RATE MAP (FIRM)
93-2{4} — EMERGENCY
§ 122-3 — Permitted uses and activities.
§ 136-2 — Purpose.
§ 136-3 — Statutory authority; intent.
§ 136-4 — Road names.
§ 140-30 — Alignment of street and access to adjoining property.
§ 140-40 — Private road/driveway exceptions (waivers).
145-72{3} — E-911 SYSTEM
§ 145-73 — Utility service tax levied; amount; exclusions; local tax for E-911.
§ 158-8 — Removal and disposition of unattended or immobile vehicles.
§ 163-1 — Water emergencies and conservation.
§ 163-2 — Drought monitoring.
§ 163-3 — Water conservation measures.
§ 163-5 — Declaration of end of water emergencies.
§ 166-3 — Permitted uses and activities.
175-2.2{160} — PUBLIC ACCESS EASEMENT
175-2.2{162} — PUBLIC FACILITIES
§ 175-11.2 — Uses permitted by right.
§ 175-15.11 — Emergency permits.
§ 175-17.3 — Site development plan information required.
§ 175-23.1 — Purpose.
§ 175-23.3 — General regulations.
add
Emergency management
§ 61-2 — Regulation and prohibition.
§ 63-8 — Duties and responsibilities of Floodplain Administrator.
§ 63-11 — District boundary changes.
§ 63-13 — Submission of technical data.
§ 63-15 — Description of special flood hazard districts.
§ 63-17 — General standards.
63-24{3} — BASE FLOOD ELEVATION
63-24{11} — FLOOD INSURANCE RATE MAP (FIRM)
add
Emergency vehicles
§ 63-21 — Factors to be considered.
§ 140-30 — Alignment of street and access to adjoining property.
add
Encroachments
§ 63-21 — Factors to be considered.
63-24{9} — ENCROACHMENT
§ 175-16.4 — Expansion or enlargement.
§ 175-22.11 — Performance criteria for RPA.
§ 175-22.16 — Buffer area modification.
§ 175-22.17 — Buffer area modifications on agricultural lands.
§ 175-22.19 — Water quality impact assessment required.
§ 175-22.20 — Minor water quality impact assessment.
§ 175-22.21 — Major water quality impact assessment.
§ 175-22.29 — Landscape plan plant specifications.
§ 175-22.47 — Exemptions for utilities, railroads and facilities.
add
Erosion and sediment control
Ch 20 — Building Construction
Ch 50 — Erosion and Sediment Control
§ 50-1 — Title.
§ 50-3 — Statutory authority.
50-5{2} — APPLICANT
50-5{4} — CERTIFIED INSPECTOR
50-5{5} — CERTIFIED PLAN REVIEWER
50-5{6} — CERTIFIED PROGRAM ADMINISTRATOR
50-5{13} — EROSION AND SEDIMENT CONTROL PLAN or PLAN
50-5{18} — LAND-DISTURBING ACTIVITY
50-5{23} — PERMITTEE
50-5{31} — TRANSPORTING
50-5{32} — VIRGINIA EROSION AND SEDIMENT CONTROL PROGRAM (VESCP) AUTHORITY or PROGRAM AUTHORITY
50-5{33} — VIRGINIA EROSION AND SEDIMENT CONTROL PROGRAM (VESCP) PLAN APPROVING AUTHORITY
50-5{34} — VIRGINIA EROSION AND SEDIMENT CONTROL PROGRAM or VESCP
Ch 50 Art III — Local Erosion and Sediment Control Program
§ 50-6 — Adoption of program.
§ 50-8 — Certification of staff.
§ 50-9 — Plan approving authority.
§ 50-11 — Requirements for approval of erosion and sediment control plan.
§ 50-12 — Owner's responsibility.
§ 50-14 — Wetlands mitigation and stream restoration in multiple jurisdictions.
§ 50-16 — Plan standards.
§ 50-17 — Plan review.
§ 50-18 — Modifications to approved plans.
§ 50-19 — Agency cooperation.
§ 50-20 — Fees; expiration of permit or agreement.
§ 50-21 — Performance bond or other security.
§ 50-22 — Right of entry.
§ 50-24 — On-site inspection; notice of failure to comply.
§ 50-26 — Penalties, injunctions and other legal actions.
Ch 63 — Floodplain Management
Ch 122 — Sand Dunes
Ch 140 — Subdivision of Land
§ 140-2 — Purpose.
140-5{26} — IMPROVEMENTS
§ 140-8 — Conformity with public policy.
§ 140-10 — Consultation.
§ 140-37 — Disturbed areas.
§ 140-39 — Road construction.
§ 140-40 — Private road/driveway exceptions (waivers).
§ 140-49 — Areas of major shoreline erosion.
§ 140-74 — Accordance with other ordinances.
§ 140-91 — Waivers (exceptions) and variance procedures.
Ch 166 — Wetlands
Ch 175 — Zoning
§ 175-17.2 — Development or land use requiring a site development plan.
§ 175-17.3 — Site development plan information required.
§ 175-17.4 — Preparation procedure and specific items, to be shown preparation procedure and specific items to be shown for the site development plan are as follows.
§ 175-17.5 — Minimum standards and improvements required.
§ 175-22.1 — Findings of fact.
175-22.5{18} — PUBLIC ROAD
§ 175-22.9 — Purposes of performance criteria.
§ 175-22.10 — General performance criteria.
§ 175-22.11 — Performance criteria for RPA.
§ 175-22.15 — Buffer area supplemental performance standards.
§ 175-22.17 — Buffer area modifications on agricultural lands.
§ 175-22.21 — Major water quality impact assessment.
§ 175-22.25 — Required plans and studies.
§ 175-22.46 — Waiver for nonconforming structure.
§ 175-22.47 — Exemptions for utilities, railroads and facilities.
§ 175-22.49 — Exemptions in RPA.
§ DL-1 — Disposition of legislation.
add
Excavations
50-5{7} — CHESAPEAKE BAY PRESERVATION AREA LAND-DISTURBING ACTIVITY
50-5{15} — EXCAVATING
50-5{17} — GRADING
50-5{18} — LAND-DISTURBING ACTIVITY
50-5{19} — LAND-DISTURBING PERMIT OR APPROVAL
63-24{7} — DEVELOPMENT
63-24{9} — ENCROACHMENT
63-24{38} — START OF CONSTRUCTION
§ 122-4 — Application for permit; fee.
§ 166-4 — Application for permit; fee.
§ 175-1.3 — Purpose.
175-2.2{176} — SAND, GRAVEL, OR SOIL OPERATIONS
add
Explosives
§ 125-29 — Prohibited discharges.