The subdivision plat shall conform to design
standards that will encourage good development patterns within the
Township. Where either or both an official map or master plan has
or have been adopted, the subdivision shall conform to the proposals
and conditions shown thereon. To ensure the harmonious development
of the Township, a design standard shall be complied with.
All storm drainage facilities shall be constructed
in accordance with the applicable requirements of the RSIS. The developer
or their engineer shall submit complete calculations, specifications,
plans and details for all proposed storm drainage facilities. Any
field samples or laboratory tests required to document the conclusions
of such calculations shall be performed at the sole expense of the
developer.