A.
All improvements, including electric, gas, sewer and water lines, shall be installed under the inspection of the Township Engineer, the cost thereof to be borne by the developer or applicant. Inspection costs shall be computed by the Township Engineer in accordance with the schedule in Chapter 182, Fees.
B.
Such fee in the form of cash or certified check shall be deposited with the Clerk of the Township before the commencement of any construction. Any unexpended portion of the inspection fees shall be returned to the depositor, or the developer shall reimburse the Township for inspection costs which exceed the inspection fee.
C.
For the purpose of establishing fee amounts, the applicant's engineer shall furnish to the Township Engineer an estimate of the cost of the improvements based on prices currently common to municipal-type contracts in the area.