A.
The articles of Division 2 of the Green Book must be strictly adhered to in the work. The applicant's attention is specifically called to the provisions for removal of unsuitable material from the subgrade and to the need for adequate compaction of all fills.
B.
Subbase material is to be placed in roadway areas as required by the Township Engineer to eliminate unstable conditions.
C.
The project must be kept properly drained at all times during construction of the subgrade.