The following fees are established for application for:
A.
Proposed subdivision classification: $300.
B.
Preliminary approval for major subdivision (up to four lots): $1,000.
(1)
For each additional lot: $150.
C.
Final approval for major subdivision: $600.
D.
Minor subdivision approval: $600.
F.
Site plan:
(1)
Combined final and preliminary plan minimum fee: $600.
(2)
Each additional one-acre lot after first one-acre lot: $200.
(3)
Each additional 1,000 square feet of floor area after of building after first 5,000 square feet of floor area of building: $100.
[Amended 8-17-2010 by Ord. No. 2192-2010]
(4)
Additional hearings, if required on incomplete applications: $250.
G.
Conceptual plan (regular meeting). The amount of any fees for conceptual review shall be a credit towards fees for review of the application for development:
H.
Special meeting (if requested by applicant): $1,500.
I.
Escrow fees for subdivision, site plan or zoning variance. Pursuant to N.J.S.A. 40:55D-53.2, the following amounts shall be required as escrow fees for technical review of applications for development (as defined in N.J.S.A. 40:55D-3):
[Amended 2-26-2002 by Ord. No. 1894-2002]
(1)
For residential property, an initial sum not to exceed $1,000.
(2)
For nonresidential property, an initial sum not to exceed $10,000.
[Amended 2-11-2003 by Ord. No. 1933-2003]
(3)
The Borough Engineer/Zoning Officer, as applicable, shall set the amount of the initial deposit as follows. The criteria for the initial deposit for an application for development proposing a subdivision shall be calculated based on the number of proposed lots. The initial deposit for an application of development proposing a site plan shall be based on one or more of the following criteria:
(4)
Section 125-85Q(1) through (4) is incorporated herein by reference and shall apply to escrow fees for technical review for subdivision, site plan or zoning variances as applicable.
J.
Residential variance (bulk): $100.
[Amended 3-11-2008 by Ord. No. 2108-2008]
(1)
Each additional bulk variance: $25.
K.
Interpretation of code: $300.
[Amended 3-11-2008 by Ord. No. 2108-2008]
L.
Use variance, residential: $400.
[Amended 3-11-2008 by Ord. No. 2108-2008]
M.
Nonresidential variance (bulk): $250.
N.
Nonresidential variance (use): $600.
[Amended 3-11-2008 by Ord. No. 2108-2008]
(1)
Each additional use variance: $250.
O.
Zoning Ordinance and Map: $40.
P.
Sign variation: $250.
[Amended 3-11-2008 by Ord. No. 2108-2008]
Q.
Inspection fees:
(1)
The applicant shall pay to the Borough an inspection fee certified by the Borough Engineer as being based upon the amount of staff time required to inspect on-tract and off-tract improvements and determine completion. The inspection fee payment shall be submitted to the Borough Treasurer/Chief Financial Officer for deposit in a trust fund as an escrow deposit prior to any construction of improvements or the issuance of permits.
(2)
In the event that the Borough Engineer's estimate is insufficient to meet the costs of the aforesaid inspections, the applicant shall be required to reconstitute the escrow deposit in amount to be set by the Borough Engineer.
(3)
The applicant shall be notified of the required escrow deposit and the failure to pay same shall be grounds for dismissal of the application or postponement of the issuance of a certificate of occupancy as the case may be.
(4)
All escrow charges which are due and owing shall become a lien upon the property which is subject of the development application and shall remain so until paid. Overdue escrow charges shall accrue the same interest as established for real property taxes in the Borough. The Borough shall have the same remedies for collection of escrow charges with interest, cost and penalties as it has by law for the collection of taxes upon real property.
R.
Pursuant to N.J.S.A. 52:27D-126.e, any disabled person, as defined in the aforesaid statute, or a parent or sibling of a disabled person, be and they are hereby exempt from any fee or charge which would be imposed in order to secure a construction permit for any construction, reconstruction, alteration or improvement which promotes accessibility to the disabled person's own living unit.
[Added 3-27-2001 by Ord. No. 1849-2001]
T.
Review is required for impervious coverage, setback and zoning compliance, a zoning permit is required prior to work and issuance of a building permit, and the fee shall be $30 for the following:
[Added 8-17-2010 by Ord. No. 2192-2010]
U.
Review is required for variances, site plan, bulk requirements and zoning compliance, a zoning permit is required prior to work and issuance of a building permit, and the fee shall be $45 and the resubmittal fee shall be $25 for the following:
[Added 8-17-2010 by Ord. No. 2192-2010]
V.
Review is required for bulk requirements and zoning compliance, a zoning permit is required prior to work and issuance of a building permit, and the fee shall be $150 and the resubmittal fee shall be $25 for the following:
[Added 8-17-2010 by Ord. No. 2192-2010]